ML20136C421

From kanterella
Jump to navigation Jump to search
Fifteenth Partial Response to FOIA Request for Records. App Y Records Encl & Available in PDR
ML20136C421
Person / Time
Site: Saint Lucie, Byron, Surry, North Anna, Turkey Point, Crystal River, Ginna  Constellation icon.png
Issue date: 03/06/1997
From: Pugh N
NRC OFFICE OF ADMINISTRATION (ADM)
To: Binder N
DEBEVOISE & PLIMPTON
Shared Package
ML17229A261 List: ... further results
References
FOIA-96-485 NUDOCS 9703120081
Download: ML20136C421 (7)


Text

,,.

U S. NUCLEAR REGULATORY COMMISSION NRC FOlA REQUEST NUMBERIS) gg w %L)

FOIA 485 y

RESRONSE T yPE RESPONSE TO FREEDOM OF lnNAL lX l PAmiAt (15th)

INFORMATION ACT (FOIA) REQUEST o^ "

g MAR 0 61997 e...e DOCKE T NUMBE RIS) W apohcable)

RE QUE ST E R Neil S. Binder PART 1.-AGENCY RECORDS RELEASED OR NOT LOCATED (See checAedboxes/

i No agency records subject to the request have been located No additional agency records sub es.t tu the request have been located i

g Requested records are available through another pubhc distribution program. See Comments section.

Agency record'. subject to the request that are identified in Appendix (es) are already available for pubhc inspection and copying at the 3

NRC Public Dccument Room,2120 L Street, N W, Washington, DC.

E Agency records subject to the request that are Hentified in Appendu(es)

Y are being made avadable for pubhc mspection and copying it the NRC Pubhc Document Room,2120 L Street, N.W., Washington, DC, in a folder under this FOI A number The n sproprietary version of the proposa.(s) that you agreed to accept in a telephone conversation with a member of my staff is now being made available j

u for public inspection and copying at the N RC Public Document Room,2120 L Street, N W, Washington, DC, in a folder under this FOI A number Agency records subject to the rrquest that are identified in Appendex(es) may be inspected and copied at the N RC Local Pubhc Document Room identified in the Comments section.

E Enclosed is information on how you may obtam access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, El N.W., Washington, DC.

Agency records subject to the request are enclosed (Appendix Y)

Records subject to the request have been referred to another Federal agencyhes) for review and direct response to you g

Feen You will be billed by the NRC for fees totahng $

I 1

You wih receive a refund from the NRC in the amourit of $

in view of N RC's response to this request, no further action is being taken on appeal letter dated

.No j

i PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records es being withheld from pubhc disclosure pursuant to the enemptions described in and for the reasons stated ifs in Part II, B, C, and D. Any released portions of the documents for which only part of the record is beirig withheld are bemg made available for public E

inspection and copying in the NRC Pubhc Document Room 2120 L Stieet, N W, Washington, DC m a tokjer under this FOI A number.

E OMMENTS K

r I

(A i

Y E

y+c 5R E cTOR. D(iblO OF F R O OFINFOR All% AND PUB L ICA t lONS SE R VICE S 5

o tuR-r _ Y r=

n A

nn,1 l

~-

m.,m

- a,.

,y Nx5 N h M h hh h,._. h, h h. h h h $

. hb h

s

"'M k#n WRdke + W.p h

4 j

9703120081 970306 PDR FOIA

  1. #, "2 <-
g' g g m ?GD, w '.

gg $pp{.

@ W MN@$, w.d hmi i

j t

BINDER 96-485 PDR us 4g; m

N ji) i j

c

%&vmW u h

4 g@ w @m wwm&eh

.,.,__.,_JMg%@sMM@@# Mw$$$w#n8 w

x ?

ii wie

@M9,MS fs cen a m m.a nan

a s -.

-a.

,a2

-n, a -. - = -

-s..-

-na Re: FOIA 96 485 f

J

- APPENDIX Y RECORDS BEING. RELEASED IN THEIR ENTIRETY fE.

DAIf DESCRIPTION /(PAGE COUNT)

I 1.

1/1/93 Regulatory Information Tracking System (15 pages) 2.

~7/8/93 Facsimile Transmittal to K Landis from St. Lucie r

(3 pages)

3.

10/13/93-Plant Information Book. Saint Lucie 1. Volume I - Emergency Response (199 pages) 4.

10/13/93.

Plant Information Book Saint Lucie 2. Volume 1 - Emergency Response (172 pages)

?

5.

1/1/94 St. Lucie Units ) and 2. SALP Input Feeder Form (46 pages) 6.

6/94 Plant Status Report (38 pages) 7.

9/19/94 Memorandum to G Lainas from 8. Boger.

Subject:

Request for Assistance in Addressing Issues Regarding St Lucie Units 1 and 2 Refueling Procedures (20 pages) 8'.'

10/94 Plant Status Repor t (40 pages) 9.

10/19/94-Recent Significant Events / Findings (5 pages)

]

~

.10.

1/5/95 Recent Significant Events / Findings (7 pages) 11.

2/5-9/95~

Inspection Plant (97 pages) 12.

8/4/95 DRP One-Liners (13 pages) 13.

8/28/95 Memorandum to J Azolinski from E Merschoff.

Subject:

Request for Assistance in Addressing Issues Regarding St. Lucie Emergency Diesel Generator Fuel Oil Transfer System Leak Isolation and Using Operator Action in Place of Automatic Action (39 pages) 14.

9/13/95-Integrated Plant Performance Review (48 pages) 15,

'10/10/95 Memorandum for E Merschoff from K Landis.

Subject:

Plant Performance Review (PPR) - Reactor Projects Branch 2 (20 pages)

S6.

12/4/95 Preliminary Inspection Results (2 pages) 17.

12/19/95 Preliminary Inspection Results (1 page) i

j 2

18.

12/20/95 Fax to Landis~from St. Lucie (2 pages) 19.

12/22/95 Memorandum to E Merschoff et al., from K Landis

Subject:

Systematic Assessment of Licensee Performance (SALP)

Recuest for Functional Area Outline - St. Lucie Unit I anc 2 (49 pages)-

20.

1/18/96 St. Lucie Systematic Assessment of Licensee Performance (SALP) 1/2/94-1/6/96 (431 pages) 21.

2/14/96 St. Lucie Report 96-01 (5 pages) 22.

2/15/96 William Russell Visit to St. Lucie Nuclear Plant (118 pages) 23.

2/15/96 James Taylor Visit to St. Lucie Nuclear Plant (118 pages) 24.

2/22/96 Regional Administrator Quarterly Press Conference at St. Lucie (365 pages) 25.

2/22/96 St. Lucie Nuclear Plant. 1/2/94-1/6/96. Systematic Assessment of Licensee Performance (SALP) (178 pages) 26.

2/26/96 Inspector Input. Inspection 3/4-8/96 (5 pages) 27..

4/10/96 Note to K Landis. M Miller from R Long,

Subject:

EA 96-127: St. Lucie PIG Inoperability (1 page) 28.

4/11/96 Memorandum to E Merschoff et al., from K Landis,

Subject:

St. Lucie Unit 1 Refueling Outage (4 pages) 29.

5/5/96 MIDLOOP/ Reduced Inventory Checklist (1 page) 30.

5/24/96 Inspector Input. Inspection 5/6-10/96 (5 pages) 31.

6/18/96 St. Lucie Unit 1 MIDLOOP/ Reduced Inventory Activities (I page) 32.

7/1/96 Memorandum for 0 DeMiranda from K Landis

Subject:

RII-95-A-0065 - Concerns Regarding Management Communication and Configuration Control (8 pages) 33.

7/5/96 St. Lucie Inspection Report. 6/15-24/96 (9 pages) 34, 7/16/96 St. Lucie Inspection Input. Inspection 5/13-28/96 (5 pages) 35.

7/18/96 St. Lucie Report Input. Rev.1. Inspection 6/17-28/96 (1 page) 36.

7/18/96 Input to Inspect, ion Report 96-11 (3 pages)

a 3

37.

7/19/96 Memorandum to J Johnson from K Landis.

Subject:

Readiness to Restart Following a Refueling Outage - St. Lucie Unit 1 (3 pages) 58.

8/6/96 Memorandum for 0 DeMiranda from K Landis

Subject:

RII A-0056 - Personnel Executed a Switching Order and Manipulated Equipment Without Knowledge of Control Room Personnel (5 pages) 39.

8/15/96 Weekly Branch Chief Status Report (1 page) 40.

8/17/96 Memorandum for 0 DeMiranda from K Landis.

Subject:

RII A-0120 - Alleged Safety Problems Due to Down-Sizing (4 pages) 41.

8/22/96 Weekly Branch Chief Status Report (1 page) 42.

8/23/96 St. Lucie Operbtional Period September through August

23. 1996 (11 pages) 43.

8/29/96 St. Lucie Nuclear Plant. Corrective Action Plan Meeting (263 pages) 44.

8/30/96 Weekly Branch Chief Status Report (1 page) 45.

9/5/96 Weekly Branch Chief Status Report (1 page) 46.

9/12/96 Weekly Branch Chief Status Report (1 page) 47.

9/14/96 Memorandum for W McNulty et al.. from K Landis.

Subject:

RII-96-A-0124 - Failure to Adhere to all Administrative Steps in Closure Process of St. Lucie Action Requests (STARS) when Licensee Rushed their Corrective Action Program Change (4 pages) 48.

9/14/96 Memorandum for 0 DeMiranda from K Landis,

Subject:

RII-96-A-0129 - A Maintenance Manager was Unprofessional and Violated the Freeze Seal Procedure and a New VIP Does Not Consider ALARA Concern Because of his Stringent Housekeeping Practice (4 pages) 49, 9/20/96 Weekly Branch Chief Status Report (1 page) 50.

9/26/96 Weekly Branch Chief Status Report (1 page) 51.

10/3/96 Weekly Branch Chief Status Report (1 page) 52.

10/8/96 Memorandum to J Johnson from S Ebneter.

Subject:

St.

Lucie Self-Assessment (34 pages) 53, 10/10/96 Weekly Branch Chief Status Report (1 page)

4 4

54.

10/17/96 Waekly Branch Chief Status Report (2 pages) 55.

10/24/96 Weekly Branch Chief Status Report (1 page) 56.

'10/24/96 E-Mail from M Miller to X Landis..

Subject:

Answers to RA Questions on St. Lucie Self Assessment (4 pages) 57.

10/24/96 E-Mail from M Miller to K Landis,

Subject:

Large Break LOCA Conference Call (4 pages) 58.

10/24/96 E-Mail from M Miller to C Rapp

Subject:

Seimens (4 pages) 59.

10/28/96 E-Mail from M Miller to K Landis.

Subject:

St. Lucie IR 96-15 (29 pages) 60.

10/28/96 E-Mail from M Miller to R Hannah.

Subject:

News Sumnary for October 25 - Reply (1 page) 61.

-10/28/96 E-Mail from M Miller to K Landis.

Subject:

St. Lucie Calendar Update (7 pages) 62.

10/28/96 E-Mail from M Miller to K Landis.

Subject:

St. Lucie NI EAW (1 page) d I

63.

11/1/96 E-Mail from L Wiens to K Landis. Subje~ct: Commissioner's

)

Briefing Paper (1 page) 64.

8/10/93 Memorandum for C. Potts from C. Stoiber.

Subject:

Pr oposed Nuclear Power Plant Site Visit for Prime Minister j

h Chernomyrdin (12 pages) 65.

10/31/96 E-Mail from M Miller to C Julian.

Subject:

Welcome to St. Lucie (7 pages) 66.

10/31/96 Weekly Branch Chief Status Report (1 page) 67.

10/31/96 E-Mail from M Miller to F Gillespie.

Subject:

MC 9900 Guidance in Error (1 page) 68.

10/31/96 E-Mail from M Miller to C Julian.

Subject:

Criticality L

Monitoring Letter (1 page) l 69.

11/7/96 Weekly Branch Chief Status Report (1 page)

]

70 11/13/96 E-Mail from M Miller to C Julian.

Subject:

Updated St.

Lucie Schedule FYI (7 pages) 71.

11/14/96 Weekly Branch Chief Status Report (1 page) 72.

11/14/96 E-Mail from M Miller to C Julian.

Subject:

Responses to Stew's Request on St. Lucie Self-Assessment (9 pages) i

,a d

5 73.

11/14/96 Memorandum to R Zimmerman from E Merschoff.

Subject:

Inconsistencies Between NRC Positions in Response to TIA 95-013 and NRC Inspection Manual Chapter. Part 9900 Interim Guidance on 10 CFR 50.59 Issued in f

April 1996 (13 pages)

{

74.

11/15/96 E-Mail from M Miller to C Julian.

Subject:

St Lucie Speakout Stuff (1 page) l 75.

11/19/96 E-Mail from M Mioller to S Sandin.

Subject:

Information Notice on Operator Activities Affecting Reactivity (2 pages) 76.

11/15/96 E-Mail from M Miller to CERG.

Subject:

CE Regulator's

]

Group (1 page) 77.

11/16/96 E-Mail from M Miller to L Keller_(1 page) j 78.-

11/18/96 E-Mail from M Miller to 0 DeMiranda.

Subject:

EOF

]

Dose Assessor (3 pages) 79.

11/18/96 E-Mail from M Miller to A Tripp.

Subject:

Here It Is (10 pages) 80.

11/18/96 E-Mail from M Miller to C Casto.

Subject:

St. Lucie j

NI Inspection (10 pages) 81.

12/21/95 Memorandum to T Martin et al., from M Hodges.

Subject:

IPE Senior Review Board January Meeting Agenda (2 pages) 82.

11/19/96 E-Mail from M Miller to L Wiens.

Subject:

Sheron's St.

t Lucie Visit (1 page) 83.

11/22/96 Weekly Branch Chief Status Report (1 page) 84.

11/27/96 Weekly Branch Chief Status Report (1 page) 85.

12/2-4/96 Executive Overview of St. Lucie (3 pages) i j

86.

1/9/97 MIPS - Master Inspection Planning System (33 pages) 87.

9/9/97 IFS Inspection Follow-Up System (18 pages) 88.

1/9/97.

MIPS - Master Inspection Planning System (10 pages) 89.

1/8/97 Plant Issue Matrixs by Date (33 pages) 90.

Undated St. Lucie Nuclear Plant. Standard Briefing Package (83 page.;)

j 91.

Undated Note to K Landis from M Miller.

Subject:

St. Lucie

e Unit 2 Reduced Inventory Operations (2 pages) 6

-s 92.

Undated MemorandumtoEMerschoffetal.,fromKLandis.

Subject:

Systematic Assessment of Licensee Performance.(SALP)

Input Request (90 pages) 93.

Undated Inspector's Input (12 pages) 94.

Undated Unit 2 HPSI Walkdown (3 pages)

.95.

Undated St. Lucie Major Issues (3 pages) j 96.

Undated Draft / Regional Review (8 pages) 97.

Undated St. Lucie 1-(6 pages) t I

i

DEBEVOISE & PLIMPTON ienEro 875 THIRD AVENUE asgss4mEgg 21 aggoE v

.sgTE wu NEW YORK, NY 10022 Turm raca us sooo TEuewoNE css. )ao 7a 1212 TELEpwoNE u4 iri) 32s o77, (212) 905M5000 TEL.EcoNER (2o2) 383-8118 TEMCONER (331) 47 2o So 82 TEdComER W4171) 329 o86o 30NEEs CENT lo66 BUDAPEST TELECoPIER: (212) 909-6836 TnEpwoNE seSa 201o 7918 TEM c36. l13 e645 TrucomEn assa asio sa2e TEacomEn (36-1) 132 7995 November 14, 1996 NU Russell Powell Chief of the FOIA/LPDR C.ase NO J4-M85

//-/f-9 4 Nuclear Regulatory Commission

() ate Rec'd

__ goo g Mail Stop T6D8 g y' Washington, D.C. 20555-0001 EU i-

Dear Mr. Powell:

This is a request under the Freedom of Information Act, 5 U.S.C. S 552.

I request that a copy of all records and other documents that fit the following description be sent to me:

1) A1) records or other documents from January 1, 1993 to the present that are not currently in the i

l public documents room and that relate to Florida Power and Light's St. Lucie Nuclear Power Plant (Unit 1 and/or Unit 2).

2) The number of inspection hours (by quarter) devoted

)

by the NRC to all licensed nuclear plants in region 2 since January 1, 1993.

In order to help deterutine my status for the purpose of assessing any fees, you should be advised that I represent a company, and I am seeking information for use related to the company's business.

Please advise me of any fees associated with processing this request.

Sincerely,

<_ fy Neil S. Binder e.