ML20245C840

From kanterella
Revision as of 22:50, 16 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Notice of Withdrawal of 840116 & 850329 Tech Spec Change Requests 111 & 134,respectively,to License DPR-72. Util Committed to Incorporate Proposed Changes in Tech Spec Improvement Program,Per 890411 Ltr
ML20245C840
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/20/1989
From: Silver H
Office of Nuclear Reactor Regulation
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20245C843 List:
References
GL-83-28, TAC-55351, NUDOCS 8904270414
Download: ML20245C840 (2)


Text

_. -__ - _ - _

r April 20,.1989 j,. .,

Docket No. 50-302 DISTRIBUTION

$1EiEW7TWf@ HBerkow NRC T Lohl"PDRs DMiller PDII-2 Rdg. HSilver

-Mr.- W. S. Wilgus SVarga,14/E/4 OGC (info.only)

Vice' President, Nuclear Operations Glainas,14/H/3 EJordan,3302MNBB Florida Power Corporation- DLasher, 7/E/12 BGrimes, 9/A/2 L ATTN: Manager, Nuclear Operations SNewberry , 7/E/12 ACRS(10)

Licensing BWilson, RII P. O. Box 219-NA-21 Crystal River, Florida 32629

Dear Mr. Wilgus:

SUBJECT:

CRYSTAL RIVER UNIT 3 - WITHDRAWAL OF TECHNICAL SPECIFICATION CHANGE AND REQUEST 134, ATWS-- REACTORNUMBERS TRIP BREAKER 111, ATWS SHUNT TRIP -(TAC SILICON CONTROL NO. 55351 RECTIF By letter dated ~ January 16,1984 (Change Request No.111), you applied for an anendment to the Crystal River Unit 3 Operating License No. DPR-72. The proposed change would have modified the facility Technical Specifications to include the silicon-controlled rectifiers in appropriate surveillance and test sections, in response to Generic Letter 83-28, Item 4'.4. Also, by letter dated March 29,1985 (Change Request No.134), you applied for an amendment which would add to the Technical Specifications operability and surveillance require-ments for the reactor trip breaker shunt trip attachment, in response to Generic Letter 83-28, Item .4.3.

Subsequently, by. separate letters dated April 11, 1989, you withdrew both amend-ment requests, and committed to incorporate the proposed changes consistent with existing NRC staff guidance in the Technical Specification Improvement Program (TSIP). You further stated that until approval of the TSIP submittal, the operability requirements of HRC Generic Letter 8b-10 will apply, and that surveillance procedures will remain in accordance with Generic Letter 85-10.

' These withdrawals are accepted, and TAC No. 55351 is closed.

The Commission has filed the enclosed Notice of Withdrawal of Applications for Amendments to Facility Operating License with the Office of the Federal' Register for publication.

Sincerely, y ,

Original signed by Harley Silver, Project Manager n Project Directorate II-2 j 00 Division of Reactor Projects-1/II .

88$ Office of Nuclear Peactor Regulation gg

Enclosure:

As stated g cc w/ enclosure:

l gg See next page

-M D j

ox

[ TAC NO 55351] g

/ \

" @@a. L D r 2 PM:PDII-2 HSilver:bd l

Id  !

i OL/g/89 04/ g 89 34/>*/ 89

4 a

  • Mr. W. S. Wilgus Crystal River Unit No. 3 Nuclear Florida Power Corporation Generating Plant cc:

Mr. A. H. Stephens State Planning and Development General Counsel Clearinghouse Florida Power Corporation Office of Planning and Budget MAC - ASD Executive Office of the Governor P. O. Box 14042 The Capitol Building St. Petersburg, Florida 33733 Tallahassee, Florida 32301 Mr. P. F. McKee, Director Chairman Nuclear Plant Operations Board of County Commissioners Florida Power Corporation Citrus County P. O. Box 219-NA-2C 110 North Apopka Avenue Crystal River, Floride 32629 Inverness, Florida 32650 Mr. Robert B. Borsum Mr. Rolf C. Widell, Director Babcock & Wilcox Nuclear Operations Site Support Nuclear Power Generation Division Florida Power Corporation 1700 Rockville Pike, Suite 525 P.O. Box 219-NA-21 ,

Rockville, Maryland 20052 Crystal River, Florida 32629 i Resident Inspector Mr. Gary L. Boldt U.S. Nuclear Regulatory Comission Vice President, Nuclear Production 15760 West Powerline Street Florida Power Corporation Crystal River, Florida 32629 P. O. Box 219-SA-2C Crystal River, Florida 32629 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 l Mr. Jacob Daniel Nash I Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Administrator l

Department of Environmental Regulation Power Plant Siting Section State of Florida

' 600 2 Blair Stone Road Tallahassee, Florida 32301 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 l

_ _ _ _ _ _ _ _ _ _ _