ML20136H882
| ML20136H882 | |
| Person / Time | |
|---|---|
| Site: | Seabrook, Bellefonte |
| Issue date: | 07/27/1985 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Sholly S UNION OF CONCERNED SCIENTISTS |
| Shared Package | |
| ML20136H886 | List: |
| References | |
| FOIA-85-503, REF-GTECI-A-44, REF-GTECI-EL NUDOCS 8508200534 | |
| Download: ML20136H882 (2) | |
Text
i d
'o, UNITED STATES NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D. C. 20555 e
f
%,..... f JUL 2 7 505 Mr. Steven C. Sholly Risk Analyst Union of Concerned Scientists 1346 Connecticut Avenue, NW, Suite 1101 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-503
Dear Mr. Sholly:
This is in response to your letter dated July 11, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), that two specified reports be placed in the Public Document Room (PDR).
The enclosed appendix identifies the two reports which are being made available for your inspection and copying at the PDR. The documents will be filed in PDR folder F01A-85-503 under your name.
Sinc ely, f
. Felton, Director Division of Rules and Records Office of Administration
Enclosure:
As stated B508200534 850727 PDR FOIA SHOLLY85-503 PDR
. s.
Re:
FOIA-85-503 f
4 APPENDIX l
ITEM A i
04/1984
" Analysis of a Station Blackout Transient for the Bellefonte j
Pressurized Water Reactor" by C. A. Dobbe.
1 ITEM B 09/1984
" Analysis of a Station Blackout Transient at the Seabrook Nuclear Power Plant" by P. Bayless and R. Chambers (EGG-NTP-6700).
i l
i i
c k
l 4
i
,.-r-
,_, -.-,.