Discusses Violation Noted During Insp Rept 50-508/82-04 Re Questionable Welds.Items Identified on Nonconformance Rept (Ncr 15313) & Implementation of Corrective Action Will Be Entered Into Site Tracking Sys & Accomplished at Restart
ML20236S933
Person / Time
Site: Satsop
Issue date: 11/23/1987
From: Olson P
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO3-87-362, NUDOCS 8711300190
Download: ML20236S933 (2)


Text

, - _ _ _ - _ _

, i L

i

-Washington Public Power. Supply System.

Box 1223 . . Elma, Washington 98541 1223 - (206}482 4428 G03-87-362

-November 23, 1987-Docket-No. 50-508 U. S. Nuclear Regulatory Commission Attention: Document Control Washington', D. C. 20555

Subject:

NRC' INSPECTION AT WNP-3/5 IE REPORT NO. 50-508/82-04

' VIOLATION A (NONCOMPLIANCE 50-508/82-04-01)

Reference:

Letter',=G03-82-1240, dated December 2, 1982 R.'S. Leddick to D. M._Sternberg, same. subject The referenced letter provided the final report. for the subject violation.

This report stated that all questionable welds joining CB&I Class D materials j hadL been visually examined and all welds found deficient as a result of these  ;

inspections, had been repaired. -

While in the process of reviewing this item for- closure, it was found -that all the reports for these inspections were not available. An investigation was performed by.-both Ebasco and CB&I to determine whether all the inspections had- been performed and if .so, to locate the required documentation.

No further proof of the required inspections having been performed has resulted from these investigations. Therefore, it must be assumed that these inspections have not as yet been performed.

8711300190 871123 PDR ADOCK 05000500 G PDR rEol

'l# u

l h U. S. Nuclear Regulatory Commission i~ -

Page Two These items have been identified on a Nonconformance Report (NCR 15313) and the implementation of corrective action will be entered into the Site tracking system to be accomplished at Re-start.

Should you have any questions or require further information, please contact me directly.

P .

WNP-3 Site anager cc: Mr. J. A. Adams, NESCO I Mr. R. M. Boucher, Pacific Power & Light Co.

Mr. W. L. Bryan, Washington Water Power Co.

Mr. R. E. Dyer, Portland General Electric Co.

Mr. W. J. Finnegan', Puget Sound Power & Light Co.

Mr. J. R. Lewis, BPA Mr. D. Kirsch, U. S. NRC Mr. J. B. Martin, Region V Administrator Mr. N. S. Reynolds', Bishop, Cook', Purcell & Reynolds Mr. D. Smithpeter, BPA Ms. R. M. Taylor, Ebasco - Elma Mr. A. Toth, U. S. NRC Ebasco - New York l