Forwards Enforcement Conference & Physical Security Insp Repts 50-250/87-11 & 50-251/87-11 on 870223 & 870303-04. Conference Concerned Issues Discussed in Insp Repts 50-250/87-05 & 50-251/87-05.Notice of Violation Not Issued
ML20205B237
Person / Time
Site: Turkey Point  
Issue date: 03/20/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML20205B241 List:
References
NUDOCS 8703270573
Download: ML20205B237 (2)


See also: IR 05000250/1987011

Text

,_

_ _ _ _ _ _ _ _ _ _ _ _

-

+

SAFEGUARDS INFORMATION-

MAR 20 887

Docket Nos. 50-250 and 50-251

License tios. DPR-31 and DPR-41

Florida Power and Light Company

ATTN: Mr. C. O. Woody

Group Vice President

Nuclear Energy Department

P. O. Box 14000

Juna Beach, FL 33408

Gentlemen:

SUBJECT:

MEETING SUMMARY - NRC INSPECTION REPORTS NOS. 50-250/87-11 AND

50-251/87-11

This letter refers to the Enforcement Conference held at our request at the

Region II Office on February 23, 1987, and the followup physical security

inspection conducted onsite on March 3-4, 1987.

This meeting concerned

activities authorized by NRC Operating License Nos. DPR-31 and DPR-41 for the

Turkey Point Nuclear Facilities.

The meeting related to programmatic problems

associated with the Turkey Point Physical Security Program.

Our concerns about violations of regulatory requirements pertaining to the

l

application and maintenance of compensatory measures for the control of access

l

l

into the protected and vital areas were expressed to Florida Power and Light

'

Company (FP&L) representatives at the meeting.

The issues discussed at the

meeting and ac' dressed in Inspection Report Nos. 50-250/87-05 and 50-251/87-05,

dated February 10, 1987, and this report are under consideration for escalated

l

enforcement action.

Accordingly, no Notice of Violation is being issued at

l

this time.

No response to these items is required.

However, please be

advised that the number and characterization of the violations may change as a

result of further NRC review.

It is our opinion that this meeting was beneficial and has provided for a

better understanding of inspection findings and enforcement issues.

In

accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures

!

to this letter, with the exception of the report cover page which presents a

I

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

327yh f5

,

,

0

g

J. Nelson Grace

Regional Administrator

Enclosure:

(See page 2)

, SAFEGUARDS INFORMATION+

M

'\\

SAFEGUARDS'INFORMATION

-

o

Florida Power and Light Company

2

MAR 2 01987

Enclosure:

NRC Inspection Report

(Safeguards Information)

cc w/ enc 1:

C. M. Wethy, Vice President, Turkey

Point Nuclear Plant

C. J. Baker, Plant Manager, Turkey

Point Nuclear Plant

L. W. Bladow, Plant QA Superintendent

J. Arias, Jr. , Regulatory and Compliance

Supervisor

bcc w/ enc 1:

IE File

NHSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

-

NRC Resident Inspector

Document Control Desk, 016

State of Florida

ATillman

fre WCli e

Stohr

BWilson

DVerrelli

LReygs

0 1% /87

03/[/87 03/ /87 03//S'/87 03/g/87 03/$/87

03/pJ/87

"

.

"?

J6

s

rnst

G3/g87

03/)*/87

SAFEGUARDS INFORMATl0N

.

..

- --

_ - - . .

.-

-.