Forwards Insp Repts 50-250/91-33 & 50-251/91-33 on 910819-23.No Violations Noted
ML20138F941
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/03/1991
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML20138F946 List:
References
NUDOCS 9610180122
Download: ML20138F941 (3)


See also: IR 05000250/1991033

Text

{{#Wiki_filter:. . September 3, 1991 ~ Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41 Florida Power and Light Company - ATTN: Mr. J. H. Goldberg President - Nuclear Division P. O. Box 14000 Juno Beach, FL, 33408-0420 Gentlemen: SUBJECT: INSPECTION REPORT NOS. 50-250/91-33 AND 50-251/91-33 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by L. Mellen on August 19 through August 23, 1991. The inspection included a review of activities authorized for your . Turkey Point facility. At the conclusion of the inspection, the j findings were discussed with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel and observation of activities in progress. Within the scope of this inspection, no violations or deviations were identified. In accordance with Section 2.790 of the.NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room. Should you have any questions concerning this letter, please contact us. Sincerely, . (0RIGINAL SIGNED BY T. A. PEEBLES) Thomas A. Peebles, Chief

operations Branch j Division of Reactor Safety i j ')(D Enclosure: NRC Inspection Report cc w/ encl - (See page 2) t ' 9610180122 910903 d. g[[(, DR ADOCK 0500 0 '

. . l Florida Power and Light 2 September 3, 1991 Company , cc w/ encl: ~ K. N. Harris, Sr. Vice President

Nuclear Operations P. O. Box 14000 Juno Beach, FL 33408 , R. E. Grazio, Director Nuclear Licensing , Florida Power and Light Co.

P. O. Box 14000 ' Juno Beach, FL 33408-0420 T. F. Plunkett, Vice President Turkey Point Nuclear Plant P. O. Box 029100 Miami, FL 33102 L. W. Pearce, Plant Manager Turkey Point Nuclear Plant , P. O. Box 029100

i Miami, FL 33102 L. W. Bladow Quality Manager Turkey Point Nuclear Plant- P. O. Box 029100 Miami, FL 33102 D. Powell, Superintendent - Plant Licensing Turkey Point Nuclear Plant P. O. Box 029100 Miami, FL 33102 Harold F. Reis, Esq. Newman and Holtzinger, P.C. 1615 L Street, NW Washington, D. C. 20036 . John T. Butler, Esq. Steel, Hector and Davis 4000 Southeast Financial Center Miami, FL 33131-2398 Attorney General 'Jepartment of Legal Aff airs The Capitol Tallahassee, FL 32304 cc w/ encl cont'd - (See page 3) 1 i

- .- -- . .- - _ . . . - _ - - . - _ _ .. .. . . - . - . . . Florida Power and Light 3 September 3, 1991 Company (cc w/ encl cont'd) ~ Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahssee, FL 32399-0700 i Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Lesgislature 111 West Madison Ave., Room 812 Tallahassee, FL 32399-1400 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 Gordon Guthrie, Director Emergency Management Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 bec w/ enc 1: R. Auluck, NRR \\,,B tic u m e n t C o n t r o l D e s k K. Landis, RII Ross Butcher, Sr. Resident Inspector . U.S. Nuclear Regulatory Commission P. O. Box 1448 Homestead, FL 33090 I:DRb R