ML20137K816

From kanterella
Jump to navigation Jump to search
Twenty-second Partial Response to FOIA Request for Documents.Records in App Bbb Encl & Will Be Available in PDR
ML20137K816
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 04/02/1997
From: Racquel Powell
NRC OFFICE OF ADMINISTRATION (ADM)
To: Binder N
DEBEVOISE & PLIMPTON
Shared Package
ML20137K821 List:
References
FOIA-96-485 NUDOCS 9704070105
Download: ML20137K816 (6)


Text

F U.S. NUCLEAR RE2ULATERY COMMISSION k%d FOIA 96-485 NRC FOlA REQUEST NUMBER (S) g RESPONSE TYPE y

RESPONSE TO FREEDOM CF l FINAL l )(l rA tTIAL (22nd)

~. FORMATION ACT (FOIA) REQUEST oATE c.a.l M 0 o 1997 o

DOCKET NUMBER (S)(//apphcable)

REQUESTER Neil S. Binder PART l. -AGENCY RECORDS RELEASED OR NOT LOCATED (See checkedboxes)

No agency records subject to the request have been located.

No additional agenc( records subject to the request have been locateci.

Requested recorr$ are available through another public distribution program. See Comments section.

Agency records subject to the request that are Identified in Appendix (es)

~

are already available for public inspection and copying at the NRC Public Document Room,2120 L Street, N.W., Washington, DC.

Al,ency recntds subject to the request that are identified in Appendix (es) 888 are being made available for public inspection and copying X

.i th. NRC Public Document Room,2120 L Street, N.W., Washington, DC, in a folder under this FOI A number.

The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a member of my staff is now being made available for public inspection and copying at the N RC Public Document Room,2120 L Street, N.W., Washington, DC, in a folder under this FOl A number.

Agency records subject to the request that are identified in Appendix (es) may be inspected and copied at the N RC Local Public i ocument Room identified in the Comments section.

Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, N.W., t"ashington DC.

X Agency records subject to the request are enclosed.

  • l Records subject to the request have been referred to another Federal agency (ies) fx review and direct response to you.

Fees You will be billed by the NRC for fees totaling 5 You will receive a refund from the NRC in the amount of 5 In view of N RC's response to this request, no further action is being taken on appeal letter dated

, No.

f PART ll. A-lNFORMATION WITHHELD FROM PUBLIC DISCLOSURE Cert;ln informatinn in the requested records is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated in Part 11, B, C, and D. Any released portions of the documents for which only part of the record !s being withheld are being made available for public inspection and copying in the NRC Public Document Room,2120 L Street, N.W., Washington, DC in a folder under this FOI A number, lCOMMENTS 3 Copies of the records identified on Appendix BBB are enclosed.

l l

/

.N g, oiR OR viSiO F F REEDOM NFORMATsON AND PUBLICATIONS SERVICES R

l pg Q Q l[

yy QQ pggg, &

q w

\\d

$db[ hh hk S

~ : 'h 5

9704070105 970402 hi PDR FOIA r

BINDER 96-485 pyg

--- r-ef* Snetta AAA (Pe* Il i1.Q18 gg

/G

Re:

F01A-96-485 APPENDIX BBB RECORDS BEING RELEASED IN THEIR ENTIRETY N0.

DATE DESCRIPTION /(PAGE COUNT) 1.

06/7/96 Maintenance Rule Expert Panel Meeting Minutes (2 pages) 2.

06/27/96 Maintenance Rule Expert Panel Meeting Mirutes (1 page) 3.

07/08/96 Maintenance Rule Expert Panel Meeting Minutes (2 pages) 4.

07/09/96 Maintenance Rule Expert Panel Meeting Minutes (2 pages) 5.

08/09/96 Maintenance Rule Expert Panel Meeting Minutes (2 pages) 6.

08/27/96 Maintenance Rule Expert Panel Meeting Minutes (2 pages) 7.

Undated QA Audit of Maintenance Rule OSL-MR-96-14 (17 pages) 8.

08/27/96 a(1) & A(2) SSCs (2 pages) 9.

01/04/96 Goal Setting and Monitoring (15 pages),

10.

12/21/95 Independent Assessnent of Maintenance Rule Implementation (33 pages) 11.

Undated Expert Panel Member Biographical Summary (5 pages) 12.

07/96 St. Lucie Organization Chart (5 pages) 13.

Undated Site Contacts (1 pages) 14.

Various Operational Department Chronogical Logs (Units 1 and 2) 1996 (316 pages) 15.

03/96 St. Lucie on the Line (4 pages) 16.

12/21/93 Engineering Evaluation SEFJ 93-024 (9 pages)

~

17 08/26/94 Stand Alone Safety Evaluation SEFJ 94-021 (12 pages) 18.

06/15/94 Safety Evaluation SENP-94-021 (10 pages) 19.

08/16/94 Safety Evaluation SPEG-94-029 (14 pages) 20.

01/13/95 Engineering Evaluation SEFJ-95-003 (22 pages) 4 21, 10/09/95 No Significants Hazard Evaluation SEFJ-95-039 (19 pages) 22.

10/12/94 Safety Evaluation SENP-94-026 (66 pages)

I

l

-2 l

Re:

F01A-96-485 i

NO.

DATE DESCRIPTION /(PAGE COUNT)

{

23, 11/30/95 Engineering Evaluation SEFJ-94-079 (56 pages) 24.

10/10/95 Engineering Evaluation SEFJ-95-025 (6 pages) l 25.

08/25/95 Engineering Evaluation SEFJ-95-027 (6 pages) 26.

05/31/95 Safety Evaluation SENP-95-049 (27 pages) 27.

08/18/95 Safety Evaluation SENP-95-100 (24 pages) l 28.

08/22/95 Safety Evaluation SENP-95-101 (17 pages) 29.

8/30/95 Safety Evaluation SENP-95-105 (39 pages) 30.

08/27/95 Engineering Evaluation SENP-95-103 (10 pages) 31.

09/06/95 Safety Evaluation SENP-95-106 (9 pages) 32.

09/08/95 Engineering Evaluation SENP-95-108 (11 pages) 33.

10/10/95 Safety Evaluation SENP-95-021 (13 pages) 34.

03/24/94 Unit 2 PZR Nozzel Repair Schedule (10 pages) 35.

05/02/96 Safety Evaluation SPSL-96-020. Rev 0 (10 pagu )

36.

05/08/96 Safety Evaluation SPSL-96-020. Rev 1 (9 pages) 37.

05/11/96 Safety Evaluation SPSL-96-020. Rev 2 (13 pages) 38.

03/05/96 Safety Evaluation SEFJ-95-023. Rev. 3 (26 pages) 39.

05/24/96 Safety Evaluation SEIS-95-028 (11 pages) 40.

11/19/96 Monthly Indicator Report - October 1996 (55 pages) 41.

10/17/96 Monthly Indicator Report - September 1996 (55 pages) 42.

06/14/96 Monthly Indicator Report - May 1996 (55 pages) 43.

05/14/96 Monthly Indicator Report - April 1996 (55 pages) i 44.

04/17/96 Monthly Indicator Report - March 1996 (55 pages)

)

45.

03/19/96 Monthly Indicator Report - February 1996 (55 pages) 46.

12/18/96 Monthly Performance Monitoring Management Information Report (Nov. 95) (70 pages) 47.

10/18/95 Monthly Performance Monitoring Management Information

(

Report (Sept. 95) (69 pages) 1

, Re:

F0IA-96-485 N0.

DATE DESCRIPTION /(PAGE COUNT) 48.

07/09/96 Maintenance Rule Quarterly Report (132 pages) 49.

06/27/96 Maintenance Rule Expert Panel W/ Meeting Minutes (2 pages) 50.

07/08/96 Maintenance Rule Expert Panel W/ Meeting Minutes (2 pages) 51.

07/09/96 Maintenance Rule Expert Panel W/ Meeting Minutes (2 pages) 52.

08/09/96 Maintenance Rule Expert Panel W/ Meeting Minutes (2 pages) 53.

08/27/96 Maintenance Rule Expert Panel W/ Meeting Minutes (2 pages) 54.

06/07/96 Maintenance Rule Expert Panel W/ Meeting Minutes (2 pages) 55.

03/29/96 PM-96-03-526 (14 pages) 56.

03/29/96 PM-96-03-527 (13 pages) 57.

03/29/96 PM-96-03-528 (24 pages) 58.

04/12/96 PM-96-03-535 (10 pages) 59.

04/15/96 PM-96-03-540 (12 pages) 60.

04/22/96 PM-96-03-543 (11 pages) 61.

05/21/96 PM-96-03-545 (28 pages) 62.

04/17/96 PM-96-03-547 (26 pages) 63.

05/01/96 PM-96-03-891 (8 pages) 64.

05/01/96 PM-96-04-130 (9 pages) 65.

05/01/96 PM-96-04-133 (4 pages) 66.

05/01/96 PM-96-04-134 (4 pages)

E7.

06/14/96 PM-96-05-024 (11 pages) 68.

07/10/96 PM-96-05-023 (167 pages) 69.

06/10/96 Safety Evaluation SENS-96-039 (32 pages) 70.

Undated St. Lucie FSAR Review Findings (57 pages) 71.

06/03/96 Topical 0A Report TOP 3.0 (10 pages) 72.

10/01/96 Letter from J. A. Noyes (ABB) to William Lynch (FPL) (7 pages) j 73.

02/05/93 Design Basis Program (16 pages)

1 Re:

FOIA-96-485 k

l N0.

DATE DESCRIPTION /(PAGE COUNT) 74.

04/26/96 QA Topical (App C) (26 pages) 75.

10/10/96 Memo from L.W. Bladow to O Denver (5 pages) 76.

04/26/96 PCM-009-195 (61 pages) 77.

07/06/96 Memo from D. Denver to S. A. Valdes (CR-1075) (10 pages) 78.

09/09/96 OA Audit OSL-PH-96-17 (43 pages) 79.

04/22/96 OA Audit OSL-SEC-96-03 (20 pages)-

80.

Undated Security Training Read Card (14 pages) 81.

01/26/96 Night Order (1 page) 82.

01/25/96 Night Order (1 page) 1 83.

04/01/96 Plan to Improve Operational Performance (11 pages) 84.

01/95 Nuclear Physics Methodology NF-TR-95-01 (108 pages) 85.

03/29/96 PM-96-03-525 (20 pages) 86.

04/25/96 PM-96-04-131 (3 pages) 87.

04/02/96 PM-96-04-524 (26 pages' 88.

1994 DOCUTECH Service Call Book 1 of 1 (65 pages) 89.

1994 DOCUTECH-Procedure Log and D0C. Requests Book 1 of 1 (260 pages) 90.

Undated FPL Document (580 pages) 91.

09/13/94 J. Clay to C. Burton (6 pages) 92.

01/31/95 J. Clay to C. Burton (2 pages) 93.

08/22/95 K. Korth to J. Scarola (4 pages) 94.

Undated PSL-1FJN-95-001 (11 pages) 95.

11/09/95 V3439 Leakage Dose Assessment Scaling Method (7 pages) 96.

Undated Handwritten Offsite Radiological Consequence of leakage through safety relief Valve (4 pages) 97.

03/29/96 JPN-PSL_SEMS-96-007 (31 pages) 98.

10/02/95 D. Sager to all plant personnel (1 page)

_g_

Re:

F01A-96-485 NO.

DATE DESCRIPTION /(PAGE COUNT) 99.

01/22/96 Excess Boron Dilution Event - St. Lucie Unit 1 (16 pages) 100. 08/31/95 D. Denver to S. Valdes (2 pages) i j

.~.

<e DEBEVOl0E & PLIMPTON 1

875 THIRD AVENUE

,sss g

STREET.

21 AVENUE GE V

1 CREED

.5 TE HE.L NEW YORK, NY 10022 TEt.EPwCNE (2023 383@00 TELEPHONE (33.H 40 731212 TELEPHONE 444-1711329 0779 (2ig g TELECOPIER (202) 383-8118 TELECOPIER (33-U 47 20 50 82 TELECOPIEH (44171) 329 0860 13F ENTERT AINedENT BVILDNG 30 QUEEN'S ROAD CENTRAL 1065 BUDAPEST TELECoPIER: (212) 909-6656 TELEPHONE 2)2810 7918 TELEPF

1) 31 0845 TELECOPER (85212810 9828 TELECCPER (361) 132 7995 November 14, 1996 P AN U Russell Powell Chief of the FOIA/LPDR Caw No-Jf,-g85 Nuclear Regulatory Commission Cab Rec'(1

//-/_f-9 /o Mail Stop T6D8 gg*

gg -

Washington, D.C. 20555-0001 RelatedCnw

Dear Mr. Powell:

j This is a request under the Freedom of Information Act, 5 U.S.C. S 552.

I request that a copy of all records and other documents that fit the following description be sent to me:

1) All records or other documents from January 1, 1993 to the present that are not currently in the public documents room and that relate to Florida Power and Light's St. Lucie Nuclear Power Plant (Unit 1 and/or Unit 2).
2) The number of inspection hours (by quarter) devoted by the NRC to all licensed nuclear plants in region 2 since January 1, 1993.

In order to help determine my status for the purpose of assessing any fees, you should be advised that I represent a company, and I am seeking information for use related to the company's business.

Please advise me of any fees associated with i

processing this request.

Sincerely,

-[

1

'.c h,:~ &

Neil S. Binder A,,7n,/,2,/ n 7 c/ *?

v w

n u

(_.-____-__,____.

_,