Forwards Application for Amend to License NPF-3,relocating cycle-specific Core Operating Limits from Tech Specs to Core Operating Limits Rept
ML20245C208
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/16/1989
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245C209 List:
References
GL-88-16, TAC-73245, NUDOCS 8906260095
Download: ML20245C208 (2)


Text

- -

r 6

c ,' ,

'l TOLEDO l

. %s EDISON A Cenu!rur Energy Company Docket Number 50-346 DONALD C. SHELTON License Number NPF-3 p'g49g** r Serial Number 1668 June 16, 1989 United States Nuclear Regulatory Commission

. Document Control Desk Vashington, D. C. 20555

Subject:

. License Amendment Request to Relocate Cycle-Specific Core Operating Limits from Technical Specifications to Core Operating Limits Report (TAC Number 73245) ,

l Gentlemen

  • Enclosed is an application for an Amendment to the Davis-Besse Nuclear Power Station, Unit Number 1 (DBNPS), Operating License Number NPF-3, Appendix A, Technical Specifications. This application requests that the cycle-specific core operating limits be removed from the DBNPS Technical Specifications (TS) and relocated to a Core Operating Limits Report (COLR) which vill document the specific values of parameter. limits resultLg from cycle-specific calculations.

This application is submitted in accordance with Generic Letter 88-16, Removal of Cycle-Specific Parameter Limits from Technical Specifications, dated October 4, 1988 (Log Number 2735), which requires that, for removal of cycle-specific limits from the Technical Specifications, the limits be

' determined using an NRC approved methodology- Babcock & Wilcox (B&V) has previously submitted and receifed NRC approval for Topical Reports BAV-10122A,.

Revision 1, " Normal Operating Controla" (approved by NRC Safety Evaluation Report (SER) dated April 20, 1984), and BAV-10118A, " Core Calculational j

~

Techniques and Procedures" (approved by NRC SER dated September 25, 1979).

These Topical Reports describe the methodology used by B&V to determine the operating limits for axial power imbalance ranges, control rod insertion ranges, axial power shaping rod insertion ranges, and quadrant power tilt limits, and in establishing limiting conditions for operation for the moderator temperature coefficient.

The application also requests that the methodology for calculating programmed rod positions, Attachment 3, be approved as it vill be utilized in determining

]

[' the parameters to be used in the COLR for the Rod Program of TS 3.1.3.7. This methodology is that utilized previously by B&V in calculating programmed rod positions. It should be noted that this methodology has also been requested to be approved in Florida Power Corporation's submittal for Crystal River Unit 3 dated March 22, 1989.

/ 0,0  !

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8906260095 890616 k PDR ADOCK 05000346 lL L P PDC

0 i t Dock 2t Nuxb:r.50-346 0 ..

Li,csnia Nu2bar NPF-3

"- ' Serial Number 1668 Page 2

.The NRC issued a License Amendment to Duke Power Company on January 26, 1989, for the Oconee Nuclear Station Core Operating Limits Report change request.

The Oconee Nuclear. Station was the lead plant for the B&W Owners Group regarding removal.of cycle-specific core operating limits from Technical Specifications. The enclosed application for DBNPS.is similar to the Duke Power proposal and that accepted by the NRC.

Toledo Edison requests this change be issued by December 1, 1989 in order that efforts to prepare and submit a Reload Report for-Cycle 7 for DBNPS are not unnecessarily taken. Implementation of the change is requested to be specified as prior to Mode 4 entry during startup from the sixth refueling outage.

If you have any questions concerning the above, please contact Mr. R. V. Schrauder, Nuclear Licensing Manager, at (419) 249-2366.

Very truly yours, RMC/dlm cc: P. H. Byron, DB-1 NRC Senior Resident Inspector A. B. Davis, Regional Administrator, NRC Region III T. V. Vambach, DB-1 NRC Senior Project Manager State of Ohio i l