Requests Rev of Restart Plan & Power Ascension Documentation for Facility Informing of No Sufficient Need for Holdup at Mode 1
ML20151M399
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 08/02/1988
From: Partlow J
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8808050143
Download: ML20151M399 (2)


Text

n A .

August 2, 1988 Docket No. 50-3?7 DISTRIBUTION

__. Docket. File; n MSimms NRC PDR JRutberg Local PDR OGC Projects Rdg FMiraglia Mr. S. A. White Sqn. Rdg Edordan Senior Vice President, Nuclear Power JPartlow FMcCoy Tennessee Valley Authority SRichardson ACRS (10) 6N 38A Lookout Place SBlack TVA-Rockville 1101 Market Street BDLiaw Chattanooga, Tennessee- 37402-2801 JDonohew

Dear Mr. White:

SUBJECT:

NRC RESTART HOLDPOINTS SEQUOYAH NUCLEAR PLANT, UNIT 1 We have reviewed the enclosures to the letter dated July 18, 1988, from the Tennessee Valley Authority (TVA). These enclosures provided charts t f the heatup profile and the power ascension program for the restart of Unit 1 from its current outage. In these enclosures, TVA has identified five holdpoints:

Mode 4, Mode 2, 30% Power, 45% Power and 75% Power. Only two of these holdpoints are identified by TVA as NRC holdpoints: Mode 2 and 75% Power.

For Unit 2 restart, there were also NRC holdpoints at Mode 4, Mode 1 and 30% Power.

In order to ensure that the NRC is kept aware of plant status and that all the appropriate issues are discussed with the NRC and resolved prior to proceeding to the next power level, we have concluded that there will be NRC holdpoints for the restart of Unit 1 at Mode 4, Mode 2, 30% Power and 75% Power. We agree that there is not a sufficient need for an NRC holdpoint at Mode 1.

Please revise the restart plan and power ascension documentation for Unit 1 Also, ensure that appropriate personnel are aware of these revisions.

The reporting and/or recordkeeping requirements contained in this letter affect fewer then ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, ORIGINAL SIGNED BY:

' JAMES G. PARTLOW James'G. Partlow, Director l Office of Special Projects l

g

$8 cc: See next page Os gg , AV toc OSP:TVA/LA :y/PM >0 -

~ P GVA:AD 8 MSimms [])/( [hew0 I BDL aw hfMcCoy 8 7/488 - g/ l /88 9 l g@0. 7g/88 g8 7

/A co 0.

D OSP:D fu, h rdson JPartl I l f/[ /88 g/}/88 i 1

, . . tf a g .\

Mr. S. A. White Tennessee Valley Authority Sequoyah Nuclear Plant cc:

General Counsel Regional Administrator, Region II Tennessee Valley Authority U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

400 West Summit Hill Drive 511 833 aclanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Inspector /Sequoyah NP Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Commission Tennessee Valley Authority 2600 Igou Ferry Road SN 1578 Lookout Place Soddy Daisy, Tennessee 37379 Chattanooga, Tennessee 37402-2801 ,

Mr. John L. LaPaint Mr. Michael H. Mobley, Director Tennessee Valley Authority Division of Radiolohical Health Sequoyah Nuclear Plant T.E.R.R.A. Building, 6th Floor P.O. Box 2000 150 9th Avenue North Soddy Daisy, Tennessee 37311 Nashville, Tennessee 37219-5404 Mr. M. R. Harding Dr. Henry Myers, Science Advisor Tennessee Valley Authority Committee on Interior Sequoyah Nuclear Plant and Insular Affairs P.O. Box 2000 U.S. House of Representatives Soddy Daisy, Tennessee 37379 Washington, D.C. 20515 Mr. D. L. Williams Tennessee Valley Authority 400 West Summit Hill Drive W10 B85 Knoxville, Tennessae 37902 County Judge l

Hamilton County Courthouse Chattanooga, Tennessee 37402 i

t i

(

l l