February 24, 1987
Docket Nos. 50-250, 50-251
Fb rida Power and Light Company
lATTN: Mr. C. O. Woody
Group Vice President
Nuclear Energy Department
P. O. Box 14000
Juno Beach, FL 33408
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-250/86-46 AND 50-251/86-46
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
B. Debs and C. Vanderniet on November 17 - 21, 1986.
The inspection included
a review of activities authorized for your Turkey Point facility.
At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to the unresolved items ider.tified in the inspection
report. These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by D. Verrelli)
870323o306 B70224
ADOCK 0500
0
gDR
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
lll
.L Ect
_ _ - _ - - _ _ - - _ _ - - -
-, . _-
, - - ,
- _ - _
_
--_._
__
--.
,_
.
?
(
/;; -'
'
.
Florida Power and Light Company
2
February 24, 1987
- cc w/ encl:
LE. M. Wethy, Vice President
Turkey Point Nuclear Plant
M.J. Baker,PlantManager
.. Turkey Point Nuclear Plant
it'. W. Bladow, Plant QA
_Juperintendent
15. Arias, Jr., Regulatory and
Compliance Supervisor
bec w/ encl:
tNftC Resident-Inspector
Document Control Desk
State of Florida
RII
RII
RII,
RII
R
McGuire
CVanJ r
- cdg
MShymlock
CJul an
on
d
02/y87
02/g87
2g/87
2/ /87
2/7/87
RII
D
elli
2/ c 87
f
-
.