ML20151E350

From kanterella
Revision as of 13:01, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amend to License NPF-3 Re Startup Feedwater Pump License Condition & Auxiliary Feedwater Sys Surveillance Requirements
ML20151E350
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/15/1988
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151E352 List:
References
1489, TAC-67392, NUDOCS 8807260033
Download: ML20151E350 (2)


Text

\

s, i b -

e

~

TOLEDO

%sm EDISON acas.n-mc m DONAU) C SHELTON V e prescerg Axjer Docket No. 50-346 smaine License No. NPF-3 Serial No. 1489 July 15, 1988 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Subj ec t : License Amendment Application Regarding the Startup Feedvater Pump License Condition and Specification 4.0.4 Applicability to the Auxillary Feedvater System Surveillance Requirements (TAC No. 67392)

Gentlemen:

Enclosed is an application for an Amendment to the Davis-Besse Nuclear Power Station, Unit No. 1 Operating license No. NPF-3, License Conditions and Appendix A Technical Specification.

This application is being submitted in conjunction with Toledb Edison's plans to repover the startup .feedvater pump during the fif th refueling outage as previously described in Toledo Edison's letter to the NRC (Serial No. 1412) dated December 14, 1987. The enclosed application requests that the Operating license be revised to reflect the changes attached. The proposed changes involve deleting the startup feedvater pump License Condition 2.C.(3)(t) and adding a Surveillance Requirement to the Auxiliary Feedvater System Technical Specification. Surveillance Requirement 4.7.1.2.a.4 would require verifying that the startup feedvater pump suction, discharge and cooling vater lines are isolated, thereby eliminating concerns resulting from non-seismic /high energy and moderate energy pipe failures in the auxiliary feedvater pump rooms. This requirement vill preclude use of the startup feedvater pump in Modea 1, 2 and 3 when the auxiliary feedvater pumps are required to be operable. This application also requests updating the Auxiliary Feedvater System Basis to reflect the additional surveillance,.

Additionally, this application proposes to clarify that the provisions of Specification 4.0.4 are not applicable for entry into Mode 3 for tso of the Auxiliary Feedvater System Surveillance Requirements.

Toledo Ediron requests that the License Condition be deleted and the Technical  :

Specification Amendment be issued by August 18, 1988 for implementation prior to Cycle 6 operation.  !

8807260033 080715 PDR ADDCK 05000346 P PDC THE TOLEDO EDtSON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHlO 43552 I

I .

3

Y, h '

~

.Dockat Ns. 50-346

, -Licznsa No. NPF-3 Serial No. 1489 Page'2-Check No. 59918 in the amount of $150, dated Marc'h 20, 1988, was previously

~

submitted for this License Amendment application as required by 10CFR170.12(c).

Very trul yours, v

' CAB: sag Enclosures cc: DB-1 Resident Inspector ,,

1 A. B. Davis, Regional Adminfstrator ,

A. V. DeAgazio, NRC/NRR Davis-Besse Project Manager i

. State of Ohio J