Forwards Draft SAIC-85/1519-1, Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities'.... Util Response Incomplete in Four Areas Evaluated
ML20128G438
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/16/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20128G443 List:
References
GL-83-28, NUDOCS 8505300159
Download: ML20128G438 (2)


Text

__ . _ .

i MAY f 61985 Dodet No. 50-302 DI -

( Docket File JPartlow NRC PDR ACRS-10 L POR RIngram i Mr. Walter S. Wilgus ORB #4 Rdg HSilver Vice President, Nuclear Operations HThompson Gray File Florida Power Corporation OELD EBrach

ATTN
Manager, Nuclear Licensing EJordan H0rnstein

& Fuel Management BGrimes P. O. Box 14042; M.A.C. H-2 St. Petersburg, Florida 33733

Dear Mr. Wilgus:

SUBJECT:

DRAFT TECHNICAL EVALUATION REPORT (TER) FOR SALEM ATWS ITEM 1.2 (GENERICLETTER83-28)

Re: Crystal River Unit 3 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2. For Crystal River Unit 3, your response was found to be incomplete in four of the areas evaluated.

l The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated. Pen and ink changes have been made to the TER by your project manager to make the wording consistent with our approach.

In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review. It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the DRAFT TER. Your project manager will be working with you to arrange an acceptable time to conduct the necessary conference calls.

Sincerely, "oia 31xJ. sIcam r.;r JCni 7. SIG*

John F. Stolz, Chief

=

Operating Reactors Branch #4 Division of Licensing

=

Enclosure:

ORAFT TER on SALEM ATWS Item 1.2

! cc w/ enclosure:

i See next page ORB. :DL b DL 8505300159 850516 HSilver;cr JSt hDR ADOCK0500g2 5/l&85 5/ 85 i mm aremmemanium iium-

Mr. W. S. Wilgus Crystal River Unit No. 3 Florida Power Corporation cc: .Ulray Clark, Administrator Mr. Robert B. Borsum Radiological Health Services Babcock t, Wilcox Department of Health and Nuclear Power Generation Division Rehabilitative. Services Suite 220, 7910 Woodmont Avenue 1323 Winewood Blvd. Bethesda, Maryland 20314 Tallahassee, Florida 32301 Mr. Wilbur Langely, Chairman Mr. Tom Stetka, Resident Inspector Board of County Commissioners U. S. Nuclear Regulatory Commission Citrus County Route #3, Box 717 Inverness, Florida 36250 Crystal River, Florida 32629 Regional Radiation Representative Nuclear Plant Manager EPA Region IV- Florida Power Corporation 345 Courtland Street, N. E. P. O. Box 219 Atlanta, Georgia 30308 Crystal River, Florida 32629 Administrator Bureau of Intergovernmental Relations Department of Environmental Regulation 660 Apalachee Parkway Power Plant Siting Section Tallahassee, Florida 32304 State of Florida 2600 Blair Stone Road Tallahassee.. Florida 32301 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission, Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303