ML20136H882

From kanterella
Revision as of 23:23, 13 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to FOIA Request for Two Specified Repts to Be Placed in Pdr.App Identifies Two Repts Placed in PDR
ML20136H882
Person / Time
Site: Seabrook, Bellefonte  Tennessee Valley Authority icon.png
Issue date: 07/27/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sholly S
UNION OF CONCERNED SCIENTISTS
Shared Package
ML20136H886 List:
References
FOIA-85-503, REF-GTECI-A-44, REF-GTECI-EL NUDOCS 8508200534
Download: ML20136H882 (2)


Text

i d 'o, UNITED STATES NUCLEAR REGULATORY COMMISSION

$ E WASHINGTON, D. C. 20555 e f

%, . . . . . f JUL 2 7 505 Mr. Steven C. Sholly Risk Analyst Union of Concerned Scientists 1346 Connecticut Avenue, NW, Suite 1101 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-503

Dear Mr. Sholly:

This is in response to your letter dated July 11, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), that two specified reports be placed in the Public Document Room (PDR).

The enclosed appendix identifies the two reports which are being made available for your inspection and copying at the PDR. The documents will be filed in PDR folder F01A-85-503 under your name.

Sinc ely, f , ,

. . Felton, Director Division of Rules and Records Office of Administration

Enclosure:

As stated B508200534 850727 PDR FOIA PDR SHOLLY85-503

.. . s.

Re: FOIA-85-503 f

4 APPENDIX l ITEM A i 04/1984 " Analysis of a Station Blackout Transient for the Bellefonte j Pressurized Water Reactor" by C. A. Dobbe.

1 ITEM B 09/1984 " Analysis of a Station Blackout Transient at the Seabrook Nuclear Power Plant" by P. Bayless and R. Chambers (EGG-NTP-6700).

i l

i i c k

l l

4 i

,.-r- , ,_ , -.-,.

., . -,-- , ,