ML20151X829

From kanterella
Jump to navigation Jump to search
Forwards Comments on Exams Administered at Facility on 880216-26
ML20151X829
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/22/1988
From: Harrell E
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Moorman J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20151X777 List:
References
NUDOCS 8805040263
Download: ML20151X829 (72)


Text

{{#Wiki_filter:-

    % W              es
                                                                           .M arh Anou is sav %2 fo't

( IM t )l% c lL a all) ENCLOSURE 3 " * "# " *"'" # " "

 ~

a O VIItGINIA POWEft February 22, 1988 Mr. James Moorman Operator Licensing Section Division of Reactor Safety kegion II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta St. , N.W. Atlanta, Georgia 30323

Dear Mr. Moorman:

l In accordance with ES 201 of NUREG 1021 Virginia Electric and Power Company ereby makes official submittal of comments concerning the NRC examinations administered at the North Anna Power Station February 16 through 26, 1988. Detailed question-by-question comments on the written examinations are attached. Your consideration of these comments is requested. Very truly yo ,

         ^)                    ,

E. WayneAlarrell M/ Station Manager Attachment pc: Mr. W. L. Stewart Dr. T. M. Willie.ms Mr. L. L. Edmonds 8805040263 000427 PDR V ADOCK 05000330 PDR l

w

e .

Attachm:nt h Page 1 02/22/88 NORTH ANNA POWER STATION COMMENTS ON WRITTEN NRC EXAMINATIONS ADMINISTERED ON FEBRUARY 16, 1988 A. Reactor Operator E:< amination

1. Question 1.15:

Comment: The answer key does not take inte account the greater density of the RCS at temperatures below sperating temperature. The greator density of the RCS requires more boric acid per ppm than at operdting tamperatures. Consequently, either the NOMOGRAPH CORRECTION FACTORS of Figure 1.3 should be applied or the equation V B

                               "     "{    '

i l expressed on Figure 1.1 8.33 12,950-Cf ] should be used. Ths nomographs of Flo,ure 1.1 are accurate only at operating

  • temperatures , and it is incorrect to use them unadjusted since they will underestimato the amount of boron required, which is a nonconservative error. In addition, the question does not specify at what temperature the -2200 pcm of reactivity is to exist. If it is 500*F, then the NOMOGRAPH CORRECTION FACTOR is 1.05 and approximately 1280 gallons of Boric acid would be required. If it is cold shutdown temperature of 100'F, then the correction factor is 1.47 and about 1800 gallons of Boric acid would be required. Also, not knowing temperature means that the student does not know what value to use for the mass of the RCS if he chooses to work the problem using the equation
                       \'B
                           =   M    in [12,950 C g]

8.33 12,950-Cf ]. An additional minor point is that the concentration in the Boric Acfi Storage Tanks should be specified as 12,950 ppm. l North Anna Technical Specifications allow the Boric Acid Storage Tank concentration to be between 12,950 ppm and 15,750 ppm. If the concentration is anything other than 12,950 ppm, i then the nomographs of Figure 1.1 are inaccurate. Although, ' any error in this case is conservative. Recommendation: Change answer key to include the use of NOMOGRAPH CORRECTION FACTORS and accept any NOMOGRAPH l CORRECTION FACTOR as correct since the temperature is not specified. Also, count as correct the use of equation V B H In (12,950-C ] 8.33 12,950-Cg ] and accept any assumed value for M, once again because the temperature is not specified.

Reference:

Attachment (RI), Figure 1.1 and 1.3 of the NRC North Anna Reactor Operator Exam. North Anna Technical Specifications page 3/41 - 16, c

' Attcchm:r.t n Page 2 02/22/88

2. Question 1.17:

Comment: The change in RCS Tave from 0*4 to 100% power at North Anna is 39.8'F, not 30.4*F. Correct solution: Tave: (39. 8'F)( . 25 )(-15) = -149. 25 Power: (25)(-12) = -300 Void: = -25 Xenon: = -50 Total: = -524.25 Boron: 524.25 = -58.25

                                                                                   -9 58.25 ppm dilution.

Recommendation: Change answer key to correct solution.

Reference:

Attachment (R2), North Anna Precautions, Limitations, and Setpoints Document, pogo 27.

3. Question 1.19:

Comment: The answer key is correct concerning the real subcooling margin. However, the Inadequate Core Cooling Monitor uses the five highest thermocouple readings as input for T , and this is the value used to calculate the subcoo:ing H margin displayed on the monitor in the control room. Typically, the five highest thermocouples read approximately 635'F; thus the indicated subevoling margin is typically less than the real subcooling margin, and is therefore conservative. l The cendidates may therefore have used 635*F as T instead of H ' 618.8'F. l Recommendation: Have grader place emphasis on calculational I method, rather than the correct answer.

Reference:

Attachment (R3), Inadequate Core Cooling Monitor System Description, North Anna, U. tits 1 and 2, pages 9 and 10,

4. Question 1.21:

Comment: The definition of an ampere-hour is the charge equivalent of one ampere of current delivered for one hour. The statement concerning minimum cell voltage applies to battery ampere-hour ratings only. The question states only to define ampere-hour, not to define a batterv ampere-hour rating. Recommendation: Remove the clause "before cell voltage drops to a specific minimum value" f rom the answer key.

Reference:

Attachment (R4), North Anna Training Guide NCRODP 90.3 Section 1 (page 1.17).

' Attachment n Pag 2 3 02/22/88

5. Question 2.01:

Comment: The 480 VAC vital bus should be referrea to as a 480 V emergency bus vice vital bus. Recommendation: Change NRC question bank to reflect correct terminology.

Reference:

Attachment (RS), North Anna Training Text NCRODP 90.3, REV 1 Section 1, page 1.21,

6. Question 2.06b:

Comment: Component Cooling Water surge tank does not have a rupture disc. Recommendation: Change answer to "False."

Reference:

Attachment (R6 and R7), NCRODP 51, Component Cooling System description. Drawing 11715-FM-079A, Sheet 1 of 3.

7. Question 2.08:

Comment: Answer key ((11) refers to "Peak Centerline temperature" vice "Peak Clad temperature." Recommendation: Change answer key (11 to read "Peak Clad temperature.'" Referente: Attachment (R8 and R9), 10CFR50.46(b)(1), North Anna Tra ining Text NCRODP 91.1, Section 1 page 1.8.

8. Question 2.09:

Comment: Question asked for diesel shutdown signals but did I not specify Automatic only. Answer key does not address Emergency manual shutdown pushbuttons. Recommendation: Change answer key to read: Accept any two of the following:

1. Generator dif ferential
2. Engine overspeed
3. Emergency Stop manual pushbuttons

Reference:

Attachment (R10) North Anna Training Text NCRODP 90.4 Section 2, page 2.19, 2.24.

 ,                                                                          Attachmtnt Page 4 02/22/88 L   Question 2.10:

Comment: Answer key does not give equal credit for "master cycler counter." Master cycler has a manual step feature which should have to be restored if Rod Control Startup pushbuttons were mistakenly depressed during mode 1 operations. Recommendation: Accept "Master cycler" as an equal point value answer.

Reference:

Attachment (R11 and R12), North Anna Training text NCRODP 93.5, Section 2 Part d, Westinghouse Tech Manual, pages 2-10, 2-11, and 2-12.

10. Question 2.11:

Comn ent : Question asks for "Barriers." The intact barriers the Critical safety functions serve to protect do not include "distance." The use of distance on a transparency was utilized while discussing a barrier against radiation release. Recommendation: Change the answer key as follows:

1. Fuel matrix or pellet
2. Fuel clad
3. RCS piping
4. Containment

Reference:

Attachment (R13 and R14) . North Anna Training text NCR0DP 91.1 Section 1, pages 1.5 and 1.6. NCRODP 95.3 transparencies 2.2 and 2.6.

11. Question 2.12:

Comment: The flow restrictor described in the training text is not the same as found at other facilities. The flow restrictor at North Anna is the flow venturi vice a perforated plate found for example at Surry Power Station. Re<:ommendat ion : Delete the question or accept the following:

1. Limits blowdown following a Main Steam Line Break.
2. Provides a venturi for the measurement of steam flow.

Rg erence: Attachment (R15), North Anna Training text NCRODP 89.1, section 1 pages 1.8,1.9, and 1.35.

12. Question'. M :

Comm e r. . : The actual Safety injection signal may have been reset but a swapover will still occur if the SI Recirc Mode Signal is still p asent. This Recirc Mode Signal has a sepcrate set of reset pushbuttens. Recommendation: Accept "SI recirc mode signal present" or "Safety injection signal present."

Reference:

Attachment (R16), North Anna Training text NCRODP a 91.1, Section 2 page 2.26.

Attachm:nt Page 5 02/22/88

13. Question 3.02:

Comment: None of the answers are correct. Recommendation: Delete question.

Reference:

Attachment (R17), North Anna Training text NCRODP 88.3, Section 1 page 1.6.

14. Question 3.04:

Comment: Question is potentially confusing as written. Rod Speed "Indication on the meter" will never go below 8 steps / min with rod control in "Auto" even though temperature mismatch is zero. The expected indication therefore is 8 steps / min and no signal to move the rods with a mismatch of 1 degree for example. Candidates may answer the question based on the fact the rods will not move with the mismatch thus answer zero as the answer key states. Recommendation: Accept either zero or 8 steps / min for statements 2, 3, and 5.

Reference:

Attachment (R18), North Anna Training text NCRODP 93.5, Part D - Automatic Rod Control Unit.

15. Question 3.07(b):

Comment: Coincidence is 2/3 vice 2/4. Recommendation: Accept 2/3 coincidence instead of 2/4.

Reference:

Attachment (R19 and R2C), Technical Specification 3.3.1, page 3-2. Westinghouse logic NA-DV-5655033 page 5 of 16.

16. Question 3.08:

Comment: Answer key lists 2/4 power ranges greater than 10% power (P-10). Should be the logic for (P-7) which is 2/4 power ranges greater than 10% and 1/2 impulse pressures greater than 10%. Recommendation: Change answer key as described above.

Reference:

Attachment (R-21), Technical Specification 3.3.1 page 3.8. i a

, Attachm:nt > Paga 6 02/22/88

17. Question 3.13:

Comment: Question asked for "Plant Parameter." Candidates may only answer "Reactor coolant system average temperature, Tavg," ' and not include auctioneered high tavg. Recommendation: Do not penalize candidate if he did not include auctioneered high.

Reference:

N/A

18. Question 3.14:

Comment: Answer key is written as fo'. lows:

                  "Steam dumps will remain closed until header setpoint is reached (1.0)."
                  "Dumps would cycle open ( .3) . "

To recognize the dumps would cycle open when in the steam pressure mode should be full crqdit vice the point distribution on the answer key. Recommendation: Consider the above when grading.

Reference:

N/A

19. Question 3.17:

Comment: Wording in Technical Specification bases is not the same as the Training text. They mean the same but the T.S. uses DNB vice DNBR. Recommendation: Accept wording on the answer key or as stated in the technical specification bases.

Reference:

Attachment (R22), Unit 1 Technical bases pages B 2-4 and B 2-5. l i

20. Question 4.15:

1 Comment: Answer key instructs operator to Open t!0V 2350.  ?!OV 2350 is the Unit 2 Emergency Borate Valve.  !!OV 1350 is the Unit 1 Emergency Borate Valve. Answer key lists only 3 af the 4 actions needed to accomplish j the step "Initiate Emergency Boration" for FRP S.I. Should l also include "Check pressurizer pressure less than 2335 psig." Recommendation: Accept ?!0V 2350 or t!OV 1350 as the emergency borate valve. Include in the answer key "Check pressurizer pressure less than 2335 psig." , l

Reference:

Attachment (R23), FRP S-1. l 1 i l 1 E

 .                                                                      Attcchment Pags 7 02/22/88
21. Question 4.17(b):

Comment: Answer on answer key is correct but in addition "to insure hot channel factors limits are maintained" is correct. Recommendation: Accept above as a correct answer or answer specified in answer key.

Reference:

Attachment (R24), Technical bases page B 3/4 2-4.

22. Question 4.18:

Comment: Question referred to "1-OP-1.5:" which is a unit 1 OP. Answer refers to Unit 2 Technical Specification which has five bases where unit I has only three. Racommendation: Accept 3 out of 5 bases asked for.

Reference:

Attachment (R25), Unit 1 and Unit 2 Technical Specification bases for minimum temp for criticality. l 1 I I l l

r ,' Attachmtnt Paga 0 02/22/88 B. Senior Reactor Operator Exam

1. Question 5.04:

Comment: The correct answer to this question is "c", not "d", as the attached completed PT-23 shows. Recommendation: Change correct answer to "c."

Reference:

Attachment (S1), North Anna Periodic Test 1-PT-23,

2. Question 5.19 :

Comment: The change in RCS Tave from 0% to 100% power at Nor th Anna is 39.8'F, not 30.4*F. Correct solution: Tave: (39.8*F)( . 25)(-15) = -149. 25 Power: (25)(-12) = -300 Void: = -25 Xenon: = -50 Total: = -524.25 Boron: 524.25 = -58.25

                                   -9 58.25 ppm dilution.

Recommendation: Change answer key to correct solution.

Reference:

Attachment (S2), North Anna Precautions, Limitations, and Setpoints Document, page 27. '

3. Question 5.21:

Comment: The answer key is correct concerning the real subcooling margin. However, the Inadequate Core Cooling , Monitor uses the five highest thermocouple readings as input , for T H, and this is the value used to calculate the subcooling margin displayed on the monitor in the control room. Typically, the five highest thermocouples read approximately 635'F; thus the indicated subcooling margin is typically less than the real subcooling margin, and is therefore conservative. The candidates may therefore have used 635'F as T instead of  ; H 618.8'F.  ! Recommendation: Have grader place emphasis on calculational  ! method, rather than the correct answer.

Reference:

Attachment (S3), Inadequate Core Coolirg Monitor l System Description, North Anna, Units 1 and 2, pages 9 and 10. l l l

Attachmsnt Paga 9 1 02/22/88 ) l 4, Question 5.22: Comment: The definition of an ampere-hour is the charge equivalent of one ampere of current delivered for one hour.  ! The statement concerning minimum cell voltage applies to battery ampere-hour ratings only. The question states only to define ampere-hour, not to define a battery ampere-hour rating. 1 Recommendation: Remove the clause "before cell voltage drops to a specific minimum value" from the answer key.

Reference:

Attachment (S4), North Anns Training Guide NCR0DP 90.3 Section 1 (page 1.17) .

5. Question 6.01:

Comment: Answer key (#1) refers to "Peak Centerline , temperature" vice "Peak Clad temperature." Recommendation: Change e.nswer key #1 to read "Peak Clad temperature." Re f e rene.e : Attachment (S5 and S6), 10CFR50.46(b)(1), North Anna Training Text NCRODP 91.1, Section 1 page 1.8.

6. Question 6.05:

Comment: None of the answers are correct. Recommendation: Delete question.

Reference:

Attachment (S7), North Anna Training text NCRODP 88.3, Section 1 page 1.6.

7. Question 6.11:

Comment: Question is potentially confusing as written. Rod Speed "Indication on the meter" will never go below 8 steps / min with rod control in "Auto" even though temperature mismatch is . zero. The expected indication therefore is 8 steps / min and no ' signal to move the rods with a mismatch of 1 degree for example. Candidates may answer the question based on the fact the rods will not move with the mismatch thus answer zero as the answer key states. J i Recommendation: Accept either zero or 8 steps / min for statements 2, 3, and 5.

Reference:

Attachment (S8), North Anna Training text NCRODP 93.5, Part D - Automatic Rod Control Unit. 1 i 1  ; l

e. .

Attachment  ! Page 10 02/22/88

8. Question 6.12:

Comment: Answer key does not give equal credit for "master  ; cycler counter." Master cycler has a manual step feature which should have to be restored if Rod Control Startup pushbuttons were mistakenly depressed during mode 1 operations. Recommendation: Accept "Master cycler" as an equal point value answer, i

Reference:

Attachment (S9 and S10), North Anna Training text I SCRODP 93.5, Section 2 Part d. Westinghouse Tech manual pages 2-10, 2-11, and 2-12. l

9. Question 6.13:

Comment: The flow restrictor described in the training text is not the same as found at other facilities. The flow restrictor at North Anna is the flow venturi vice a perforated plate found for example at Surry Power Station.  ; Recommendation: Delete the question or accept the following:

1. Limits blowdown following a Main Steam Line Break.
2. Provides a venturi for the measurement of steam flow.

Reference:

Attachment (S11), North Anna Training text NCRODP , 89.1, section 1 pages 1. 8.1.9, and 1. 35.

10. Question 6.14: i Comment: Answer key lists 2/4 power ranges greater than 10%

power (P-10). Should be the logic for (P-7) which is 2/4 power ranges greater than 10% and 1/2 impulse pressures greater than 10%. Recommendation: Change answer key as described above.

Reference:

Attachment (S-12), Technical Specification 3.3.1 page 3.8.

11. Question 6.19 :

Comment: Answer key is written as follows:

                    "Steam dumps will remain closed until header setpoint is reached (1,0)."
                    "Dumps would cycle open ( 5) . "

I To recognize the dumps would cycle open when in the steam 4 pressure mode should be full credit vice the point distribution on the answer key. ] Recommendation: Consider the above when grading.

Reference:

N/A 1 a 1

l * . L* Attachmsnt l'

  • Pege 11 -

l 02/22/88 , i

12. Question 6.21:

Comment: Wording in Technical Specification bases is not the  ; same as the Training text. They mean the same but the T.S. uses DSB vice DNBR.

Recommendation: Accept wording on the answer key or as stated i in the technical specification bases. )

Reference:

Attachment (S13), Unit 1 Technical bases pages B 2-4 and B 2-5. I

13. Question 7.05(b):

Comment: Answer on the answer key is correct. One week before the NRC exams, communications between tha Procedures Coordinator (member of Westinghouse owners group) and the training department resulted in incorrect information being given to the license class on the actions to take when another red path FRP exists. The candidates were initially trained correctly and this was changed on week prior to the exam. This a change was looked upon as a change by the Westinghouse owners group in use of the FRP's. l Recommendation: Accept either of the following answers: i

1. The core cooling red path should be immediately addressed because it is of higher priority than the heat sink Red Path. >
2. Stay in the RED Path FRP on heat sink until completion or the procedure allows you to exit, then i enter the FRP RED Path of the hig'pr priority.

Reference:

Attachment (S14), Executive volume user's guide for  ; Vestinghouse E0Ps. Attached is an attendance sheet verifying l the correct information has subsequently been reviewed with the i candidates to insure the correct response will be performed by all members of the license class. ( 14. Question 7.11: Comment: Answer key does not have all the immediate actions of , AP 4.3.  ! Recommendation: Add: If the reactor has tripped, go to EP-0,

Rx trip or Safety Injection, i 1

l

Reference:

Attachment (S15), AP-4.3.  ! l 1

 )

i I i c i i i l

      +  .       .

Attachmsnt

                                                                                                                          -Pags 12                                           ,

02/22/88

15. Question 7.12:

Comment: Answer key instructs operator to open MOV 2350. MOV 2350 is the Unit 2 cmergency borate valvo. MOV 1350 is the Unit 1 emergency borate valve. ' Answer key lists only 3 of the 4 actions needed to accomplish the step "Initiate Emergency Boration" for FRP S.I. Should also include "Check pressurizer pressura less than 2335 psig " Recommendation: Accept MOV 2350 or MOV 1350 as the emergency borate valve. Include in the answer key "Check pressurizer pressure less than 2335 psig."

Reference:

Attachment (S16), FRP S-1.

16. Question 8.01:

Comment: Most correct answer is (b). There is no relationship at North Anna concerning RHR and LHSI. Technical Specification 3.5.2 states with 1 LHSI pump coc then restore inoperable subsystem to operable status within 72 hours or be in HOT SHUTDOWN within 12 hours. There is no answer to reflect this. 4 Recommendation: Accept (b) as most corree,t answer, the appropriate action statement, or delete question. 1

Reference:

Attachment (S17), Technical Specification 3.5.2.  ! t

17. Question 8.19:

Comment Question referred to "1-0P-1.5," which is a unit 1 , , OP. Answer refers to Unit 2 Technical Specification which has l five bases where unit I has only three. l Recommendation: Accept 3 out of 5 bases asked for, i 4 <

Reference:

Attachment (S18), Unit 1 and Unit 2 Technical Specification bases for minimum temp for criticality.

18. Question 8.24(a):

) { Comment: Technical Specification limits were violated. At 1 x 10 amps tha action statement was entered on one , inoperable PORV. Thus were unable to enter Mode 1 due to provisions of 3.0.4, thus ramp to 75% violated provisions of 1 Technical Specification. Recommendation: Change answer key to "yes" and reason as stated above.

Reference:

Attachment (819), Technical Specification 3.4.3.2. l l i l  ! _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _l

Attachment ' Pags 13 02/22/88

19. Question 8.26:

Comment: Question asked for actions to be taken for an inoperable fire barrier. The question was not specific as to which un it ., Hovover, the answer key required answers as detailed in Unit 2 Technical Specification. Actions required by Unit 1 are more conservative. Recommendation: Since no reference was made to the unit, credit should be given for either Unit 1 or Unit 2 tech spec action statement.

Reference:

Attachment (S20), Technical Specification 7.15 for unit 1 and unit 2. 1 i i i a l 1 i References are attached as appropriate. l 1 1

I *

                               --- NRC NOP.TH ANNA RI. ACTOR OPERATOR EXA.M        --                                     .
                                                                                                                            ,, .d'
          .                  .                                                                            1-SC-2'.2                      ,
            ,                                           FIGURE 1-1                                        Pag 3 1 cf 1 09-27-85
  ..                                                                                                                700 3000 600 2500                       500            [

2000 400 i 2500 1500 300 1200 l 1000 200 l 700 150 2000 f 500 M 12,950-Ci 100 V " D3 I"(12.950-Cf I' B 1500 300 - f

       ,                                              M = mass of liquid 50 inRCS(LBS)                      200         -                          g
  • I 4c
                  "  * " ~                 1000       C      final desired boron               ,

f ="concentration (PPM) 30 100 20 500 50 100 10 10 - BORIC ACID PPM BORON PPM BORON

                '                                                                            VOLUME, GAL ADDITION IN COOLANT (Cf-C)t (Cj)

(VB)

                                                                                                                                      }l BORON ADDITION   correction  (Referfactors to following) TABLE for         [

4 j APPROVED BY: . . Chaiman Station Nuclear Safety ,i

!                                                                           and Operating Comittee                                    i

[ Attachment (RI) Question 1.15 page 1 of 3 1

                                                                                -%      ..A
                                    -- NT.C NORTH A:mA REACTOR OPERATO'l EXA'! --             1.sc.2.6
  • 08-25-76 FIGURE 1 3 Page 1 cf 1 r

NOM 0 GRAPH CORRECTION FACTORS Plant Conditions s Correction Factor Pressure T (AVG) (K) (psig) (* F) Pressurizer Level (See Note) 2235 547-570 Normal Operating 1.00 1600 500 No-Load 1.05 . 't 1200 450 No-Load 1.10 300 400 No-Load 1.16 400 350 No-Load 1.18 400 300 No-Load 1.20 400 300 Solid Water , 1.35

                 .             400                  200                   No-Load                            1.28 Solid Water 400                  200                                                      1.40 400                  100               Solid Water                            1.47          )

NOIT t CORRECTION TACTORS ARE APPLIED.AS FDLLOWS: l (a) Boron Addition and Dilution Total Volum Nomogra;'ha

                              '                                =

l (Corrected) X x V(Nomograph) j (b) Boron Addition and Dilution Rate Nomgranhx h(Corrected)

                                                                 =

f x h (Nonograph) APPROVED BY: bd. 1L CHAfRP A t STATION NUCLEAR SAFETY AND OPERATING COMITTEE 4 I i j J Attachraent (RI) page 2 of 3 l

6-16-87 , i' ! REACTIVITY CONTROL SYSTEMS (]l c BORATED WATER SOURCES - OPERATING $ LIMITING CONDITION FOR OPERATION i 3.1.2.8 Each of the'following borated water sources shall be OPERABLE: [ tl a. A boric acid storage system and associated heat tracing with: t i

1. A contained corated water volume of between 6000 and 16,280 gallons, ,
2. Between 12.950 and 15,750 ppm of boron, and  :
3. A minimum solution temperature of Il5'F.

I

b. The refueling water storage tank with:

i 1 1. A contained borated water volume of be. tween 475,058  : j and 487,000 gallons,  !

2. Between 2300 and 2400 ppm of boron, and  :

i . j i 3. A solution temperature between 40'F and 50'F. ' - ll APPLICABILITY: MODES 1, 2, 3 and 4. - ACTION: j a. With the boric acid storage system inoperable, restore the storage system to OPERABLE status within 72 hours or be in 4 at least HOT STANOBY within the next 6 hours and borated i to a SHUTDOWN MARGIN equivalent to at least 1.77% t.k/k at 200'F; l restore the boric acid storage system to OPERABLE status l within the next 7 days or be in COLD SHUTOOWN within the ' j next 30 hours. I b. With the rufueling water storage tank inoperable, restore

 ]          .                the tank to OPERABLE status within one hour or be in at                        <

least HOT STAND 8Y within the next 6 hours and in COLD SHUT- l DOWN within the following 30 hours.

  • i  ;

l SURVEILLANCE REQUIREMENTS ' i, 1 4.1.2.8 Each borated water source shall be demonstrated OPERABLE:  ! I l NORTH ANNA-UNIT 1 3/4 1-16 Anendment No. 5,16.68,; h Attachment (R1) page 3 of 3 -

I 6 II Control Systems

1. Reactor Control A. Coolant Average Temperature (Program)  ;

(TM-40ST TM-4080, PM-446) Setpoint For* . ]$qppm Full Load l T s $86.8*T ava l l 1. High limit 586.8'T ,

2. Low limit 547'T l
3. Full power temperature 586.8'T i
4. Hot shutdown 547'T
5. Temperature gain 0.398'T/%

power level

6. Lag time constant (TM-4080) 30 seconds (1)
7. Las time to PM-446 should be set t to "0TT" l

l B. Coolant Average Temperature (Measured) h (TM-408B, TM-408C) I

                      ][gg>m              1. Lead time constant                          20 seconds (I)
2. Las time constants 10, I seconds (I) ,

(1) These setpoints may be adjusted during start-up and subsequent operation to optimize control response. I I l l l l i l l l 1 < l l 27 l Attechment (R2) Question 1.17

                                        \
   ,_ ,_a   - . , ,     _ , _ _ _ _ _ ,           _ _ _ _ - .                      .-            .,          , .

8 _ Mt North Anna:

                                                                                              ' %; ' ::]

Units 1 & 2 Inadeauate Core 2;q combination of operating RCPs. Comparison of the measured 5 drop with the normal, single-phase pressure drop provides an '- approximate indication of the relative void fraction, or densth the circulating fluid. Dynamic head decreases approximately linearly as the void fraction of the reactor coolant increases. Increased void fraction is symptomatic of degraded core cooling. The dynamic-head range continuously monitors the relative void fraction of the coolant during forced flow conditions. There are two redundant trains of RVLIS. Refer to figure ICCH.4. Core Exit Temperature Honitoring (CETN) The core exit thermocouples supply temperature inputs to the ICCM, which provides the following indications for core exit temperature monitoring (CETM): o Individual temperature of each core exit thermocouple o For each of the four core quadrants, the following values are calculated and displayed per train, based on the thermocouples in given quadrant: o Haximum temperature of any thermocouple in the quadrant i o Average temperature of all thermocouples in the quadrant o Minimum temperature of any thermocouple in the quadrant o Individual temperature of each of the five highest (hottest) thermocouples in the core, per train l o Average temperature of the five highest thermocouples per train The core exit thermocouples are divided equally between CETH trains A and B.: Twenty-five thermocouples are assigned to train A, and twenty-five to train B. All core exit temperatures displayed are compensated for reference; junction temperature. Attechnent (R3) Question 1.19 page 1 of 2 9 0989b fh

3 North Anna: tinits 1 & 2

   /                                                          Inadeauate Core Coolina Monitor Subcooled Margin Monitor (S W)                                                         h The subcooled margin monitor (SMH) provides the following indications:                    '

o Saturation temperature for the existing RCS pressure f o Temperature margin to saturation based on core exitlergogs - g-The SMH Uses the following inputs to determine saturation temperatu !I calculate the temperature margin to saturation: o RCS loop pressure from wide-range pressure transmitters o Average temperature of the five highest core exit thermocouples The saturation temperature and the temperature margin are calculated separately by SMH trains A and B, using separate, redundant inputs. h (. Definition of Inadequate Core Cooling (Figures ICCH.S and ICCH 6) i' The following is a definition of inadequate core cooling (ICC) n that has given by th6 staff of the Nuclear Regulatory Commission (NRC):

                "The staff considers the core to be in a state of inadequate cor                   -

whenever the two-phase froth level falls below the top of the core and the core heatup is well in excess of conditions that have been predi for calculated small break scenarios for which some uncovery with successful recovery from the accident have been predicted. Possible i indicators of such a condition are core exit superheat temperature a the rate of coolant loss or level drop prior to core uncovery and the extent and duration of uncovery."3 This definition is essentially a description of the phenomenon of ICC Westinghouse has adopted a definition that is more operationally and procedurally oriented. The NRC has agreed that the Hestinghouse definition is more useful for purposes of evaluating instrumentation and implementing Attachment (R3) page 2 of 2 10 0989b run

(2) Cells are arranged in series to produce a total output voltage of 125 VDC. [ (3) Each cell is contained in a scaled, heat

resistant, shock-absorbent, clear plastic jar. .

L l 1 (4) Each en11 has 11 positive and 12 negative t plates. j i  ! s (5) The positive plates hang from a bridge from j the top of the cell. The negative plates are l supported from the bottom.  ! j A microporous ] rubber separator is placed between es.h plate i to prevent any physical contact.  ; i i

c. Battery capacities are rated on an ampere-hour  ;
!                              basis.                                                    ;

4 , (1) an ampere-hour is the ability to deliver a , certain number of amperes for a specific i number of hours before the cell voltage drops ' to a specific minimum value. i i 1 (2) station batteries are rated at 206.25 amps t for an eight-hour period or 1650 amp-hours.

I
d. Battery voltage is monitored as the same voltage  !

displayed for the 125 VDC bus discussed earlier, i f 6 t l e. Design Change DC 85-29-1 replaced Unit 1 batteries z l 1-I.1-Il and 1-III with Exide "2 GN 23" culls.  ; I i l l  ! l . i 5 I Attachment (R4) Question 1.21 ' l 09-23-87/ Revision 1 Page 1.17 ) t

Display Transparency NCRODP-90.3/T-1.1: Vital Power One-Line Diagram. Point out sola transformere These voltage regulating transformers are fed directly from the 480 VAC emergency buses and supply 118 VAC to the vital 120 VAC buses in the event of an inverter failure,

a. Vital buses 1-1 and 1-II can be powered from MCC 1H1-4 through two, parallel,10 kVA transformers,
b. Vital buses 1-III and 1-IV can be powered from HCC IJ1-1 through a single 15 kVA transformer.
c. Because of power requirements only one vital bus per train may be placed on the transformers at a time.
d. The SOLA transformers are located in the Emergency Switchgear Rooms.

There is another transforme. fed directly from the 1H1-4 bus which supplies a semi-vital bus to various radiation process monitoring equipment. 7, 120 VAC Vital Distribution Panels I ' l Display Transparency NCRODP-90.3/T-1.1: Vital Power i One-Line Diagram, j i i i l Attachment (RS) Question 2.01 09-23-87/ Revision 1 Page 1.21 1 l

be described in this module. Operation of the Unit 2 subsystem is identical to that of Unit 1. The piping associated with the CC l

                                                         *                                 ~

System, constructed of carbon steel, is protected by several relief valvos throughout the system. These relief valves are all set to lif t at 150 psig, with the exception of the relief valv'es for the RCP thermal barrier which relieves at 1500 psig. The operation of the major control valves, pumps, and instrumentation is presented in Section III of this module. Major Components - The fol) . 3aragraphs describe the construction and operation of the raa jor -

                                   .nents associated with the CC system. All of the major compon *. are located in the Auxiliary Building.

Figures 51-2, 51 3, and 51-4 illustrate the relationship of the components within the system. Geopenen w olina surte_ tank, Th -

                                                            ?-2nent coolitig water surge tank provides the net positive suction head for the CC pumps. The tank is located approximately 50 feet higher than the pumps suction, ensuring that an adequate head exists at the pu:nps suction to prevent   pump       cavitation. The   surge    tank  allows    for   thstmal expansion and contraction in the system and serves as a source of 1

makeup water to the system. Should a leak develop in the system, l the volume of water in the surge tank allows time for the operator to locate and stop the leak prior to a loss of component cooling, {

       ,        The tank is 10.6 fer. Ugh and 7.5 feet in diameter, constructed of 0.375-inch thick carbon steel. It holds approximately 3120 gallons, while normal operating volume is approximately 2150 gallons. The                      l tank is maintained approximately 62 percent full, allowing sufficient

{ room for expansion and contraction of the CC water. It is vented to I the vent and drain system. Designed for a pressure of 40 psig and a l Page 14 Component Cooling System Attachment (R6) Quest' ton 2.06b page 1 of 2

temperature of 150*F, the surge tank normally operates at atmospheric kp pressure and at a temperature of near 90*F. Makeup water to the tank is provided by the main Condensate system via the bypass valve around LCV-100. The bypass valve is used vice LCV-100 due to water hammer in the makeup piping when LCV-100 opens. The water hammer results from the relatively high discharge pressure of the condensate pumps. When in operation, LCV-100 is controlled by a signal generated by level controller LC-100 which senses changes in surge tank level. Level control is discust.ed in Section III of this module. The makeup water enters the tank through a 2.5-inch nozzle located approximately 7 feet from the , , bottom of the tank (approximately 10.5 feet above the fourth floor of the Auxiliary Building). An 18-inch manhole on the side of the tank allows internal inspection. The tank is also equipped uith a vent line, a recirculation line from the discharge of the CC pumps and heat exchange rs , a surge line to the suction of the CC pumps, and a funnel for adding chemicals to the system. Access to the chemical

 ,                            additional funnel is by a ladder mounted next to the surge tank.

The chemistry of the CC System is maintained by the addition of potassium chromate, potassium dichromate, and potassium hydroxide. These chemicals minimize general corrosion of the CC System components and piping. The CC surge tank is located in a larga cubicle on the north side of the fourth floor of the Auxiliary Building. The surge tank is connected to the suction of both Unit 1 and 2 CC pumps by 4-inch headers. Manual isolation valves are provided for surge tank isolation if required, l Component cooling mamps . The component cooling pumps provide the l motive force for circulating cooling water through the CC heat ' exchangers, individual system loads, and back to the pumps suction. Normally, two pumps (one per reactor unit) supply the required O V v Component Cooling System Page 15 l Attar.hment (R6) psge 2 of 2 l

i-a-m 1

                                                                                                                                                                                                                  viH'd 8]ir

( etc.ies nHSa e r -44.r -- 7e

                                                                                                                                        ,w                                                                      1-et al to vent.cew= tetitn 1 P ' * + 6*-

l utisfn

                                                                                                                                                              **' 88
                                                                                                                                                                               - N , M 2 >L 1_G.)29              3 Cc 8tM
                                                                             >>.s(C W i5ec)J 5,4 .((1 r, 54,. ]

1 6

                                                                             .. . r-c( 4a .*i4)                                                                                    ( # cc y tilept

( pg 4,3 CP(Mic t vos4ac n

                                     '05-          o3
                                                                                                       \

ect see lP Cc '49 }

                                                                                                                                                      't                  'e         g,,,,            f                           - ,

V054** Y < u ..).,$i g 1

                                                                                                                                                                                  .c,     .
  • tCft

( 1'cc-sn ) .., ,

                                                                                                                                                                                     / 
                                        'G5 *                                                                                                                                                                        ,,

[ y-(t o44-i$t 0) ) .

                                                                                       ' S N                                                    I            .

t i a G i14

                                                                    '"                                                                                                                                vos i                                                  scs sas b ,6                                 -QM
                                                                                                               -              J C> - W -;<                                                                                           r (c--do 1 FLeen et Set et                                                                                                 L
                                                                                             /                                                                                         l ,:c3.

c c,,n, P 6 s-ur i M,;s ses { t vr-cc) Ji*eo \ { t-cC 2l 1 gmuy gy

                                                           @~iis7
                                                                ,c.3.sx/ tr '                                                                                                                    vcs saa to uomo was t

0 "'"" "

                                                                              '                                                      vos sac I     i vrc Ju-dj_gL.c_)                                     ,

e ,,,,

                                                                                             'O' " 5 '                                                       1,c,gi ves4acs ' ; "" 5 " >                                f ly,.'" If
                                                                  ..u..,.,                                                                         urisru-essa.u ) >

ecc tr '" I"i**')*"*' 3 Q i 3.cc.1 TK

                                                                                                                 -.?

6 FCC'"' )I

                                                                                                                                       ) r u 4 4.r                  o) i COMPCNENE HF AT EIl
                              . __ ,__. g                                                                                   ,,.,,.,3

( eg." 1  : n ,is , .. w m , > 8 A.1 GEM. SURG (PCNENT TANK CC0t,jNQ "  ? E A ig,y

                                                                                                                                     .a       m$c)                1 y , e,cgi                                                                            )                                     Lu.r.;p ms, a
r. g , .y . ,, [ 3/ .- (t 4 8 -it 0 )
                                                                                                                                                                                   '                     { J74$ ?)4-IseQ
  • l# g,
                                                                                                       ,g,,9 ,

g A" r.9 occ 154a ' (

                                                                                                                                          '~ ?s'Is
                                                                                                                                                                             @ vC14M ptcns r ,wa> y                                                                                                 i ecc.i. J ,         m p i.ce.,,       " H5a O

(.rsi.is

                                                                                                                                  .u 6 :                                 " 1"' /                   nata A*            ren                                                                               /

A.vi ecc y' itst , j o

                                                                                                                    ,, :c .i. 4, .g
                                                         ,                                                               r ts-i9 ,                                                                           7
                                                ^'                        {' o cc a7 )

iwwA 3 7c'. 3 [4

                                                  ' ' D, gg,,,
                                                                                                                  ;           5 r .o.,,       r g ..cc.n j
                                                                                                                                                                            /                                    ,!
                                                                                                                                                                                                                 ?

5I jd(

                                                                                                                                                                                                                                 =
                                                                                   / 'cwo5a                                                                                          g.cc.y             ;

vos sac Ii

                                                              '\t                 i eum )                                     ,

i FG H' >

                                                                                                                                       **                                        D5E?3           1y 0

occ et (1.cc.) P 1A :f b

                                                                           -/

J I G CCMPCNEHfW M QR Pt,)MP CCOUNQ

                                                                                                                                                                                                   $i. ~

p

                                        '"                    ,c,.jM                                                                                                                                                  ~

( e-nos } I w m w oo osi\

                                  ***                                                                                                                                        i
                                 <wsx s

( , .u . ,3 ,

                                                                                           ,                                               Wc. e                   nr

( etc .s )\ 5, g* "  %

                                                                                                                                                                                                                        ~

G rce au u ',. i. # A.y

                                                             "                                       pcc                                                                   'o$ 6x
                                                                                                       ""                                                                    ( g c..      3
                                                                                                                         < ,a eu u..i i ( ew    eu..)w\*    )

Attcchment (g7) uestion 2.06b [

                                                                                                                                                                                , '( J oe /                 nasa g        ,i
                                                                                                                                     < 4
  • e.O 3 y

iCl t$C

                                                                                                                                 , ,s ,.. ,

O ,,, h

            '~  - - , ,                Fc, ;tig c                              ,,.g.,                                                                          .
                                                                                                                                                                                                            <[i u .i >                4

6 50.46 10 CFR Ch, I (1 187 Edi!!on) Nuclear Regulatory Cor period referred to in paragraph of this section may be granted for times the total cladi (a)(2)(ll) of this section for good cause. good cause. Requests for auch exemp* Any such request shall have been sub- before oxidation. As u; tion shall be submitted not less than paragraph total oxidaQ mitted not less than 45 days prior to 45 days prior to the date upon which expiration of the six month period, the plant would otherwise be required total thickness of cladd and shall have been accompanied by to operate in accordance with the pro- would be locally conver affidavits showing precisely why the cedures of said paragraph (a)(2)(lv) of all the oxygen absor!.ec ed with the cladding lo. evaluation is not complete and the this section. Any such request shall be minimum time believed necessary to filed with the Secretary of the Com- verted to stoichiometri oxide. If cladoing rupt1 complete it. The Director of Regula- mission, who shall cause notice of its to occur, the inside s' tion of the Atomic Energy Commission receipt to be published promptly in cladding shall be inclut shall have caused notice of such a re- the FETs ERAL REatsTER such not!Ce quest to be published promptly in the shall provide for the submission of dation, beginnlag 8t time of rupture. Clad FEDERA1. Hectstra; such notice shall comments by interested persons have provided for the submission of within 14 days following FEDERAI, REG. before oxidation means comments by interested persons isTEP puDllCallon. The D! rector of nu- tance from inside to 01 within a time period established by clear Reactor Regula'.lon shall submit ding, af ter any calcul: swelling has occurred the Director of Regulation. If, upon his vias as to any requested exemp-reviewing the foregoing submissions, tion within five days following expira- nt!! cant oxidation. Wh: the Director of Regulation concluded tion of the comment period, ed conditions of transiel that good cause had been shown for (vil) Any request for an exemption temperature lead to a an extension, he may have extended submitted under paragraph (a)(2)(vi) cladding swelling, wit cladding rupture, the o the six month period for the shortest of this section must show, with appro- ding thicknas shall bs additional time which in hLs judgment priate affidavits and technical submis-will be necessary to enable the licensee stons, that it would be in the pubtle in. cladding croLs-sectiona) to furnish the submlssions required by terest to allow the licensee a specified a horizontal plane at 0 paragraph (a)(2)(ll) of this section. Re. additional period of time within which the rupture, if it occur: vallon of the highest c1 quests for extensions of the six month to alter the operation of the f acility in ature if no rupture 0 period submitted under this subpara- the manner required by paragraph occur, divided by the s graph will have been ruled upon by (a)(2)(lv) of this section. The request the Director of Regulation prior to ex. shall also include a discussion of the ference at that elevatte piration of that period, alternatives available for establishing cladding the circumfei (iv) Upon submission of the evalua- compilance with tne rule. include the rupture ope tion required by paragraph (a)(2)(ll) of (3) Construction permits may have (3) Afarimum hydros this section (or under paragraph been tssued after December 28, 1973 The calculated total an (a)(2)(lli), if the six month period is but before December 28, 1974 subject gen generated from the extcnded) the facility shall continue to any applicable conditions or restrie- tion of the cladding or commence operation only within tions imposed pursuant to other regu- steam shall not exceed the limits of both the proposed techn!- lations in this chapter and the Interim hypothetical amount generated if all of ts cal speelfications or license amend. Aceptance Criteria for Emergency cladding cylinders so ments submitted in accordance with Core Coollng Systems published on this paragraph (a)(2) and all technical June 29,1971 (36 FR 12248) s.s amend. fuel, excluding the cla-spect!! cations or license conditions ed (Dec.18,1971, 36 FR 2(082): Pro- Ing the plenum volumi previously imposed by the Atomic ofded, hotterer, that no operating II. (4) Coolable geoms Energy Comtnission, including the re- cense shall be issued for facilltles con

  • changes in core Jeo:

quirements of the Interim Polley structed in accordance with construc- such that the core ret Statement (June 2 k, 1971, 36 FR tion permits issued pursuant to this to coollng. 12248) as amended December 18,1971, paragraph, unless the Commission de- (5) Long term coolin; 36 FR 24082), termines, among other things that the culated successful initi (v) Further restrletions on reactor proposed f acility meets the require- the ECCS, the calcula? operation will be imposed if it is found ments of paragraph (a)(1) of this sec- ature shall be mainto that the evaluations submitted under tion. ceptably low value a paragraphs (a)(2) (!!) and (111) of this (b)(1) Peak claddin g temperatu re, shall be removed for section are not consistent with para- The calculated maximwn fuel element period of time requirr graph (a)(1) of this .ection and as a cladding temperature shall not exceed lived radioactivity rer result such restrictions are required to 2200* F. core, protect the public health and safety. (2) Afartmum cladding oxidation. (c) As u:ed in this s' (vi) Exemptions from the operating The calculated total oxidation of the of coolant accidents (1 requirements of paragraph (a)(2)(lv) cladding shall nowhere exceed 0.17 pothetical accidents ti from the loss of react 476 Attachment (R8) Question 2.0F

l j l l l List the following five des 18n criteria on the board .as you l cover them, and stress the relationship of the listed items to identifying the released material so we can address the 10-CFR-100 limits

a. Peak Clad temperature shall not exceed 2200*F.
b. Maximum Cladding Oxidation at any given point shall not exceed 0.17 (17%) of the total cladding thickness prior to the oxidation.
c. Maximum Hydrogen Generation from chemical reaction, of the clad, shall not oxceed 0.01 (1%)

of the amount generated if all the clad were to be oxidated.

d. A "Coolable Geometry" of the core must be maintained.
e. Long Term Cooling must be maintainable so we can remove the core decay heat.

The meeting of the above five criteria will define the maximum core damage, and so, the radioactive release of fission products to the coolant, and the containment  ; atmosphere during accidents. This data will be used as the i source term for the required calculations to meet the siting criteria of 10-CFR-100. Page 1.8 Engineered Safety Features Attachment (R9) Question 2.08

Start from SDR. Review shipping relays-NCR0DP-90.4/H-2.1.

a. Any engine protective shutdown, energizes the shutdown relay (SDR). A shutdown relay (SDR) contact closes, energizing the emergency stop relay (SE) and (TSE). Any switchgear action causing the lock-out relay (device 87X) contact to close, also energizes the emergency stop relay (SE) and (TSE).

Show how overspeed and generator differential are the only two emer stops besides the Emer. P.B. Stops,

b. The emergency stop relay (TSE) contacts close to energize the stopping relays (5 and SA) and the governor shutdown solenoid (GOV). (moves fuel racks to no fuel position). GOV dumps oil to governor sump.
c. The emergency stop relay (SE) contact open to interrupt the starting control circuits. (See sheet 1).
d. Simultaneous operation of the two (2) emergency stop switches, in the generator control panel, (control room or CRE panel) will energize the shutdown relay (SDR) also. The MCR emergency stop pushbuttons are not effective on "1H" and "2H" EDG if the control room isolation switch is ON. The CRE emergency stop pushbuttons are always effective.

12-03-87/ Revision 3 Page 2.19 Attachment (RIO) Question 2.09 page 1 of 2

1 I Differential lockout reset must be done on the EDG isolation panel for 1H and 211 diesels located in the EDG room (T-2.7). I

7. Alarms and Shutdowns
a. The .following troubles will cause engine shutdown and start lock-out, with the cause annunciated, under any operating mode:

(1) Generator Differential (144 amps between phases) (2) Engine Overspeed NOTE: This is an engine mechanical device, i;tdependent of the governor, that must be reset manually at the engine.

b. The following troubles will cause engine shutdown and start lock-out, with the cause- annunciated, except when there has been an emergency start in wh'ich case there is a trouble annunciation only:

(1) Low Lube Oil Pressure (17 PSIA) (2) Crankcase Pressure (+2") add numbers or manometer together . (3) Lube Oil Temperature High* (230'F) (4) Coolant Temperature High* (205'F) (5) Start Failure (7 Sec, 9 Sec) 12-03-87/ Revision 3 Page 2.24 Attachment (R10) page 2 of 2

a) During the retrieval of a dropped rod, power is l interrupted to the lift coils of all mechanisms in the affected bank, with the exception of the lift coil associated with the dropped rod. This action permits withdrawal of only the dropped rod. d- Two Startup Pushbut. tons are provided for , setting indicators and control circuits in the Rod Control System. l The two buttons are connected in series, so that both must j be depressed to reset the Rod Control System. This ensures l that the system is not inadvertently reset while the reactor is at power. Specifically, the following items are reset: 1 1 1- group step counters, ' 1 2- logic cabinet master cycler, 1 3- slave cycler counters,

                                                                                            )

l 4- bank overlap unit counter, l 5- internal alarm and memory circuits, and

6. pulse-to-analog (P/A) converters in the rod position cabinets.

l l e- An Alarm Raset Pushbutton is also provided for resetting the internal alarms associated with the Rod Control System. l 1- The plant annunciator alarms associated with the Rod Control System are not cleared by this pushbutton.

2. Rod Control System indications. The indications associated with the Rod Control System include the following:

Attachment (R11) Question 2.10

command for reduced stationary coil current is transmitted to the Power Cabinet as long as ths slave cycler is inactive. , Each decoder printed circuit card is designed so that the decoded counts (and thus tha mechanism timing) can easily be changed. A change in timing is accomplished by con-nrcting the cathodes of the diodes in each AND gate set to the true and false counter input linss that will give the desired decodes. For complete procedural details concerning timing changes, refer to section 3 2.3 MASTER CYCLER.

2. 3.1 General Description.

Figure 2-11 shows a block diagram of the fast pulse control, the fast pulse genera-tor, the first pulse control and decoder, the master cycler counter and counter advance, and the master cycler selector. The circuits are on counter printed circuit card A104, master cycler logic printed circuit card A105, master cycler selector printed circuit card A106, and supervisory logic 1 printed circuit card A108. The master cycler performs two basic functions: (1) it selects for movement the group (or groups) in the selected bank (or banks); and (2), it provides fast response when motion is first commanded. The groups in a bank must be selected at equal intervals of 1 time; furthermore, when motion is reversed, the group last moved must be the first group to move in the opposite direction. The latter constraint is necessary to prevent group mis-alignment. In other words, the groups of a bank must always be within one step of each other. During out motion, the groups of a 3-group bank are moved in the sequence 1-2-3-1 3 , and during in motion, the groups are moved in the sequence 3-2-1-3-2-1 . When a change in direction command has been accepted, the first group to move again is the one last  ! moved. The following is a typical example of movement sequences interrupted by direction changes: 1-2-3-1-2 (change direction) 2-1-3-2-1 (change direction) 1-2-3-1, and so on.  ! To satisfy the requirement for equalintervals of time between group selection, four states of a 3-bit binary counter are decoded to produce the slave cycler GO pulses. The counter is reversible and triggers on the trailing edge of a negative clock pulse. When out motion is requested, the direction signal (UP) is ONE, UPMCX clocks are sent to the counter, and it counts up through counts 0 to 5; when in motion is requested, UP is ZERO, DPMCX clocks are sent to the counter, and it counts down through counts 5 to 0. Both clock are inverted replicas of the master cycler clock pulse (PMC) from the fast pulse generator. The PMC clock is an inverted replica of the pulser pulse (PPULSX) except when i fast response is called for after a rod motion command has been accepted at the input buffer. l For fast response, the fast pulse control signal (RPGX) goes to ZERO, enabling the fast pulse generator. The fast pulse generator then produces a sequence of high speed pulses. ~i The high speed pulses have a repetition rate equal to one-half the oscillator pulse (OPULSE) 2-10 Attachment (R12) Question 2.10 page 1.bf 3

rate. When the firstmaster cycler GO pulse is produced, the trailing edge of the compan-(. ion GO not pulse (GOX) resets the FPGX signal to ONE and only the normal rate PMC clocks are left to clock the counter. Without the fast response feature, a two-group-per-bank plant could have up to a 5-second delay (at a group step rate of 6 steps per minute) before motion begins following a motion command. Four states of the counter are decoded to produce the P0X, P2X, P3X and P4X pulse outputs shown in figure 2-11. To satisfy the requirement of equal intervals of time between group GO pulses, regardless of plant configuration, the master cycler selector configura-tion can be altered with jumpers to produce the desired GO pulse pattern. Table 2-2 shows the relationship between the counter states and the group GO pulses. As an example of in-terpretation, suppose a plant has only two groups per bank. For that case, the table shows that the group 1 GO pulse is produced by the P0 decoder and the group 2 GO pulse la produc-ed by the P3 decoder. Note that there is an equal period of time between the two pulses. Table 2-2. Relationship Between Master Cycler Counter States and Group GO Pulses Number of Groups Counter States Per Bank P0 P1 P2 P3 P4 P5 1 X N . D. N. D.

  ~

2 X N . D. X N. D. { 3 X N . D. X X N. D. I Group Group Group 1 2 3 I N . D. = Not Decoded X = GO pulse generated for given group The control bank selection signals (CA, CB, CC, CD) from the bank overlap decoder and the shutdown bank A and B selection signals from the memory buffer (SA, SB) determine which slave cycler (or cyclers) receives a GO pulse when a particular decode occurs. The PO pulse and a P+ pulse are sent to the bank overlap control unit. The P+ pulse signifies i that the last group in a bank has been selected for motion when the motion is out; the P0 pulse signifies that the last group in a bank has been selected for motion when the motion is in. These pulses are required for incrementing or decrementing the reversible bank overlap counter (refer to paragraph 2.4). Note that the true identity of the P+ pulse depends on the plant configuration. Referring to table 2-2, it should be evident that the P+ pulse corresponds to either state P4 or state P3. ( The first pulse control circuit keeps the groups in alignment when a change in direc-tion is commanded. It does this by cancelling the first pulse to the decoder while allowing the counter to count the pulse. For example, in a 3-group bank, if groups 1 and 2 havemoved Attachment (R12) page 2 of 3

out and the counter is at state 4 when in motion is called for, the first pulse control inhibits tho strobe pulse to the decoder so that P4X is not produced. Ifowever, the trailing edge of the clock clocks the counter back to state 3. If P4X were not inhibited, the group 3 slave _ cycler would operate, with the consequence that group 3 would move in one step and then would be separated by 2 steps from groups 1 and 2 The PMC pulse rate varies from 0.6 to 7.2 pulses per second. Since the counter divides by 6, the rate of a specific decode, such as P0, varies from 0.1 to 1.2 pulses per stcond. Thus, the step rate of a bank can vary between 6 and 72 steps per minute. For maintenance purposes, a counter advance circuit is provided so that the counter can be man-ually operated via MASTER CYCLER +1 pushbutton A2S2. The pushbutton has effect only when the FPINHX and UP signals are both ONE. Lamps on card A105 give a visual indica-tion of the set states of the three counter bits (MCQ1, McQ2, and MCQ4, which correspond to 2 , 2 1, 2 ,2 respectively). 2.3.2 Master Cycler Counter _. The master cycler counter consists of three trailing edge trigger flip-flops and as-sociated gates mounted on counter printed circuit, card A104. Since this card is a general-purpose type, it will not be discussed here. Refer to paragraph 2.11 for general discussion of the counter card and specific comments on the master cycler counter application. N 2.3.3 Counter Advance. The counter advance circuit consists of a transistor pulse shaper and a control gate mounted on master cycler logic card A105. The following discussion will be with reference to sheet 3 of the logic flow diagram, figure 4-65. For complete circuit details, refer to the master cycler logic wd schematic, figure 4-48. Whenever MASTER CYCLER +1 pushbutton A3S2 is momentarily pressed, -15 volts is applied to pin 17 of A105. The application of negative voltage drives transistor Q1 to cut-off, with the result that the output of gate Z3D drops to ZERO. When the pushbutton is re-leased, the gate output goes back to ONE. Within the counter card, the output of Z3D (*1MCX) is NAND'ed with UPMCX. Thus, the trailing edge of +1MCX clocks the counter to the next up state if UPMCX is at ONE. If FPINHX is at ZERO, gate Z3D is inhibited and the pushbutton has no effect. 1 2.3.4 Fast Pulse Generator . The fast pulse generator consists of a rising edge trigger flip-flop and some control gates mounted on supervisory logic 1 card A108. The following discussion will be with re-forence to sheet 3 of the logic flo'v diagram, fig,ure 4-65. For complete circuit details, re- _ fer to the supervisory logic 1 card schematic, figure 4-59, 2-12 Attachment (R12) page 3 of 3

e . Presentation A. Design objective of the ESF systems.

1. The central objective of the Engineered Safety Features (ESP) systems is to protect the public by controlling and lie.iting the release of fission products and radiation to the environment to within specifications set by federal regulations,
a. One method used to achieve this is to design the core in conjunction with the Reactor Protective system (RPS) to insure fuel rod integrity. This is done with the core's nuclear and thermal design and the design of the Reactor Protection System, which will trip the reactor and actuate the Safeguards systems,
b. If in spite of the above the Fuel Cladding is damaged, the Reactor Coolant System is design to contain the fission products.  ;
c. If the reactor coolant system is ruptured, releasing the fission products to the containment atmosphere, the Containment building itself will act as the third barrier to the release of the i i

fission products to the environment.  ! Attachment (R13) Question 2.11 page 1 of 2 8 "**** **I ** **

t List the three (3) separate boundaries for fission product release on the board:

a. Fuel Clad
b. Reactor Coolant System
c. Containment Building
2. The release of radioactive materials to the environment during a accident is governed by 10-CFR-100 (Site evaluation factors) which defines the following terms, in terms of dose exposure to the general public:
a. Exclusion Area
b. Low Population Zons i
c. Population Center I

1 l List the three (3) siting terms above on the board and use - them as reference points as you discuss the criteria

                                                                                    ]
a. The Exclusion Area is defined as "an area of sufficient size that an individual located at any point on its boundary for two (2) hours immediately following onset of the postulated accident and its fission product release would not receive a whole body dose in excess of twenty five (25) rem or a dose to the thyroid in excess of three hundred (300) rem". The licensee must have the authority to prevent access or remove Page 1.6 Engineered Safety Features At tachment (R13) page 2 of 2

89 O aims EeO x . q:.. e e e

                                                                                                                    .e
                                               ' 'y'a :,; ( ~":.                                          '

[ s t'iJ'I. e._..<__ . f emum

  • Q i
                                         -. : if..#t g , a      .- .._,+,
                                                                                                                 . . .T, . . t.
                                                                                              ~
                                                    #                                                                                                                                                                                         ~
                        -                                                                                      ~YA'      4
                                       - 'T4M k yy l
                                                                       't,                        '      '
                                                                                                                        'm
                                                                                                                                               .- +                     c) 4 4g                    .

l 5 5- o 9 9"t* DZ ~

                                                                      ,l'i~. ,                                     ^!

e l rl; _ ay - m

                                            .~ n .ty,$,. ! .. e . - ;-
                                                              ._.~

g _ . .

                                                                                                                                                ]
c. . !  !

o

                                                                                                                                                                                                   'T]                       VJ
                                                            .,                                                                                                                                     {
                                                    - [s '                  .

(. m S'l : 3:-

                                                                                                                                                                                                                              "D 1

f

                                                                         ..s.,-               

g . m w.>w'a * ' .:, , , , p ; ., ;

                                                                                                   ' c . ,, .
                        -l i
                                                    . ep-,.ry
                                                        'Y'>.!
                                                                  ,,:eyrg'A,              h .rc;,

j: t::

                                                                                                                  '                                                        puu$s G
                                                - ml,y%d!rd?$5.'('>                                     p                                                          -
                                                                                                                                                                                                                                                    )
                                                      ~
                                                                      .):.34s=x .                                                                                                       .
                                                                         .. ~ < b,        ; , -f. ; y .
                                                             .        .,,~    -

e .ig-

                                                             .i muse u.

Y l l Attachment (R14) Question 2.11 page 1 of 2

i 7e 2. c , SAFETY FUNCTION RELATIONS l TO BARRIERS l - ] Barriers Safety Functions , e Fuel Matrix I Subcriticality l

  • Fuel Clad .

Core Cooling l5 - Inventory l

  • Reactor Coolant Heat Sink  ;

j System Boundary Integrity ~, ! Inventory 3 ! 3 j j e Containment (Containment j e I 5

 \           -

HAIN STEAti SYSTEM SECTION 1: HAIN STEAM Lesson Plan Introduction This lesson plan is designed to familiarize the student with the. construction and operation of that system which provides a flow path for the transfer of the heat energy contained in the steam in the steam generators to the main turbine and other secondary loads. Sections included in brackets ( ) are not testable, but information only. for Section Objectives Upon completion of this section, the trainee will be able to: A. Explain the mechanics of shrink and swell. B. Describe the location, function and control of the major components of the tlain Steam System. Include steam generators, flow limiters, safeties, trip valves, NRVs, bypass valves, decay heat release valve, PORVs. C. Describe the location and function of the main steam instrumentation. D. Describe the operation of the flain Steam System. E. Describe the systems which interf ace with the Main Steam System af fect the Main Steam Syster or are af fected by it. l Attachment (RI$) Question 2.12 page 1 of 4  ! 12-11-87/ Revision 2 Pago 1,2

t l i Boric acid soaks are used at both stations. The boric acid forms boro-silicates which fill the cracks and exclude sludge and scale.

3. The acid intrusion event of the fall of 1984-chemically shocked a large amount of deposits of the steam generator and feedwater piping.

This was a benefit from an accident and not a normal way to clean the steam generators. Subsequent problems include high sulfate levels in the S/Gs. This can be a limiting factor at high power levels.

3. High Point Vents
a. Are located on the main steam piping inside containment and elsewhere on the system.
4. Flow Restrictor
a. This is a venturi located in the vertical run of pipe just before it exits containment,
b. It supplies the required AP for flow measurement.

I 1 l 1 4 1

                                                                                                      )

Attachment (R15) page 2 of 4 , i 12-11-87/ Revision 2 Page 1.8

d. This is not the equivalent of the perforated plate in the steam line which they have at Surry.
5. Safety Valves Display T-1.5 Safety Valve
a. There are five '(5) code safety veas oc each header with a total relieving capacityof 4,275,420 lbm/hr. This is greater than 100% of steam generating capacity.
b. T!.ey Save staggered setpoints: 1085, 1095, 1110, 1120,1135 psig.
c. One stuck open valve will not pass more than 1.02x10' lbm/hr at 1100 psia.
d. To reset a stuck safety, manually lift and reset with operating lever.
6. Atmospheric Steam Dumps or Power Operated Relief Valves (PCV-MS-101A,B,C).
a. One on each steam header, connected to the riser which feeds the safeties.
b. Setpoint is controlled by the operator i manipulating a controller on the main board or the aux shutdown panel.  !

l Attachment (R15) page 3 of 4 12-11-87/ Revision 2 Page 1.9 L________

T l

2. Steam generator -
a. Construction
b. Flow
c. Tube denting
3. High Point Vents
4. Flow Restrictor
a. Located in vertical run of piping on containment
b. Limits blowdown rates of S/G upon MSLB
c. Also used as AP for flow indication ,

i

d. Not the same as at Surry.
5. Safety Valves
a. 5 safeties with total capacity of 4,275,420 lbm/hr
b. Staggered setpoint
6. Atmosphere Steam Dumps or S/G PORVs (PCV-MS-101A,B,C)

I

a. One per S/G header
b. Operator can control the setpoint l

l l Attachment (R15) page 4 of 4 12-11-87/ Revision 2 Page 1.35 i

        ,w*
  ~'
                                                                                                            )

Fourth - tt0V-1860 A&D open, closes fl0V-1862 A&B - (LilSIP RWST Suctlon). I This shift will occur _ automatically if .the following are present: , S1 Recirc tiode signal is ' present, which is from SI (Lock in Relay). Roset using SI Recirc tiode reset buttons on Safeguard Panels A and B. 1 Ensure that the trainees understand that if the SI signal is i reset from the benchboard that the automatic swapover to the i containment sump will STILL OCCUR, which can cause unplanned  ; shif ting during a refueling, and may destroy the LilSt Pnmps. (2) At least one of the respective pumps recirc l isolation ?!OVs have closed. 4 I (3) RWST Lo-Lo Isvol (on 2 of 4 channels at 2 5 . 3*,) .  !

b. The opening of the sump suction fl0Vs 1860 A and B furnish a permissive signal to the normal RWST suction !!OV 1862 A and B close on that pumps.

l

c. The LilSI pumps are provided with minimum flow bypass lines that recirc back to the RVST and l prevent overheating of the pump when operating at shutof f head. Each pump recire line is provided I with two in series !!OVs (t10V-885A & C for SI-P-1A, and !!OV-1885B & D for SI-P-1B) that will a

Attachment (R16) Question 2.14 12-03-87/ Revision 2 Page 2.26 i l i  !

y -- (b) To open

1) Pushbutton to open, must hold in ope.n position until v1v is full open.
2) Orifice isol vivs closed (1200s)

(c)' To close

1) Pushbutton to open
2) Orifice isol v1vs closed (1200s)

(d) Interlock with orifice isol vivs (1200s) prevents shocking the Regen HX and orifices. Also, to keep the Regen and associated piping pressurized to prevent flashing. (e) 460s can be operated from the Control Room or the auxiliary shutdown panel. 460s DO NOT have local / remote switches.

1) Reason: The 460s cannot be operated without the 1200s being closed, and the 1200s have local / remote switches.

(4) Location (a) A loop room, pump cubicle Attachment (R17) Question 3.02 1 _(05-18-87/ Revision 3) Page 1.6 ~ ___ - __- - _ - _ __ _-____- _- _ _ - _ _ - - _ _ _ _ _ _

Show T-2.3 (Functional block diagram of the Automatic Rod control Unit) in your description of the following. D. Auteentic Rod Control Unit - The purpose of the unit is to automatically position the control rods within the core to maintain T,yg constant, for a given reactor power level. The output signal of the automatic control unit is sent via the mode selector switch to the logic cabinet in the Rod Control System, which positions the control bank rods accordingly.

1. The unit consists of two (2) basic error ch==wls, which are used to produce rod speed and rod direction signals ID automatic rod control. The two channels used to generate the error signals for rod speed and direction are:

T e ror - the difference between the hiehest primary coolant a-average temperature LI 1 and a programmed reference AZ average temperature II 1, 1- The average temperature of each reactor coolant loop is determined by averaging Th*" e " * " " "* loops. The three average temperature signals are sent to an auctioneering unit where the hiehest of the three signals is determined, a) The auctioneered high T,yg is sent to a lend / lag unit which partially compensates for the sienal I delay which occurs between the reactor note and the sensing elements, that are immersed into the RTD Bypass lines. l 4 i Attachment (R18) Question 3.04 page 1 of 6 4 _ - - -- i

Ask the trainees what other term the above signal delay is identified by, in the plant. Answer: Loop Transient Time b) The cutput of the lead / lag unit is then filtered , for noise reduction. 2- The reference temperature II 1 is generated from the selectable main turbine first stege cressure (P-446 or 447), which is directly proportional to turbina load. Show transparency T-2.4 (T ,g with respect to turbine load). 3- The difference between actual T,y and T ref is btained in a temperature summing network. The output (temperature error) of the temperature summing network is directed to another summing network, which produces a total error signal, b- Power Nf amatch is the difference between turbine load, selectable main turbine first stare pressure (P 446 or 447), and nuclear power, sensed by the ex core nuclear instrumentation channel N 44 only. 1- The power mismatch circuit provides anticioatory (fast) response to changes in load because it receives an input signal from the ex core nuclear instrumentation (Power Range Channel N 44), and selectable turbine first stage pressure. Attachment (R18) page 2 of 6

t.

' o1 Ask the trainees: "why do we go to the trouble to have a power mismatch circuit", vice using the temperature error circuit to generate the needed rod motion.

Answar: The Power Mismatch unit will generate red motion right away, without waiting for the loop transient time required for the temperature error signal. 2- The deviation and derivative (rate 21 chance) between the two input signals is determined in the power mismatch unit. The output error sienal is grocortional to the rate of change of the difference between the two input signals, a) If the difference between the two signals is constant, ng additional error signal is generated. b) If n'o additional error is generated the signal will decay based on a 40 sec. time constant. Show T-2.5 While describing the Non linear gain, and Variable gain , units. (This information comes from the PLS book page 29) l 1 3- The output signal of the power mismatch unit is passed to a non-linear gain unit, which will vary the marnitude of the outout error sirnal in orocortion to i the amount of the error sirnal oresent.  ! Attachment (R18) page 3 of 6 i _. . . _ _ _ _ _ _ _ . - .___ _ _ - , _ _ - - - - - - -- -- ---

a) A given reactivity addition at a lower power level has a lesser effect on the rate of change of power level than does the same reactivity addition at a higher power level. To illustrate this, assume a giv3n reactivity addition causes a one dscade per minute startup rate. If the reactor is at one percent power initially, power level would be 10_-wm percent after one minute. The rate of change of power is 9 percent per minute. If the reactor had been at 10 parcent power initially, then power level would be 100 percent after one minute, which corresponds to a rate of change of 90 percent per minute, s 4- To compensate for this characteristic, a variable Sain unit is provided which imposes high KalD on the error signals at his power levels and 12E EAID at high power levels. The magnitude of the gain is a function of first stage turbine pressure, not the error signal. a) The gain is a constant 2 : 1 if the unit is <50% power, and drops off (nonlinear) as the unit goes from 50% to 100% load. Show T-2.6 (Control Rod Speed Vs Temperature Error Signal) during the following discussions.

2. The error sienals generated by the power nismatch circuit and the temperature comparison circuits are combined in a summine network to produce a total error signal.

a- This total error signal is used in the rod control program to control rod speed and direction. Attachment (R18) page 4 of 6

i 1- When T,y varies from T,,g by more than 1.5_E, the rod control program sends a signal to the rod control system logic cabinet to begin Isd motion. 2- The speed of the control rods is a function of the difference between T,y and T ref' , a) When the difference is creater than 1.1_E, but less than l_E, the rod speed is fixed at i stees ggI minute (spm). b) Between l_E and 1_E the rod speed linear 1v increases from 8 som to 72 som. c) The rod speed is fixed at 12 agm above a difference of 2_E. o

1) AT avg / Tref DF.VIATION alarm (window 1B A7) ,

will actuate when High Auctioneered T,y differs from T ref by more than 5_F. The alarm requires immediate attention, and could be indicative of: (a) continuous rod motion, (b) large change in steam demand, (c) steam generator level control problem, (d) channel test, or failure. l l l 1 i Attachment (R18) page 5 of 6 i

(RRoDP.93. 5/T- 2. 4, q

                                                      &o Speao                                                     ..

1 I ko06 Cur

72. - -

70 - - (>o - - so- - l

                                              'fo -      -

WdeADE As)b 4 ' l 30- - 1 I I Lc, > Tgey I D' ~ l l 4l I P' O ~~ i 3, 2, i r t gwp, i < 8 4 4 ' v 3 3 8 8 4 aggog,

                                                        -e if'          1       3    4   s                 ;
                                                       -20 m(NC K.lt A Re s e,)                            :

i N Loc curJ - 30 .. ; (Rom) - - l

                                                         . f!O           *
                                                 . -- So
                                                       -60
                                                       - 70
                                                       - 72 b o s ' 14 i

Coureau % spem vs T-ec m ra c e erecoc. l ( d uTo ei ATt ( koo ho eJ 7 00 L) l l i 1 Attachment (R18) page 6 of 6

i+ TABLE 3.3-1 3 2 REACTORTRIPSYSTEMINSTRUMENTATIbN OS 2M E5 MillIMUM TOTAL NO. CHANNELS CilAtlNELS g* FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE APPLICABLE MODES ACTION GE "Q l. Manual Reactor Trip 2 1 2 1, 2 and

  • 12 c~

E 2. Power Range, Neutron Flux 4 2 3

      ~

1, 2 2f ET 3. Power Range, Neutron Flux 4 2 3 High Positive Rate 1, 2 2f 8 4 Power Range, Neutron Flux 4 2 3 1, 2 2# High Negative Rate

    }   5. Intermediate Range, Neutron Flux            2              1          2     1, 2 and
  • 3 Y
    ~
6. Source Range, Neutron Flux A. Startup 2 1 2 2ff 4 B. Shutdown 2 1 2 3*, 4* and 5* 15 C. Shutdown 2 0 1 3, 4 and 5 5 7 Overtemperature AT T Three Loop Operation 3 2 2 1, 2 7f E Two Loop Operation 3 1** 2 1, 2 9 I

n 3 '

                                                                                                                  ?

3 k

h 0\EATEMPEAATURE AT OVERPOWER Af (LE AD/ LAG COMPEh3 AIEO) (LEAD / LAG COMPEr45ATED) gy gy LOOP 1 LOOP 2 LOOP 3  :  : LOOP 1 Loco 2 LOOP 3 Ill I 11 111 1 11 @ I OTHER'

                         $                    $                 ?                                  5               5             ?           g i
                  -g               <
                                     -g                   i
                                                            -g                             i
                                                                                             -g               i
                                                                                                                 -g           i
                                                                                                                                -g O-4 ,@ -4,0-4,                                                            O-4,0- 4,O-4,
                                                                                                                                                    ~*

[ __ gghh A A g_.g g_.4

                                     -,                                                                         1 AEACTOR TRIP                                                              REACTOR TRIP (SHEEI 2)                                                                  (SHEEI 21 OVERTE*PERATUAE of                                                          OVEAPOWER of (LE AD/L AJ COMPENSA1ED)                                                (1.E AD/L AG COMPEr45 A TED) i 1                              1                  !!           111 It E    5                      5               ?                                 5               5             $8
                                                                                                                                        - t401 5                     5                 5                                6               6           6 i
                                                                                                            -i<il,
                                   ,, i,       4,
                                                                                                                                        ,              1 A                                                                     'A                        e 1
                                                                                                                                                       ]

C-3 C4 ' 10 START TUA91NE AUN8ACK BLOCK AU10HAllC t MAP 4UAL A00 WiiHORAWAL (SHEEIS 9 L 15) , LO L7 TAVG ' LOW TAVG HIGH TAVG LOO? I LOOP 2 LOCP 3 LOOP 1 LOOP 2 LOOP 3 LOOP 1 LOOP 2 LOOP 3 11 I I I I I s';s lft ll1 E's f Ifs ll Eft ll1 L L L e Le le 1 e _re _r e _r i At tac htnen t (R20) Question 3.07b l I t 1

                                                                                                                                                                  +

TABLE 3.3-1 (Continued) REACTOR TRIP SYSTEM INTERLOCTS N ALLOWABLE k FUNCTION

rDESIGNATION CONDITION SETPOINT VALUES

> S

                                                                                                                                                        -10 E      P-6                       1 of 2 Intermediate range                             1 x 10~         <3 x 10     Allows manual block of 3                                         g;                             above setpoint (increasing                                                          source range reactor trip g                              power level)
  • ~II ~I 2 of 2 Intermediate range 5 x 10 >3 x 10 Defeats the block of source
  • below setpoint (decreasing range reactor trip g
                                         =                              power level)                                                                                                                         _

E P-10 2 of 4 Power range above set- 10% <11% Allows manual block of power w point (increasing power level) range (low setpoint) and inter-o m mediate range reactor trips and intermediate range rod stop.

  • Blocks source range reactor N trip.

? 2 3 of 4 Power range below set- 8% >7% Defeats the block of power point (decreasing power level) range (low setpoint) and inter-mediate range reactor trips and intermediate range rod stop. Input to P-7. P-7 2 of 4 Power range above set- 10% <11% Allows reacrce trip on: Low > point flow or reactar coolant pump or breakers open in more than one-g 1 ol 2 Turbine Impulse Pressure equiv- <11% Icop, Undervoltage (RCP busses) ! chamber pressure above alent to 10% Underfrequency (RCP busses).. l setpoint rated turbine Turbine Trip, Pressurizer low power pressure, and . Pres.surizer high level. (Power level increasing) [ E b

                                                                                                                                                                                              - T     * *

- 8-25-86 LIMITING SAFETY SYSTEM SETTINGS I BASES 1 The Power Range Negative Rate Trip provides protection for control rod  ! drop accidents. At high power, a rod drop accident could cause local flux peaking which could cause an unconservative local DNBR to exist. The Power l Range Negative Rate Trip will prevent this from occurring by tripping the ' reactor. No credit is taken for operation of the Power Range Negative Rate Trip for those control rod drop accidents for which the ONBR's will be greater than the applicable design limit DNBR value for each fuel type. l Intermediate and Source Range, Nuclear Flux l The Source and Intermediate Range, Nuclear Flux trips provide reactor core protection during shutdown (Modes 3, 4 and 5) when the reactor trip system l breakers are in the closed position. The Source and Intermediate Range trips ' in addition to the Power Range trips provide core protection during reactor startup (Mode 2). Reactor startup is prohibited unless the Source, Intermediate and Power Range trips are operable in accordance with Specification 3 3.1.1. The Source Range Channels will initiate a reactor trip at about 10+5 counts per second unless manually blocked when P-6 becomes active. The Intermediate Range Channels will initiate a reactor trip at a current level proportional to approximately 25 percent of RATED THERMAL POWER unless manually blocked when P-10 becomes active. In the accident analyses, bounding transient results are based on. reactivity excursio= from an initially critical condition, where the source range trip is assemed to be blocked. Accidents initiated from a suberitical condition would pi%ca less severe results since the source range trip would provide core protection at a lower power level. No credit was taken ,.' for operation of the trip associated with the Intermediate Range Channels in the accident analyses; however, their functional capability at the specified trip settings is required by this specification to enhance the overall reliability of the Reactor Protection System. Overtemperature AT The Overtemperature AT trip provides core protection to prevent ONB for all combinations of pressure, power, coolant temperature, and axial power distribution, provided that the transient is slow with respect u piping transient delays from the core to the temperature detectors (about 4 seconds),

  ;nd pressure is within the range between the High and Low Pressure reactor trips. This setpoint includes corrections for changes in density and heat capacity of water with temperature and dynamic compensation for piping delays from the core to the loop temperature detectors. With normel axial power distribution, this reactor trip limit is always below the core safety limit                     I as shown in Figure 2.1-1. If axial peaks are greater than design, as indicated by the difference between top and bottom power range nuclear detectors, the                     ;

reactor trip is automatically reduced according to the notations in Table 2.2-1. l NORTH ANNA - UNIT 1 B 2-4 Amendment No. 84 Attachment (R22) Question 3.17 page 1 of 2

e 11-26-77 3 v LIMITING SAFETY SYSTEM SETTINGS BASES Operation with a reactor coolant loop out of servicci below the 3 loop P-8 set point does not require reactor protection system set point modification because the P-8 set point and associated trip will prevent j DNB during 2 loop operation exclusive of the Overtemperature AT set f point. Two loop operation above the 3 loop P-8 set point is pennis-sible after resetting the Kl K2 and K3 inputs to the Overtemperature AT channels and raising the P-8 set point to its 2 loop value. In this mode of operation, the P-8 interlock and trip functions as a High Neutron Flux trip at the reduced power level. Overpower AT I l The Overpower AT reactor trip provides assurance of fuel integrity, I e.g., no melting, under all possible overpower conditions, limits the required range for Overtemperature aT protection, and provides a backup to the High Neutron Flux trip. No credit was taken for operation of this trip in the accident analyses; however, its functional capability 3 at the specified trip setting is required by this specification to enhance the overall reliability of the Reactor Protection System. Pressurizer Pressure The Pressurizer High and Low Pressure trips are provided to limit l the pressure range in which reactor operation is pennitted. The High l Pressure trip is backed up by the pressurizer code safety valves for RCS overpressure protection, and is therefore set lower than the set pressureforthesevalves(2455psig). The Low Pressure trip provides protection by tripping the reactor in the event of a loss of reactor coolant pressure. T.he low pressure trip is blocked below P-7. Pressurizer Water level The Pressurizer High Water Level trip ensures protection against Reactor Coolant System overpressurization by limiting the water level to a volume sufficient to retain a steam bubble and P vent water relief 1 m NORTH ANNA-UNIT 1 B 2-5 Attachment (R22) page 2 of 2

r

       . N ! . 97 a a ? 210 NUMBER PROCEQURE TITLE                                 REVISION 1.00

(' l-FRP-S.1 RESPollSE TO ilVCLEAR PAGE POWER GEllERATI0ll/ATNS 3 of 6 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT 08TAINE0 (4.] INITIATE DiERCEllCY BORAT10tl 0F RCS: a) Verify at least one a) Start Charging /SI Charging /SI pump - pumps as necessary. RUNNING b) Emergency borate:

1) Place BATP in FAST speed
2) Open tiOV-1350 c) Verify neutron flux - c) Inject the BIT:

RAPIDLY DECREAS111C

1) Open RWST suction isolation valves:
  • ff0V-Ill5B
  • tt0V-1115D
2) Close VCT suction isolation valves:
  • tt0V-lll5C
  • tt0V-1115E
3) Close BIT recire isolation valves:
  • TV-1884A
  • TV-18840
  • TV-1884C
4) Open BIT outlet isolation valves:
                                                                                     * !!OV-1867C
                                                                                     * !!0V-1867D e
5) Open BIT inlet s.1 isolation valves:

Attachment (R23) Question 4.15 page 1 of 2 {iU- _ (STEP 4 CollTIllUED 011 tlEXT PACE) t - . . . . . _ _ . .

r  ;

4. sn en to NUMBER PROCEDURE TITL E REVISION 1.00 RP-S.1 RESP 0!iSE TO NUCLEAR FACE I POWER GENERATIO!!/ATWS 4 of 6
 -     STEP               ACTION / EXPECTED RESPONSE                      RESPONSE NOT OSTAINEO

[4.] INITIATE EMERGENCY B0 RATION OR RCS (CONTINUED): d) Check PRZR pressure - d) Verify PRZR PORVs and LESS TRAN 2335 PSIG block valves open. H NOT, TilEN open PRZR FORVs and block valves as necessary until PRZR pressure less than 2335 psig.

5. CHECK IF THE FOLLOWING TRIPS RAVE OCCURRED:

a) Reactor trip a) Dispatch an operator to locally perform Attachment 2. b) Turbine trip b) Dispatch an operator to locally perform Attachment 1-

6. VERIFY AFW FLOW - GREATER llanually start pumps and align TRAN 680 GPM valves as necessary.
7. VERIFY ALL DILUTION PATilS TSVLATED:

a) Place blender contrcl to - 0FF b) Close FCV-Ill4A b) Locally close 1-CH-217.

8. CHECK FOR REACTIVITY Perform the following:

INSERTION FROM UNCONTROLLED RCS C00LDOWN: a) Stop any uncontrolled RCS temperatures - cooldown. DECREASING IN AN UNCONTROLLED !!ANNER b) GO TO Step H. O.,,R, ANY SG pressure - ~ ' - DECREASING IN AN UNCONTROLLED $1ANHCR Attachment (R23) page 2 cf 2 ' L

/ 8-25-86

                                                                                                  'l
                                                                                               ~

p0WER DISTRIBUTION LIMITS , Jl BASES l 3/4.2.2 and 3/4.2.3 HEAT FLUX AND NUCLEAR ENTHALPY HOT CHANNEL FACTORS-F0 (Z) and F H ' The limits on heat flux and nuclear enthalpy hot channel factors ensure that 1) the design limits on peak local power density and minimum ' DNBR are not exceeded and 2) in the event of a LOCA the peak feel clad temperature will not exceed the 2200'F ECCS acceptance criteria limit. Each of these hot channel factors are measurable but will nonnally only be detennined periodically as specified in Specifications 4.2.2 and 4.2.3. This periodic surveillance is sufficient to insure that the hot channel factor limits are maintained provided:

a. Control rod in a single group move together 6f th no individual rod insertion diffe:'ing by more than + 12 steps from the group demand position.
         .        b. Control rod groups are sequenced with overlapping groups as           s described in Specification 3.1.3.6.                                         :
c. The control rod insertion limits of Specifications 3.1.3.5 and 3.1.3.6 are maintained.
d. The axial power distribution, expressed in terms of AXIAL FLUX DIFFERENCE, is maintained within the limits.

The relaxation in F U as a function of THERMAL POWER allows changes in the radial power shaphH for all pennissible rod insertion limits. F ' will be maintained within its limits provided conditions a thru d abod, are maintained. , When an F measurement is taken, both experimental error and man-ufacturing tolkrance must be allowed for. 5% is the appropriate allowance , for a full core map taken with the incore detector flux mapping system and 3% is the appropriate allowance for manufacturing tolerance. The Specified limit for F N operation will result in a mesNred Fcontginsa.4%errorallowance. Normal The.4% allowance is based on.the follow 1.ng considerations N = 1.49 NORTH ANNA - UNIT 1 B 3/4 2-4 Amendment No. J4,C4 Attachment (R24) Question 4.17b 1

r . e 9-8-86 3/s,1 staCT '!!TY CONTD0L SYSTE"5 , J SASES - 3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT (MTC) (Continued) conditions other than those explicitly stated will require extrapolation to those conditions in order to permit an accurate comparison. The most negative MTC value equivalent to the most positive moderator density coefficient (MDC), was obtained by incrementally correcting the MOC used in the FSA". analyses to nominal operating conditions. These corrections involved sub-tracting the incremental change in the MOC associated with a core condition of all rods inserted (most positive MDC) to an all rods withdrawn condition and, a

   . o     conversion for the rate of change of moderator density with temperature at RATE THERMAL POWER conditions. Th limiting MTC value -4.4 x 10 js value ak/k/'F. of the MOC The  MTC  was thenoftransformed value    -3.3 x 10 -4 into ak/k/*F De represents a conservative value (with corrections for burnup and soluble boren) at a core condition of 300 ppm equilibrium boron concentration and is obtained by making these corrections to the limiting MTC value -4.4 x 10-4 ak/k/'F.

Once the equilibrium boron concentration falls below about 60 ppm, dilution operations take an extended amount of tim 6 and reliable MTC measurements become more difficult to obtain due to the potential for fluctuating core conditions over the test interval. For this reason, MTC measurements may be suspended provided

          < 60 ppmthe       measured is less        MTC negative   value than -4.0at xan10-equ{11brium full power boron concentration delta k This value and the limiting MTC value of -4.4 x 10-{k/'F.          deltaThe    difference k/k/'F           between/

conservatively a bounds the maximum credible change in MTC between the 60 ppm equilibrium boron concentration (all rods withdrawn, RATED THERMAL POWER conditions) and the licensed end of-cycle, including the effect of rods, boron concentration, burnup, and end-of-cycle coastdown. The surveillance requirements for measurement of the MTC at the beginning and near the end of each fuel cycle are adequate to confirm that the MTC remains within its limits since this coefficient changes slowly due principally to the reduction in RCS boron concentration associated with fuel burnup.  : 3/4.1.1.5 MINIMUM TEMPERATURE FOR CRITICALITY This specification ensures that the reactor will not be made critical with { the Reactor Coolant System average temperature less than 541*F. This limitation i is required to ensure 1) the moderator temperature coefficient is within its analyzed temperature range, 2) the protective instrumentation is within its normal operating range, and 3) the P-12 interlock is above its setpoint. 3/4.1.2 BORATION SYSTEMS The boron injection sy: tem ensures that negative reactivity control is available during each mode of facility operation. The components required to perform this function include 1) borated water sources, 2) charging pumps,

3) separate flow paths, 4) boric acid transfer pumps, 5) associated heat tracing systems, and 6) an emergency power supply from OPERABLE diesel generators.
                                                                                                                      -l NORTH ANNA . UNIT I                         B 3/4 1-2                Amendment No. 85 Attachment (R25)          Question 4.18 page 1 of 2 l

\ _ __ _

?

                                                                                                 }

l 9-8 3/4.1 REACTIVITY CONTROL SYSTDiS l J BASES -! l 3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT (MTC) The limitations on MTC are provided to ensure that the value of this .  ! coefficient remains within the limiting conditions assumed for this parameter  ! in the FSAR accident and transient analyses. 3 The MTC values of this specification are applicable to a specific set of  ! plant conditions; accordingly, verification of MTC values at conditions other  ! than those explicitly stated will require extrapolation to those conditions in order to permit an accurate comparison. The most negative MTC value equivalent to the most positive moderator density coefficient (MDC), was obtained by incrementally correcting the.MDC used in the FSAR analyses to nominal operating conditions. These' corrections involved subtracting the incremental change in the MDC associated with a core condition of all rods inserted (most positive MDC) to an all rods withdrawn condition and, a conversion for the rate of change of moderator density with temperature at RATED THERMAL POWER conditions. This value of the MDC was then transformed into the limiting MTC value -4.4 x'10 delta k/k/'T. The MTC value of -3.3 x 10 delta k/k/'F represents a conservative value (with corrections for brnup and soluble boron) at a core condition of 300 ppa equilibrium boron concentration and is obtained by making these corrections to 3 the limiting MTC value -4.4 x 10 delta k/k/*F. ' Once the equilibrium boron concentration falls below about 60 ppa, dilution operations take an extended amoun: of time and reliable MTC measurements become more difficult to obtain due to the potential for fluctuating core conditionc over the test int e rval . >For this reason, MTC measurements may be suspended provided the measured MTC value at an equil x 10'gbrium deltafull power baron concentration 560 ppa is less negative than - 4.0 k/k/*F The difference between this value and the limiting MTC value of '4.4 x 10'4 delta k/k/*F conservatively bounds the maximum credible change in MTC between the 60 ppa equilibrium boron concentration (all rods withdrawn, RATED THERMAL POWER conditions) and the licensed end of cycle,

   '   including the effect of rods, boron concentration, burnup, and end-of-cycle coastdown.

The surveillance requirements for measurement of the MTC at the beginning and near the end of each fuel cycle are adequate to confirm that the MTC remains within its limits since this coef ficient changes slowly dt.e principal-ly to the reduction in RCS boron concentration associated with fuei.burnup. 3/4.1.1.5 MINIMUM TEMPERATURE FOR CRITICALITY This specification ensures that the reactor will not be made critical with the Reactor Coolant System average temperature less than 541'T . This limitation is required to ensure 1) the moderstor temperature coefficient is , within its analyzed temperature range. 2) the protective instrumentation is within its normal operating range. 3) the P-12 interlock is above its set- . point, 4) the pressurizer is capable of being in an OPERABLE status with a ' steam bubble, and 5) the reactor pressure vessel is above its minimum RT temperature. NM NORTH ANNA - UNIT 2 5 3/4 1-2 Amandaant No. 72 , Attachment (R23) page 2 of 2 -

  • PERIODIC TEST CRITIQUE
 . \,
  • NORTH ANNA POWER STATION VIRGINIA POWER {" ~y 7
                                                                                                                                             -7 1  li
     'Pariodic Test No:                                               1          To be Performed By:                         2 Unit No:         3 k's;            1-PT-23                                                            OPERATOR                                           1 Test

Title:

. 4 QUADRANT POWER TILT RATIO Test Frequency: 5 AT LEAST ONCE PER 7 DAYS OR SPECIAL (WHEN THE ALARM IS INOPERABLE) I! nit Conditions Requiring Test: 6 MOCE 1 ABOVE 50% OF RATED THERMAL POWER Test Ierformed By: 7 Date Started: 8A Date Completed: 8B Test Results (To be completed by performer of test and Cognizant 9 Supervisor (s)): '

1. / / Satisfactory / / Unsatisfactory / / Partial Procedure
2. The following problem (s) was encountered (use back of sheet for additional space):

l

3. Corrective action taken or initiated: .

i i v

4. Work Order No.: Dated:

I Forward To Cognizant Supervisor Test Reviewed and Approved By Cognizant Supervisor (s) or Designee: 10 Date: REACTOR ENGINEER Date: Comments: _ ,cntilitVLLtd IM lLio w.--

                                                                                                                         %td i
                                                                                                                  .,p +4 Forward To Performance Engineer              _.,

Comment (s) of Performance Engineer: 11 Sta \"" 12 poi qp;;ggSARL( ggtS10tl Attachmnnt (RI) &naceinn M.nA

       -___-_-              _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _                                                                                  l

r , 1-PT-23

   ,                                                                                                     Page 1 of 4
      .'.                                                                                                01-08-87' VIRGINIA POWER PERIODIC TEST PROCEDURE FOR NORTl! ANNA POWER STATION UNIT NO.:                                       1 TITLE: QUADRANT POWER TILT RATIO

REFERENCES:

1. T.S. 3.2.4,.4.2.4.1.a, b, 3.3.3.2, 4.3.3.2, 3.3.1.1
2. 1-0P-57, Incore Movable Detector System
3. P250 Operator's Console Reference Manual, TP044-P
4. Calculational basis for PT-23, Approved 03-13-86 i

REVISION RECORD: APPROVED REV. NO. PAGE(S) DATE (CHAIRMAN, SNS&OC) L 14 ENTIRE 01-08-87  ; i l l l O ( , s[',/~N i[ f,_

                                                                                                                     ]

RECOMMEND APPROVAL: APPROVED BY: CHAIRMAN STATION NUCLEAR SAFETY AND OPERATING COMMITTEE . 1 i d  :;.TE : 01-08-87 SUPERINTENDENT TECHNICAL SERVICES l 1

T- . 1-PT-23 Pege 2 of 4

                                                     .-                                                                                                                                        01-08-87
                    . Initials

('! l.0 Purpose 1.1 To monitor the core quadrant power tilt ratio. 2.0 Initial Conditions ' 2.1 All excore detectors are operable. If one excore detector jpqpm= is inoperable, perform 1-PT-23.1 or 1-PT-21.1 concurrently, i i 2.2 ' Plant is at a stable electrical load and at a power level of >  ; 50% of Rated Thermal Power. 2.3 Notify the Shift Supervisor on duty of the impending test. 3.0 Precautions and Limitations 3.1 This test must be run at least once per 12 hours during steady i state operation when the alarm is inoperable.

,                                                                                                                                   3.2    If one Power Range Channel is inoperable and Thermal Power is greater than 75%, this test must be run once per 12 hours                   l 1

j ]lllP* concurrently with 1-PT-23.1 or 1-PT-21.1. l l . 1 i 4.0 Instructions 1 NOTE 1: If plant process computer is operable, complete Section , a 4.1. If plant process computer is inoperable, N/A and j , initial Section 4.1 and complete Section 4.2.  ; l 1 Jgggs. NOTE _2: If an excore detector is inoperable, a valid computer calculated QPTR can be generated by removing the i inoperable detector computer points from scan and l entering a zero into those points. j 4.1 Computer Calculated QPTR  ; l NOTE: The computer QPTR report will be printed on utility { ) t printer (MWOS) following Step 4.1.4.  ! j 4.1.1 Push Demand Log. I l , 4.1.2 Enter 1 into Value 1. 1

4.1.3 Enter 3 into Value 3

f . 1-PT-23 Page 3 of 4

  • 01-08-87 Initials i 4.0 Instructions (cont) 4.1.4 Push Start / Add.

4.1.5 Remove the QPTR report from the printer, 4.1.6 Verify the QPTR report currents with the operable excore ggp, detector meters. If report currents and meters agree within i 3 p amps, sign-off the "Current Verified By" section of the QPTR report. If report-currents and meters do not agree within 13 p amps, abort this method,  ! N/A and initial the remaining steps in Section 4.1 and i proceed with Section 4.2. 4.1.7 Verify the expected 100% currents (which are posted on the core status board) with QPTR 100% currents. If they  ; agree sign-off the QPTR report for expected 100% currents. If they_do not agree, abort this method, N/A and initial the remaining steps in Section 4.1 and proceed with Section 4.2. 4.1.8 If any error messages are printed on the QPTR report, abort this method, N/A and faitial the remaining steps in Section 4.1 and proceed wtth Section 4.2. 4.1.9 Attach the QPTR report to this procedure and sign the "Completed By" Section of Attachmect 6.1, page 2 of 2. __, 4.1.10 N/A and initial Section 4.2 and any inapplicable Sections of Attachment 6.1. 4.2 Manually calculated QPTR 4.2.1 From the core status board, record the value for 100% power for each excore detector (expected reading for 100% power) on the attached data sheet. 4.2.2 Record the excore detector readings and Rx Power on the attached data sheet. t__ 1

                                                                             ~

f+ , 1-PT-23 Pcge 4 of 4 01-08-87

      - s.

3 jnitials 4.0 Instructions (cont) NOTE: Data from any inoperable excore detector should not

                      ]gggpm                      be included in QPTR calculations since its erroneous readings will cause an error in the calculated QPTR.

4.2.3 Calculate the maximum quadrant power tilt ratio as per the attached data sheet. 'l 4.2.4 Complete an independent verification of calculations (to be performed by someone not previously involved in this test). 4.2.5 Notify the Reactor Engineer or the on-duty STA that the computer calculated QPTR is not functional. 4.3 If the conditions stated in step 3.2 exist, obtain the quadrant power tilt ratio using the incore movable detector system.

   \"-
                         ]lllN'      Utilize 1-PT-23.1 or 1-PT-21.1 to obtain a flux map.

4.4 Notify the Shift Supervisor on duty that this test has been  ! completed.

4.5 If quadrant power tilt ratio exceeds 1.015, notify the Reactor l

i Engineer. i 5.0 Acceptance Criteria i CAUTION: If the below acceptance criteria cannot be satisfied, refer to ACTION statement of T.S. 3.2.4. t 5.1 The quadrant tilt ratios are less than or equal to 1.02. 2 6.0 Attachment 6.1 Data Sheet

T .

                                                                                             ~1-PT-23
                                                                                        . Athe.chmsnt 6.1 Page 1 of 2 01-08 87 U = Upper L = Lower II        Sum of Normalized Upper Detector Readings II g g== Sum of Normalized Lower Detector Readings Maximum Ig = Highest Normalized Detector Reading Upper Maximum It = Highest Normalized Detector Reading Lower.

DATA SilEET 1 9 EXCORE DETECTOR READINGS EXPECTED EXCORE DETECTOR READINGS (REC 0FD ALL READIN0 TO 3, PLACES) AT 100% POWER (DATA SilEET POSTED ON VERTICAL BOARD) (RECORD EXACTLY AS POSTED) UPPEI LOWER UPPER LOWER N41U - 15 'l N N41L - _/ 6 6. Q N41U ~

                                                                                        *b                 ~
                                                                                                                    'b 100                       N'I'"100 N42U-ONv.e                       N42L - "sNu e                N42U      -

2 52.'7 N42L igo - 2 3 (, ,7 100 N43U - 13 9,5 N43L - 14 6.1 N43U - 2 6 2. Ci N43L - 270.0 100 100 144U - l47,l N44L - 160 1 N44U ~ 75 ' N - 52,3 100 100 Normalize the detector readings by dividing by the Expected Excore reading at 100% power (CARRY OUT TO FOUR DECIMAL PLACES. (EX. 0.9931)) N41U =1K97 = N41L = I 6 6,0 = N41U 2%.4 ,599O N41L *C S 100 100 D 3, G N42U = A/ A = N42L = A) A = N42U N42L 100 100 d'# N43U = l 3 ci ,5 = N43L = I 4 6, f = N43U 100 2 M ,9 . N43L 100 0 0,0 6M N44U = 10.1 = N44L = 150,3 = N44U g y,3 100 N44L 100 262J '5 C II u=1.'7OS'l IIg = !. 7 2 57 b

                   '                                                     1-PT-23
  • Attechm:nt 6.1 Pcgo 2 ef 2 01-08-87

( s. (CARRY ALL CALCULATIONS TO FOUR DECIt1AL PLACES) AERAGE I U* U = l, 7 08 ) = , 6 6 O '1

                         # DETECTORS IN USE           3 AVERAGE I =             II t          =   f ,7 739 = , S' %3
                        # DETECTORS IN USE 3

UPPER TILT RATIO = ?!AXIt!UF1 I y , , gggg_ AVERAGE I g ,g4qg LOWER TILT RATIO = FIAXIt!Uti I tg ,gcjgg , 3 AVERAGE I t

                                                ,5%3 QUADRANT POWER TILT RATIO =         l,os'2.

(Larger of the upper and lower tilt ratio rounded to three decimal places. (EX - I.006)) C011PLETED BY: DATE: tit 1E: Rx POWER:  ! l INDEPENDENT REVIEWER: (of calculations) l i

f RFE1EN E :O' P. - 0 CONTROL ROOM USAGE OF CRITICAL SAFETY FUNCTION STATUS TREES (continued) Tha six Critical Saf ety Function Status Trees are listed below and are always cyclusted in sequence. F-0.1 SUBCRITICALITY (S) F-0.2 CORE COOLING (C) F-0.3 HEAT SINK (H)

  • F-0.4 for Revision 0.00 F-0.4 INTEGRITY (P)
  • F-0.3 for Revision 0.00 F-0.5 CONTAINMENT (Z)

F-0.6 INVENTORY (I) If identical priorities are found on different trees during monitoring, the rcquired action priority is determined utilizing the following sequence. The user begins monitoring with the SUBCRITICALITY tree. Entry is at the arrow et the left-hand side of the tree. Questions are answered based on plant conditions at that time, and the appropriate branch line is f ollowed to the n;xt question. An individual Status Tree evaluation is complete when the user arrives at the coded terminus. With the exceptions noted below, the color cnd instructions of the terminus are noted and the user continues to the next tree in sequence, again entering at the left-hand arrow. If any RED terminus is encountered, the user is to direct the operator to immediately stop any procedure in progress, and to perform the Function Rostoration Procedure required by the terminus.

      'If during~ the performance of any RED-condition Function Restoration Procedare, c RED condition (terminus) of higher' priority arises, then the higher
  • priority c ndition should be addressed first, and the lower priority RED-condition
       , procedure suspended.

If any ORANGE terminus is encountered, the user is expected to monitor all of the remaining trees, and then, if no RED is encountered or no HIGHER priority ORANGE is encountered, then direct the operator to immediately stop any procedure in progress, and to perform the Function Restoration Procedure required by the terminus. If during the perf ormance of an ORANGE-condition Function Restoration Procedure, any RED condition (terminus) or higher ORANGE condition (terminus) arises, then the RfD condition or higher priority ORANGE condition is to be eddressed first, and the original ORANGE-condition procedure suspended. Once a Function Restoration Procedure is entered due to a RED or ORANGE condition, then that procedure is tv be perf ormed to its completten URLESS preempted by some higher priority condition. It is expected that the cetions in the Function Restoration Procedure will clear the RED or ORANGE condition bef ore all of the operator actions are completed. HOWEVER, the Function Restoration Procedure should be perf or=ed to the point of the defined transition to a specific procedure or to the "procedure and step in effect" endpoint. ) Critical Safety Function Status Tree monitoring should be continuous as long as any ORANGE or RED condition is present. If no condition more serious than YELLOW is encountered, then nonitoring frequency may be reduced to 10-20 minutes, unless some significant change in plant status occurs. Attac,hment (S14) Question 7.05(b) page 1 of 2

f ___ ., NORTH ANNA POWER STATION LECTURE ATTENDANCE RECORD prossa.: R O /S/2081-1 bewe efass Instructor Guide

Title:

AJ4- Number: d)A Subject / Lesson Plans:C oA3-v o ( Ecom LCS AS/ O dv^i h6*t_. SA MOM Dates ////B/E3 Durations / -"5 b Lecturer: f/ S~I / ATTENDEES: Name (Last , First , M. I . ) Signature Employer / Dept./SSN

1. tNJW '

kri L YW-w% N. 0 [tLifff~lV1'l['E(U$ 2.M( , %o h'- CN *ks U,18c//* Arl4 5H-/

s. Cif05)emiJ GiwiS n',%iiboNIw!"t' l!"/M !6P l .?n.@ Ml9 s..'isaiow ' & 1a L <J ku . O Tub UA Wlnoa (w5 NMc[
                                                                    \        .

l

           $. b,\ke_t      ' li . l 's \ t n-   'Y                   I?$
                                                           *I I                A_         \ '/\ l' U A rI * {'s //

c' i V LJ ? D () {

                                                                                                                      /
6. . . ca< < . ',~ A  ;, s *'. .s  ;.,,  % ~

Yi Vo'Y I. h 0-lY, l In f~C l . r !C/0 S !/0 V* */Y ' '?(o(e 3

s. 00]< a E'rgiev L Ytd[ ,i.u j/ooll<nv <w-na
9. Shel 4CM y L j' -

t)/)$a c/'s t t i t, 9y./gr r 1,, a . ,,1 ,o y ., n ., ,.

11. < < b h., 1 soa t'k'AD&u~- i','lIl*/rtWw-w-rwr~ '
12. Allas NcL ,( ll . T~~/T(1NE_ UA AI/T, a l 2-42-OM90} l
u. komBccev J. Nde' LMLc./oos/ $366VOV/ i 14.% E<, AU x R T h80 .

t/dbi4/<//e/42-;bec l

15. fMS'?' lLuis l2 h n. YAfv*- ^$ $]l
  • l M l )
16. 31r'ar /IldfA [ $[ < M(([c f/llh:[/)'l bo W(: 9'd'
17. v.>c., xW . / . ./-
                                                                                                                                   .s . m 2
18. f4/v/Ert $ . <fD4 L W. / W V'* fMV E & L l Mfn %'~6770r
19. Ih' 9 // f~? / , U i IN I' ' $ 'Yd/ N eJN f '

IAt' ? t * ' ' ' f '. fr 2 ?$ t. 20, b.d L DU 'C' M dr /' '- /bA's / i"~s.n / / 7J 1 Y/c 4 Y4' (Continued on back) Attachment (S14) tsage 2 of ? oc

1-AP-4.3 Pag 2 3 of 10. 10-23-86

 -             4.0    Immediate Operator Actions 4.1    IF,the F   Reactor has tripped, THEN go to 1-EP-0, REACTOR TRIP OR SAFETY INJECTION.

4.2 E N-44 has failed, place rods in "Manual" AND feedwater bypass FCV's to "Hanual". 4.3 Suspend power increases AND rod withdrawal. - Completed By: Date: I 1 Attachraent (SIS) Question 7.11 i L

      .                                                                             8-21-80

\ ' i EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - T,yg GREATER THAN 350*F j LIMITING CONDITION FOR OPERATION p

3. 5. 2 Two independent ECCS subsystems shall be OPERABLE with each subsystem comprised of:

I

a. One OPERABLE centrifugal charging pump, I
b. One OPERA 8LE low head safety injection pump',
c. An OPERABLE flow path capable of transferring fluid to the Reactor Coolant System when taking suction from the refueling water storage tank on a safety injection signal or from the containment sump when suction is transferred during the recirculation phase of operation.  ;

APPLICABILITY: MODES 1, 2 and 3. ACTION:

4. With one ECCS subsystem inoperable, restore the inoperable subsystem i to OPERABLE status within 72 hours or be in HOT SHUT 00WN within the i next 12 hours.

i

b. In the event the ECCS is actuated and injects water into the Reactor l Coolant System, a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 90 days describ-ing the circumstances of the actuation and the total accumlated actuation cycles to date. The current value of the usage factor  ;

for each affected safety injection nozzle shall be provided in this Special Report wnenever its value exceeds 0.70. i t

c. The provisions of Specification 3.0.4 are not applicable to Specifi-  !

cations 3.5.2.a and 3.5.2.b for one hour following heatup above 340*F or prior to cooldown below 340*F. i l l SURVEILLANCE REQUIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:

a. At least once per 12 hours by verifying that the following valves are in the indicated positions with power to the valve operators removed: ,

NORTH ANNA - UNIT 2 3/4 5-3 i Attachraent (S17) Question 8.01 L

7

      . 4 o                                                                                 d-21-80 REACTOR COOLANT SYSTEM RELIEF VALVES t!MITING CCN0! TION FOR CPERATION                           '

3.4.3.2 sna!! be OPEAASLI.Two power relief valves (PORVs) and their associated 31 4PPLICA8 tLITY: M00t3 1, 2, and 3. ACT!CN: a. With ones or sore P0AV(s) inocerable, within 1 nour either restore the PORV valv=(s)(an)d to CPERA4LE removestatuspower or close the associated from the blockblock valve at ' east witain NOT $ TAN the following 08Y 30 hours. within the next 6 hours and in COLD b. With one or more block valve (s) ino9 era 41e, within 1 hour either - restore(s) valve theand block valve (spower)from remove to 08tRAALEthe status or close block valvethe (s);bloc o

at least within NOT $7AMotY the following 30 hours. within the next 6 hours and in COL
                             $URVE!LLANCE Rf00!REMENTS 4.4.3.2.1 Each PORV shall be coecnstratec CP!RA4Lf:

a. At least TEST, once per exclucing 31operation, valve days by perforsance anc of a CHANNEL FLNCTIONA b. At least once per 18 eenths by performance of a CHANNEL CALIBL 4.4.3.2.2 . 92 days by operating the valve trougn one c:molete cyc . Attachment (S19) Question 8.24a NORTH AMMA

  • UNIT 2 3/4 4 74 1

m____- -- -

                                                                                                   ]

/. , 4-1-78 2 s l i t PLANT SYSTEMS - 3/4.7.15 PENETRATION FIRE BARRIERS i LIMITING CON 0!TIONS FOR OPERATION i 3.7.15 All penetration fire barriers protecting safety related areas i shall be functional. ' APPLICA81LITY: At all times. ACTION: -

a. With one or more of the above required penetration fire barriers non-functional, establish a continuous fire watch on at least one side of the affected penetration within 1 hour. i
b. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIRENENTS 2 1 4.7.15 Each of the above required penetration fire barriers shall be ' verified to be functional by a visual inspection: J

a. At least once per 18 months, and -
b. Prior to declaring a penetration fire barrier functional following repairs or maintenance.  !

1 1 NORTH ANNA - UNIT 1 3/4 7 84 Amendment No. 3 Attachment (S20) Ouestion 8.26 page 1 of 2 _ ..]

                                                                                                            -1 6'                                                                                                     '

C *

-1-85' i

PLANT SYSTEliS 3/4.7.15 PEHETRATION FIRE BARRIERS LIMITING CON 0!TIONS FOR OPERATION 3.7.15 All fire barrier penetrations (including cable penetration barriers, . firedoors and fire dampers), in fire zone boundaries, protecting safety relat,ed areas shall be functional. APPLICABILITY: At all times. ACTION: *

a. With one or more of the above required fire barrier penetrations non-functional, within one hour, either establish a continuous fire watch on at least one side of the affected penetration, or verify
          "                  the OPERABILITY of. fire detectors on at least one side of the non-functional fire barrier and establish an hourly fire watch
           .                patrol. Restore the non-functional fire barrier penetration (s) to functional status within 7 days or prepare and submit a Special                I      l Report to the Comission pursuant to Specification 6.9.2 within                        l the next 30 days outlining the action taken, the cause of the non-                -

i functional penetration and plans and schedule for restoring the

          ,                 fire barrier penetration (s) to functional status,
b. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVE!LLANCE REQUIREMENTS l 4.7.15 Each of the above required penetration fire barriers shall be verified to be functional:

a. At least once per 18 months, by a visual inspection, ar.d ' Y '-
b. Prior to declaring a penetration fire barrier functional following repairs or maintenance by a visual inspection of the affected penetration fire barrier (s).

NORTH ANfM - UNIT 2 3/4 7-70 Mendment No. 47 Attachment (S'.0) page 2 of 2 L- M _-

y . I ENCLOSURE 4 SIMULATION FACILITY FIDELITY REPORT Facility Licensee: Virginia Electric and Power Company Facility Licensee Docket No.: 50-338 and 50-339 Facility Licensee No.: hPF-4 and NPF-7 Operating Tests administered at: North Anna Power Station Operating Tests Given On: February 17-25, 1988 During the conduct of the simulator portion of the operating tests identified above, the following apparent performarce and/or human factors discrepancies were observed:

1. The boration model does not model in real time. The plant is very slow to i react to boration, i 2. Spurious starts of charging pumps and opening of the BIT inlet.
3. The following spurious alarms were experienced,
a. Turbine supervisory panel
b. Radiation monitors
c. Fire panel
d. Containment pressure
4. The procedures file cabinets did not always contain all of the procedures required by the candidates during the scenarios, i

I l l I i k_}}