ML20248J042

From kanterella
Jump to navigation Jump to search
Forwards Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted
ML20248J042
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/29/1989
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML20248J045 List:
References
NUDOCS 8910130016
Download: ML20248J042 (3)


See also: IR 05000250/1989042

Text

__ - _ _ _ _ -

- __ _

,

,

'

.

'3 .y.

.

. SAFEGUARDS INFORMATION q

SEP 2 91989

Docket Nos.. 50-250,.50-251

License'Nos. DPR-31, DPR-41 i

SAFEGuppgS INFORMATION REMOVE

L Florida Power and Light Company -

' ATTN: Mr. C. O. Woody, Acting

' Senior Vice President - Nuclear-

P. O. Box 14000'

Juno Beach, FL 33408-0420

Gentlemen:

-SUBJECT: NRC INSPECTION REPORT NOS. 50-250/89-42 AND 50-251/89-42

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

A. Tillman on August 28 - September'1, 1989. The inspection included a review

of activities authorized for your Turkey Point facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

-identified in the enclosed Inspection Report.

Areas examined during the' inspection are identified in the report. Within

these areas .the inspection consisted of selective examinations of procedures .

and representative records, interviews with personnel, and observation of

activities in progress.

Within the' scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure. Therefore,.the enclosure

~

' to this letter with the exception of the report cover page, which presents a

nonexempt sumary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

WILUAM E. CUNE

f' J. Philip Stohr, Director

k Division of Radiation Safety

and Safeguards

Enclosure:

'NRC Inspection Report

(Safeguards Information)

cc w/ enc 1: (See page 2)

e

ournswk;

.

we, .s% ,j

SAFEGUARDS INFORMATION OM"a,s,;?s*ecca=nerw

- _ _ -.

.

.,

. .- SAFEGUARDS INFORMATION

.

, Florida Power and Light Company 2 SEP 2 31989

cc w/ enc 1:

K.11. Harris, Vice President

Turkey Point Nuclear Plant

P. O. Box 029100

Miami, FL 33102

J. E. Cross, Piant Manager

Turkey Point Nuclear Plant

P. O. Box 029100

Miami, FL 33102

L. W. Bladow

Plant QA Superintendent

Turkey Point Nuclear Plant

P. O. Box 029100

Miami, FL 33102

E. Lyons, Acting Regulatory and

Compliance Supervisor

Turkey Point Nuclear Plant i

P. O. Box 029100

Miami, FL 33102

cc w/ Inspection Summary:

Harold F. Reis, Esq.

Newman and Holtzinger, P.C.

1615 L Street, NW

Washington, D. C. 20036

John T. Butler, Esq.

Steel. Hector and Davis

4000 Southeast Financial Center

Miami, FL 33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee, FL 332304

Jacob Daniel Nash

' Office of Radiation Control

Department of Health and

Rehabilitative Services

1317 Winewood Boulevard

Tallahssee, FL 32399-0700

Jack Shreve

Office of the Public Counsel

l Room 4, Holland Building

Tallahassee, FL 32304

(cc w/ Inspection Summary cont'd - See page 3) oxumnt eansmmed weah

,no.nuensw uneesa

  • * ^ , } /s, p .3 /T j ' 7 , * F *7 y I- r90rma!M Wh0h VMraie-) from

f,;*f,tT,-! ; '; ! ' } , ., Mn n, inn, cocument is decentroud.

ft

'

v M (F DIS {J . d i '

(

- - _ _ _ - _ - _

_ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ - - - _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . - _ - . _ _ - _ _ - _ _ . _

p.[ . .'.. I . SAFEGUARDS INFORMATION

'

IFlorida Power and Light Company- '3 SEP 2 b 1989

(cc w/ Inspection Summary cont'd)

' Administrator

Department-of-Environmental Regulation

Power Plant Siting Section

>

State 'of Florida -

. Twin Towers

2600 Blair Stone Road

Tallahassee, FL. 32301

.

Joaquin Avino

' County Manager of Metropolitan

Dade County. .

..

111 NW 1st Street, 29th Floor-

Miami,~ FL 33128

Intergovernmental. Coordination

and Review

Office of Planning and Budget

Executive Office of the Governor'

The Capitol' Building

Tallahassee -FL 32301

~

,

State of Florida-

!

bec'w/ enc 1:

NRR/DRIS/SB

bec w/ Inspection Summary:

Document Control Desk (RIDS IE04), 016-

G.~E. Edison, Project Manager, Project

Directorate II-2,. Division of Reactor

'.

Projects,'NRR

NRC Resident Inspector

t

l

L

l

l

1

/

'

I RII R RII DRSS RII: <

RIIOp. s  ;

- *C'

ATif1iKan:ser JEnTiis DM

0

09/2/ /89 609/J//89 09/2//89 09/B /8 0 89

  • T,"ly C L,Jf l

E - --_________SAFEGU ARDS INFORMATION

_ _ . _ _ _

ttrmat:on. When separated from

  • * At <hennwnt is rfer mtWled .]

i