Forwards Application for Amend to License NPF-3,revising Tech Spec Section 6.0 Re Administrative Controls to Provide Functionally Accurate Depiction of Executive Reporting Relationship of Nuclear Program
ML20237L752
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/31/1987
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237L753 List:
References
1411, TAC-65607, NUDOCS 8709090061
Download: ML20237L752 (1)


Text

. - _ _ - _ _ _ _ _ _ - - _ _ - - _ _ - _ _ _ - - .

Docket No. 50-346 TDLEDO License No. NPF-3 EDISON Serial No. 1411 DONALD C. SHELTON Ves Presdert--Nuclear August 31, 1987 (4191'< 4s2399 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

License Amendment Application to Revise Technical Specification, Section 6.0, Administrative Controls (TAC No. 65607)

Gentlemen:

Enclosed is a revision to a previous application for an Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1. This application. supersedes Serial No. 1408, dated July 31, 1987 in its entirety.

This application requests that the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix A Technical Specifications, be revised to reflect recent organizational changes. The purpose of'this revision is to provide a functionally accurate depiction of the executive reporting relationship of our nuclear program. As revised, Figure 6.2-1 of the Davis-Besse Technical Specifications clearly shows the direct reporting relationship of Mr. Donald Shelton, Vice President, Nuclear, to Mr. Lyman Phillips, the Executive Vice President. In turn, in all nuclear matters at Toledo Edison, Mr1 Phillips reports directly to Mr. Robert Ginn, Chairman of the Board and Chief Executive Officer of Toledo Edison.

This maintains direct access to Mr. Ginn and insures continuing support at Davis-Besse.

Toledo Edison requests that this amendment request be expeditiously approved.

This application supersedes our previous submittal of July 31, 1987 (Serial No. 1408). Therefore, no license application fee per 10CFR170.12(c) is required.

Very trul* yours, Y/Y CAB:p1f 9090061 970831 E,nclosures p ADDCK 05000346 pop cc: DB-1 NRC Resident Inspecto4j)J[' .- >

2I A. B. Davis, Regional Administrator (2 copies)

State of Ohio , ..-'

A. W. DeAgazio, NRC/NRR Davis-Besse Project Manager TOLEDO, OHIO 43652