Forwards Insp Rept 50-382/99-05 on 990228-0410.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
ML20206S441
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/10/1999
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20206S446 List:
References
50-382-99-05, 50-382-99-5, NUDOCS 9905210137
Download: ML20206S441 (5)


See also: IR 05000382/1999005

Text

.

  1. "%, UNITED STATES

l

.  : . NUCLEAR REGULATORY COMMISSION

a S

e REGloN IV

e 611 RYAN PLAZA oRIVE, sulTE 400

+ ARLINGTON, TEXAS 760118064

,,,g

MAY l 01999 l

l

Charles M. Dugger, Vice President l

Operations - Waterford 3

Entergy Operations, Inc.

P.O. Box B

Kiliona, Louisiana 70066

SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-05

Dear Mr. Dugger:

This refers to the inspection conducted on February 28 through April 10,1999, at the Waterford

Steam Electric Station, Unit 3, facility. The enclosed report presents the results of this

inspection.

During the 6-week period covered by this inspection, your conduct of activities at Waterford 3

was generally characterized by safety-conscious operations, sound engineering and

maintenance practices, and careful radiological controls. However, the number of personnel

errors, identified during Refueling Outage 9 demonstrated a lack of attention to detail by plant

personnel. The errors discussed in Sections O4.1, M4.1, and S1.1 of the enclosed report

involve a number of different onsite organizations. These findings indicate that further

management attention may be warranted to improve human performance and reduce the

number of personnel errors. l

Based on the results of this inspection, the NRC has determined that three violations of NRC

requirements occurred. These violations are being treated as noncited violations (NCV),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violation or severity level of these NCVs, you

ishould provide a response within 30 days of the date of this inspection report, with the basis for

.your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

.-

IE[. Efrmi irector

ivision of Re or Projects

9905210137 990510 e

PDR ADOCK 05000382

G PDR

a

.

,

Entergy Operations, Inc. -2-

Docket No.: 50-382

License No.: NPF-38

Enclosure:

NRC inspection Report No.

50-382/99-05

cc w/ enclosure:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995 )

Jackson, Mississippi 39286-1995 .

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

General Manager, Plant Operations

Waterford 3 SES

- Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Manager - Licensing Manager l

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Director, Nuclear Safety &

Regulatory Affairs

Waterford 3 SES

Entergy Operations, Inc.

i

P.O. Box B

Killona, Louisiana 70066

'

.

.

Entergy Operati ns, c. -3-

I

I

Ronald L. Wascom, Administrator

Louisiana Radiation Protection Division

l P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

Parish President

St. Charles' Parish

P.O. Box 302

Hahnville, Louisiana 70057'

Winston & Strawn

1400 L Street, N.W. j

'

Washington, D.C. 20005-3502

l

.

.

MAY l 01999

Entergy Operations, Inc. -4-

i

E Mail report to T. Frye (TJF) l

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) l

E-Mail report to Richard Correia (RPC) l

E Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

i

bec distrib. by RIV: l

Regional Administrator Resident Inspector I

DRP Director DRS-PSB

DRS Director MIS System

Branch Chief (DRP/D) RIV File

Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

l

I

l

i

l

l

DOCUMENT NAME: R:\_WAEWT905RP.TRF j

To receive copy of document, indicate in box: 'C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy l

RIV:RI , ,f RIV: SRI C:DRP/D ._

JMKeeton DM TRFarnholtzMf6 PHHarrell(PW

F

04/20/99 VL ' '

054/99 0540/99

OFFICIAL RECORD COPY

.

1

'

MAY l O Eli I

Entergy Operations, Inc. -4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)  !

bec distrib, by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

DRS Director MIS System

i

Branch Chief (DRP/D) RIV File

Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

l

\

\

!

DOCUMENT NAME: R:\_ WAEWT905RP.TRF j

To receive copy of document, Indicate in box: 'C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy I

RIV:RI ,_a RIV: SRI _

C:DRP/D ., l

JMKeeton @M TRFarnholtzMLL PHHarrell(PW

F

04/20/99 VL '~

054a/99 05b/99 l

OFFICIAL RECORD COPY

)

M0029 l