ML20128D543

From kanterella
Revision as of 19:47, 8 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That 850306 Rev 3 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Plan Should Be Modified to Accommodate Encl Comments,Per 850613 Discussion.Encl Withheld (Ref 10CFR73.21)
ML20128D543
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/01/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Williams J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8507050136
Download: ML20128D543 (3)


Text

. .

JUL 011985 Florida Power and Light Company ATTN: Mr. J. W. Williams, Jr.

Group Vice President Nuclear Energy Department P.O. Box 14000 Juno Beach, Florida 33408 Gentlemen:

SUBJECT:

DOCKET NOS.: 50-250 AND 50-251 This acknowledges the receipt of your letter of March 6,1985, which transmitted Revision' 3 to the Turkey Point Guard Training and Qualification Plan.

Our review of the changes had found most of them to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are. acceptable for inclusion into the plan. However, as indicated in the Enclosure, certain other changes require minor administrative clarificaiton and one change is not consistent with the provisions of 10 CFR 50.54(p). On June 13, 1985, Mr. J. Ennis of Region II discussed our concerns with Mr. R. Garrett of FP&L.

Please revert to the commitments in your previously approved plan or, if desired, modify your plan to accommodate the enclosed comments and resubmit corrected plan pages as necessary to maintain plan continuity. Should you want to pursue those changes deemed inconsistent, you must submit a request to the Commission, Office of Nuclear Reactor Regulation, under the provisions of 10 CFR 50.90 for amendment to your license.

The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, Roger D. Walker, Director Division of Reactor Projects

Enclosure:

Inconsistent Changes cc w/ encl: (See page 2) h0 pgg7oloaBi89o h +

F

i l

Florida Power and Light Company 2 JUL 01198(i cc w/ encl:

Mr. C. M. Wethy, Vice President Turkey Point Nuclear Plant P.O. Box 029100 Miami, Florida 33102 Mr. C. J. Baker, Plant Manager Turkey Point Nuclear Plant P. O. Box 029100 Miami, Florida 33102 Mr. Harold F. Reis, Esq.

Lowenstein, Newman, Reis and Axelrad 1025 Connecticut Avenue, N.W, Suite 1214 Washington, D. C. 20036 Mr. Norman A. Coll, Esq.

Steel, Hector and Davis S. E. First National Bank Bldg.

100 S. Biscayne Blvd,14th Floor Miami, Florida 33131

'U. S. Environmental Protection Agency Region IV Regional Radiation Representative 345 Courtland Street, N.W.

Atlanta,~ Georgia 30308 Attorney General Department of Legal Affairs The Capitol Building Tallahassee, Florida 32304 Mr. Ulray Clark, Administrator Radiological Health Services Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power. Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 cc w/ encl: (continue on page 3)

I

Florida Power and Light Company 3 JUL 011985 cc w/ encl:

State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Mr. M. R..Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Coordination and Review Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Mr. Martin H. Hodder, Esq.

1131 N.E. 86th Street Miami, Florida 33130 bec w/ encl:

Chief, Safeguards Power Reactor Licensing Branch, NMSS, 881-SS Chief, Standardization and Special Projects Branch, NRR, 340-P Region II Licensing File (50-250, 251),

TAB 2 bec w/o encl:

Document Control Desk (RG01), 42-P NRC Resident Inspector State of Florida RII RII RII O

7

'/

i nis:es W DR re K.RBarr JPS hr h

SA ELEc o VLB ownlee

_ 15/p[/85 G OIbhh g/p[/gg $85 gjggjgs 64b/85 bjgfj g5 6/g/85