ML20246N309

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/89-03 & 50-251/89-03 on 890206-10 & Notice of Violation (Nov).Nov & Details of Insp Repts Withheld
ML20246N309
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/15/1989
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML20246N314 List:
References
NUDOCS 8903270344
Download: ML20246N309 (2)


See also: IR 05000250/1989003

Text

_ - -

-. - -

. . .

--

p

i SAFEGUARDS INFORMATION

-

.

,gtif R

Docket Nos. 50-250, 50-251

,_

.

License Nos. DPR-31, DPR-41

/"4 i

Florida Power and Light Company

' ATTN: Mr. W. F. Conway

' Senior Vice President - Nuclear

'P. O. Box 14000

' Juno Beach, FL- 33408-0420

Gentlemen:

SUBJECT: NOTICE'0F-VIOLATION

(NRC INSPECTION REPORT NOS. 50-250/89-03 AND 50-251/89-03)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

A. Tillman on February 6-10, 1989. -The inspection included a review of

activities authorized for your Turkey Point facility. At the conclusion of the.

inspection, .the . findings .were discussed with those members of your staff

identified-in'the enclosed Inspection Report.

!

Areas examined during the inspection ' are . identified in the ' report. Within

these . areas, the inspection consisted of selective examinations of procedures

.

and representative records, interviews with personnel, and observation of.

activit'ies in progress.

The inspection findings indicate that certain activities :ppeared to violate

NRC requirements. The violations, references to pertinent requirements, and

elements to.be included in your response are described in the enclosed Notice

of Violation.

The violations described in the enclosed Notice are similar to violations

contained in the Notice sent to you by our letter dated February 11, 1988.

'

Because "similar violations," as descrit,ed in the NRC Enforcement Policy, are

of significant concern to the NRC, please give particular attention in your

response to the identificat$on cf the root cause of these problems and your

corrective action to prevent recurrence. We 'are concerned about the

implementation of your security program that permits these repetitive

violations to occur. Consequently, your response should also describe those

particular actions taken or planned to improve the effectiveness of your

program.

I

!

oocument transmitted herewith

contains stnsitive unclassified

mformation. When separa'ed from

enclosures, ttus coeument is decontrolled.

8903270344 890315 ARDS INFORMATION k

PDR ADOCK 05000250 -i

Q PDC

L----_-___--________- _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

\ _

- - - - - - - _ - _

,

.

-

SAFEGUARDS INFORMATION- MAR 151989

'

-

Florida Power and Light Company 2

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure. Therefore, the enclosures

to this letter with the exception of the report cover page, which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

' clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

J. Philip Stohr, Director

Division of Radiation Safety-

and Safeguards

Enclosures:

1. Notice of Violation

(Safeguards Information)

2. NRC Inspection Report

(Safeguards Information)

cc w/encis:

J. S. Odom, Vice President

Turkey Point Nuclear Plant

J. E. Cross, Plant Manager

Turkey Point Nuclear Plant

'

L. W. Bladow, Plart QA Superintendent

J. Arias, Jr. , Regulatory and Compliance

Supervisor

l cc w/ inspection Summary:

State of Florida

bec w/ enc 1:

NRR/DRIS/SB

bec w/ Inspection Summary:

Document Control Desk (RIDS IE04), 016 occurnent ion $ mitt'd ':**i'"

G. E. Edison, Project Manager, Project "lyglfn"'$'en",$$ tit,orn

Directorate II-2, Division of Reactor enciosu.es. this document is decontro"'*

Projects, NRR

NRC Resident Inspector

DRS Technical Assistant

1 RII RII RII RII /, i a

tj uire e e ak i on J' i

A

03/f///89 03/g/89 /

03/pr/89 03/7/89 03/$/89 03/7 89

SAFEGUARDS INFORMATION

,.

L_____.__._.-_.___-___ _ . _ _ _ . . _ _ _ _ . _ . . _ _ _ ...__._ _________ _ _ _ _ __ _ _ _ __ _ . _ _ _ _ _ _ . _ __ ___.___.__ .____ _ _ _