Forwards Application for Amend to License NPF-3,correcting Clerical Error in Action Statement of Tech Spec Section 3.7.9.1 to Make Reporting Requirements Consistent W/Fire Protection Tech Specs.Fee Paid
ML20205C414
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/05/1986
From: Williams J
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20205C419 List:
References
1286, TAC-62221, NUDOCS 8608120324
Download: ML20205C414 (1)


Text

.. ..

Docket No. 50-346 70tego License No. NPF-3 ["[)l[j[][Q Serial No. 1286 August 5, 1986 JOE VVILUAMS. JR.

Semy V(e Rwjert . %w

[419}243 2300 i419}249 5223 Mr. John F. Stolz, Director PWR Project Directorate #6 Division of PWR Licensing-B United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Stolz:

Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for amendment to Facility Operat-ing License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Besse Nuclear Power Station Unit 1 Operating License, be revised to reflect the change attached. The proposed change involves Appendix A, Technical Specification 3.7.9.la.

On December 16, 1984 Toledo Edison submitted a license amendment request (Serial No. 1103) to the NRC to comply with Generic Letter 83-43. Toledo Edison's request was approved by the NRC and issued as Anendment No. 93 to the Davis-Besse Technical Specifications. As previously discussed in Toledo Edison's letter (Serial No. 1275) to the NRC, dated May 8, 1986, Toledo Edison's request contained a clerical error which was incorporated into Amendment No. 93. To correct this error, the enclosed application requests that the word "or" be inserted after the words "...within 7 days,..."

in action statement "a" of rection 3.7.9.1. This change will make the reporting requirements consistent with the reporting requirements concept of the action statements to fire protection Technical Specifications Sections 3.3.3.8b, 3.7.9.2a, and 3.7.10a, which were correctly revised under Amendment No. 93.

Toledo Edison requests that this amendment be issued by November 3, 1986.

Enclosed is a check for $150 as required by 10CFR170.12(c) for a license amendment application.

Very truly yours, S$^$ .- m ,

DRW I 86081-20324 860805 6 \

Attachment DR ADOCK 0500 I

cc: DB-1 NRC Resident Inspector State of Ohio