ML20205B237
| ML20205B237 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/20/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20205B241 | List: |
| References | |
| NUDOCS 8703270573 | |
| Download: ML20205B237 (2) | |
See also: IR 05000250/1987011
Text
,_
_ _ _ _ _ _ _ _ _ _ _ _
-
+
SAFEGUARDS INFORMATION-
MAR 20 887
Docket Nos. 50-250 and 50-251
License tios. DPR-31 and DPR-41
Florida Power and Light Company
ATTN: Mr. C. O. Woody
Group Vice President
Nuclear Energy Department
P. O. Box 14000
Juna Beach, FL 33408
Gentlemen:
SUBJECT:
MEETING SUMMARY - NRC INSPECTION REPORTS NOS. 50-250/87-11 AND
50-251/87-11
This letter refers to the Enforcement Conference held at our request at the
Region II Office on February 23, 1987, and the followup physical security
inspection conducted onsite on March 3-4, 1987.
This meeting concerned
activities authorized by NRC Operating License Nos. DPR-31 and DPR-41 for the
Turkey Point Nuclear Facilities.
The meeting related to programmatic problems
associated with the Turkey Point Physical Security Program.
Our concerns about violations of regulatory requirements pertaining to the
l
application and maintenance of compensatory measures for the control of access
l
l
into the protected and vital areas were expressed to Florida Power and Light
'
Company (FP&L) representatives at the meeting.
The issues discussed at the
meeting and ac' dressed in Inspection Report Nos. 50-250/87-05 and 50-251/87-05,
dated February 10, 1987, and this report are under consideration for escalated
l
enforcement action.
Accordingly, no Notice of Violation is being issued at
l
this time.
No response to these items is required.
However, please be
advised that the number and characterization of the violations may change as a
result of further NRC review.
It is our opinion that this meeting was beneficial and has provided for a
better understanding of inspection findings and enforcement issues.
In
accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures
!
to this letter, with the exception of the report cover page which presents a
I
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
327yh f5
,
,
0
g
J. Nelson Grace
Regional Administrator
Enclosure:
(See page 2)
, SAFEGUARDS INFORMATION+
M
'\\
SAFEGUARDS'INFORMATION
-
o
Florida Power and Light Company
2
MAR 2 01987
Enclosure:
NRC Inspection Report
(Safeguards Information)
cc w/ enc 1:
C. M. Wethy, Vice President, Turkey
Point Nuclear Plant
C. J. Baker, Plant Manager, Turkey
Point Nuclear Plant
L. W. Bladow, Plant QA Superintendent
J. Arias, Jr. , Regulatory and Compliance
Supervisor
bcc w/ enc 1:
IE File
NHSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
-
NRC Resident Inspector
Document Control Desk, 016
State of Florida
ATillman
fre WCli e
Stohr
BWilson
DVerrelli
LReygs
0 1% /87
03/[/87 03/ /87 03//S'/87 03/g/87 03/$/87
03/pJ/87
"
.
"?
J6
s
rnst
G3/g87
03/)*/87
SAFEGUARDS INFORMATl0N
.
..
- --
_ - - . .
.-
-.