ML20248B648
| ML20248B648 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/28/1989 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20248B654 | List: |
| References | |
| NUDOCS 8908090287 | |
| Download: ML20248B648 (2) | |
See also: IR 05000250/1989030
Text
_
1"
SAFEGUARDS INFORMATION -
-
JUL 2 81989 -
Docket Nos.- 50-250, 50-251
UIEGUARDS Inrong,7,g
Florida Power and Light Company
ATTN: Mr. C. O. Woody, Acting
Senior Vice President - Nuclear
P. 0..' Box 14000
Juno Beach, FL 33408-0420
Gentlemen:
SUBJECT: NRC. INSPECTION REPORT NOS. 50-250/89-30 AND 50-251/89-30
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
-Ms. Orysia M. Mas nyk on June 14-16, 1989. The inspection included a review of
activities authorized for your Turkey Point facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report. . Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure. Therefore, the enclosure
te this letter with the exception of the report cover page, which presents a
nonexempt suminary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNED BY
WILLIAM E. CLIN:
p0.PhilipStohr, Director
Division of Radiation Safety
k
and Safeguards
Enclosure:
NRC Inspection Report
(Safeguards Information)
f
cc w/ encl:
(See page 2)
dg
a %n ,
.
U
T'Urcbs30,pg
i
,
,,m~.--,,_
,
7
SAFEGUARDS INFORMATION
~~
8908090287 890728
ADOCK 05000250
________l___________-__.____FD_C___
_ _ _
_ _ _
_
.
j
,-_-
l
!
!
. . .
Florida Power and Lig p.
@RDS ligFORMATION
~
JUI. 2 81989
i
CC W/ encl:
K. N. Harris,'Vice President
Turkey Point Nuclear Plant
J. E. Cross, Plant Manager
Turkey Point Nuclear Plant
L. W. Bladow, Plant QA Superintentient
K. W. Van Dyne, Regulatory and C6ftipliance
i
Supervisor
'
cc w/ Inspection Summary:
State of Florida
bec w/ encl:
NRR/DRIS/SB
bcc w/ Inspection Summary:
Document Control Desk-(RIDS IE04), 016
G. E. Edison, Project Manager, Project
Directorate 11-2, Division of Reactor
Projects,NRR
NRC Resident Inspector
RII
RI
R
RII
'
T
,C ,~ ',' f f
M nyk:tj
jtDMcGuire
J lenjak
WCline
074//89
07/ /89
l
/fl/89
/ 07(if89
m
y
.n.,
1
. . +; , s . n..-, ~ ,-,
SAFEGU ARDS INFORMATION
__