ML20151X772

From kanterella
Revision as of 12:38, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-338/OL-88-01 Administered on 880216-25.Util Comments Re Exams Also Encl
ML20151X772
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/27/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20151X777 List:
References
NUDOCS 8805040248
Download: ML20151X772 (2)


Text

-

April 27, 1988 Virginia Electric and Power Company ATTN: Mr. W. L. Stewart Vice President, Nuclear Operations P.'0. Box 26666 Richmond, VA 23261 Gentlemen:

SUBJECT:

NORTH ANNA POWER STATION EXAMINATION REPORT 338/0L-88-01 The NRC administered examinations on February 16-25, 1988, to employees of your company who had applied for licenses to operate the North Anna Power Station.

At the conclusion of.the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the

> operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

j_ Copies of the written examination questions and answer key are included in this report as Enclosure 2. Facil.ity comments regarding the written examination are included in this report as Enclosure 3. Enclosure 4 summarizes simulator performance deficiencies observed during conduct of the simulator portion of the operating examinations.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures -

will be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (ORIGINAL SIGNED BY C. A. JULIAN)

Caudie A. Julian, Chief Operations Branch Division of Reactor Safety

Enclosures:

1. Exam Report 50-338/0L-88-01 2 .- R0/SR0 Exam Questions & Answer Key
3. Facility Coments
4. Simulation Facility Fidelity Report cc w/encls 1 & 3:

i B. Shriver, Corporate Training Direst r E. W. Harrell, Plant Manager cc w/encls 1, 2, 3 & 4:

l L. Edmonds, Site Training Director bec: (See Page 2)

BBP 288! 8%8$p l v y, xc w

A P ril.27, 1988-Virginia Electric and Power Company. -2 .

bec w/ enc 1 1:

L. Engle, Project Manager, NRR F. S. Cantrell, Section Chief, DRP J. Moorman, OL Examiner, DRS' Commonwealth'of Virginia bec w/encls 1, 2 3 & 4:

Senior Resident Inspe'ctor Operator-Licensing Branch, DLPQ
NRR Document Control Desk Sonalysts, Inc., Contractor l

RII RI R1 R RIl PRShaw:obw JMo an sto Junro CAJu ian ,

04/ /88 04/Q/88 0 a/88 04p./88 04/2788 l

.- . . - . - - - - . - _ - _ - - -_ - .-- - . -