Category:CONTRACTED REPORT - RTA
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:QUICK LOOK
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20140G5481997-03-0707 March 1997 Rev 0 to, Initial Review of Florida Power Crystal River Ampacity Derating Test Rept 95NK17030NC1973 ML20140F3841997-01-13013 January 1997 Rev to Technical Evaluation Rept of IPE Submittal & RAI Responses for Crystal River Power Station,Unit 3 L-94-025, Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 31994-12-31031 December 1994 Ter,Audit of Plant Specific License Conversion to STS: Crystal River Unit 3 ML20077A0211994-10-31031 October 1994 Audit of Plant Specific License Conversions to Sts,Unit 3, TER ML20077E9451994-09-30030 September 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Crystal River-3 ML20096H3601992-03-17017 March 1992 Supplemental TER Crystal River Unit 3 Station Blackout Evaluation ML20091S0871992-01-31031 January 1992 Trip Rept: Onsite Analysis of Human Factors of Event at Crystal River Unit-3,911208,(Pressurizer Spray Valve Failure ML20095C0511991-12-31031 December 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan ML20079D3281991-06-30030 June 1991 RISK-BASED Inspection Guide for Crystal River Unit 3 Nuclear Power Plant ML20245D6841988-08-31031 August 1988 Rev 1 to Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Crystal River Unit 3 ML20151C7101988-07-12012 July 1988 Technical Evaluation Rept of Dcrdr for Florida Power Corp Crystal River 3 Generating Station ML20153B3731988-02-29029 February 1988 Safety Evaluation of Topical Rept B&W Document 47-1159091-00, 'Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry.' ML20235M3021987-06-30030 June 1987 TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing Crystal River Unit 3, Informal Technical Evaluation Rept ML20235K6141987-06-15015 June 1987 Technical Evaluation Rept of Florida Power Corp Response to NRC Order for Mod of License `Inadequate Core Cooling Instrumentation Sys' NUREG-0737,Item II.F.2 for Crystal River Unit 3 Nuclear Power Plant ML20214R4631987-04-30030 April 1987 Comformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Crystal River-3, Final Informal Rept ML20215J1161987-02-28028 February 1987 Technical Evaluation Rept of Crystal River Nuclear Generating Station Unit 3 Response to NRR Generic Ltr 87-37, Interim Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20234D5481986-05-31031 May 1986 Conformance to Reg Guide 1.97 Crystal River,Unit 3 ML20210C2991986-03-20020 March 1986 Masonry Wall Design,Crystal River Unit 3, Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20134P1671985-08-29029 August 1985 Evaluation of Dcrdr Summary Rept for Crystal River Unit 3 Generating Station ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20136G1421985-05-31031 May 1985 Conformance to Reg Guide 1.97,Crystal River,Unit 3 ML20128G4601985-05-16016 May 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Crystal River Nuclear Plant,Unit 3, Technical Evaluation Rept ML20092J8841984-06-22022 June 1984 Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept ML20093G0341983-12-31031 December 1983 Conformance to NRC Generic Ltr 83-16,Crystal River Nuclear Generating Plant Unit 3, Technical Evaluation Rept ML20081D0991983-10-31031 October 1983 Review of Crystal River Nuclear Generating Station Unit 3 Emergency Feedwater System Reliability Analysis ML20080C5971983-07-22022 July 1983 Seismic Qualification of Auxiliary Feedwater Sys,Crystal River Nuclear Plant Unit 3, Technical Evaluation Rept ML20126F6591983-06-30030 June 1983 Containment Leak Rate Testing, Monthly Progress Rept for June 1983 ML20077K8561983-06-13013 June 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Florida Power Corp,Crystal River Unit 3, Technical Evaluation Rept ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20084M5061983-01-28028 January 1983 Control of Heavy Loads (C-10),Florida Power Co,Crystal River Unit 3, Draft Technical Evaluation Rept ML20027C0221982-10-0101 October 1982 Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SER (F-11 & B-60), Crystal River Unit 3, Technical Evaluation Rept ML20065C3621982-09-21021 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Technical Evaluation Rept ML20069D0551982-08-17017 August 1982 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Crystal River Unit 3, Technical Evaluation Rept ML20062A8641982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation) ML20069G0111982-07-31031 July 1982 Tech Specs for Redundant DHR Capability,Crystal River, Unit 3, Informal Rept ML20027A8061982-06-30030 June 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20055B3851982-06-22022 June 1982 ECCS Repts - TMI Action Plan Requirements, Request for Addl Info ML20050A6461982-03-31031 March 1982 Crystal RIVER-3 Safety Study.Volume 2-Appendices ML20040E5641981-12-21021 December 1981 Control of Heavy Loads, Draft Technical Evaluation Rept ML20039G4651981-11-30030 November 1981 Degraded Grid Protection for Class IE Power Sys,Crystal River Nuclear Generating Plant,Unit 3. ML20003G1561981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Informal Rept ML19247E2011981-03-23023 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3,Docket 50-302, Informal Rept ML20009B1241981-02-28028 February 1981 Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re Engineered Safety Features Reset Controls. ML20003C2581981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. ML20003C1011981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Crystal River Unit 3, Preliminary Rept ML20008F4831981-01-31031 January 1981 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant Unit 3. 1997-03-07
[Table view] |
Text
- -
SAfC-85/1519-1 REVIEW OF LICENSEE AND APPLICANT RESPONSES
.TO NRC GENERIC LETTER 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events) Item 1.2
" POST-TRIP REVIEW: DATA AND INFORMATION CAPABILITIES" FOR CRYSTAL RIVER NUCLEAR PLANT, UNIT 3 (50-402)
Technical Evaluation Report Prepared by Science Applications International Corporation 1710 Goodridge Drive
, McLean, Virginia 22102
~
I Prepared for U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Contract No. NRC-03-82-096 8505300166 DR 850516 p ADOCK 05000302 PDR L
~
FOREWORD This report contains the technical evaluation of the Crystal River 3 responte to Generic Letter 83-28 (Required Actions Based on Generic Implica-tions (,f Salem ATWS Events), . Item 1.2 " Post Trip Review: Data and Informa-tion Capabilities."
For the purposes of this evaluation, the review criteria, presented in -
part'2 of this report, were divided into five separate categories. These are:
. 1. The parameters monitored by the sequence of events and the time history recorders,
- 2. The performance characteristics of the sequence of events recorders,
- 3. The performance characteristics of the time history recorders,
- 4. The data output format, and
- 5. The long-term data retention capability for post-trip review material. ,
- All available responses to Generic Letter 83-28 were evaluated. The plant for which this report is applicable was found to have adequately responded to, and met, category 4. gg g,d
- The report describes the specific methods used to determi the cate-gorization of the responses to Generic Letter 83-28. Since t s evaluation report was intended to apply to more than one nuclear power ant specifics
. regarding how each plant met (or failed to meet) the nr'.::::t: are not presented. Instead, the evaluation presents a categorization of the responses according to which categories of are satisfied and which are not. The evaluations are based on.,_..h........
spec ic criteria (Section 2) derived from the requirements as stated in the gener c letter.
mEau ah i e
- , . . . . - - - - , .,.--.-_-_-._--_2-
TABLE OF CONTENTS
- Section- Page Introduction. . . . . . . . . . . . . . . . . . . . . . . . . I
- 1. Background. . . . . . . . . . . . . . . . . . . . . . . . . . 2
- 2. Review Criteria . . . . . . . . . . . . . . . . . . . . . . . 3
- 3. Evaluation.-, . . . . . . . . . . . . , , . . . . . . . . . 8
. 4. Conclusion. . . . . . . . . . . . . . . . . . . . . . . . . . 9
- 5. Re fe re n c e s . . - . . . . . . . . . . . . . . . . . . . . . . . . . 10 G.' (who ocrsutr Occ,umeasy poA Tgs.ace w - - . . . . . . . II z
i e
4
~ w Y- --st- --n-- ,-p.- - vm p.sww r,vm>----ww--m--+w-a----+-sen---wm we -e-.e- - ~ ~ , -mme me-.--w-- -+~ -- =e-~~r--
p INTRODUCTION SAIC has reviewed the tals prepared in response to Generic Letter 83-28, item 1.2 " Post-Trip Review: Data and Information Capability".
The submittals (see references) contained sufficient information to determine that the data and information capabilities at this plant are acceptable in the following area.
- e The output format of the recorded data.
However, the data and information capabilities, as described in the submittal, either fail to meet the review criteria or provide insufficient information to allow determination of the adequacy of the data and information capabilities in the following areas, e The parameters monitored by both the sequence-of-events and time history recorders.
e The sequence-of-events recorder (s) performance charac-teristics. .
e The time history recorder (s) performance characteris-tics.
l e The long-term data retention, record keeping, capa-l bility.
I
(
i I
- - - - - - * ,..., ,,- ..-.---.- , . -- -. _ . - - - , , - - - - - .--,--,w,,,, .r.-- - ----- . .- - - . , , - - - - - , -. . , - , - - -
i 1. Background On February 25, 1984, both of the scram circuit breakers a~t' Unit I of
, the Salem Nuclear Power Plant failed to open upon an automatic reactor trip signal from the reactor protection system. This incident occurred during the plant startup and the reactor was tripped manually by the operator about
! 30 seconds after the initiation of the automatic trip signal. The failure of the circuit breakers has been determined to be related to the sticking of the under voltage trip attachment. Prior to this incident; on February 22, 1983; at Unit 1 of the Salem Nuclear Power Plant an automatic trip signal was generated based on steam generator low-low level during plant startup.
In this case the reactor was tripped manually by the operator almost coinci-j dentally with the automatic trip. At that time, because the utility did not j have a requirement for the systematic evaluation of the reactor trip, no investigation was performed to determine whether the reactor was tripped
- automatically as expected or manually. The utilities' written procedures required only that the cause of the trip be determined and identified the i responsible personnel that could authorize a restart if the cause of the
[ trip is known. Following the second trip which clearly indicated the problem with the trip breakers, the question was raised on whether the circuit breakers had functioned properly during the earlier incident. The most useful source of information in this case, namely the sequence of I
events printout which would have indicated whether the reactor was tripped automatically or manually du'ing r the February 22 incident, was not retained l after the incident. Thus, no ju.dgment on the proper functioning of the trip
- system during the earlier incident could be made.
Following these incidents; on February 28, 1983; the NRC Executive i
Director for Operations (ED0), directed the staff to investigate and report on the generic implications of these occurrences at Unit 1 of the Salem
- Nuclear Power Plant.' The results of the staff's inquiry into the generic l implications of the Salem Unit incidents is reported in NUREG-1000, " Generic
- Implications of ATWS Events at the Salem Nuclear Power Plant." Based on the
! results of this study, a set of required actions were developed and included in Generic Letter 83-28 which was issued on July 8,1983 and sent to all
- licensees of operating reactors, applicants for operating license, and ,
construction permit holders. The required actions in this generic letter consist of four categories. Theseare: (1) Post-Trip Review (2) Equipment i
2 i
J
Ckassification and Vender Interface. (3) Post Maintenance Testing, and (4)
Reactor Trip System Reliability Improvements.
~'
The first required action of the generic letter, Post-Trip Review, is the subject of_ this TER and consists of action item 1.1 " Program Description and Procedure" and action item 1.2 " Data and Information capability." In the next section the review criteria used to assess the adequacy of the utilities' responses to the requirements of action item 1.2 will be discussed.
- 2. Review Criteria The intent of the Post Trip Review requirements of Generic Letter 83-28 is to ensure that the licensee has adequa e procedures and data and information sources to understand the caus , nd progression of a reactor trip. This understanding should go beyond a simple identification of the l
course of the event. It should include the capability to determine the root cause of the reactor trip and to determine whether safety limits have been exceeded and if so to what extent. Sufficient information about the reactor trip event should be available so that a decision on the acceptability of a reactor restart can be made.
The following are the review criteria developed for the requirements of Generic Letter 83-28, action item 1.2:
The equipment that provides the digital sequence of events (50E) record
. and the analog time history records of an unscheduled shutdown should pro-vide a reliable source of the necessary information to be used in the post trip review. Each plant variable which is necessary to determine the cause(s) and progression of the event (s) following a plant trip should be
- ' monitored by at least one recorder Quch as a sequence-of-events recorder or a plant process computer for digital parameters; and strip charts, a plant process computer or analog recorder for analog (time history) variableg.
Each device used to record an analog or digital plant variable should be i described in sufficient detail so that a determination can be made as to whether the following performance characteristics are met:
i 3
- ~ _ . _ , _ - - - - _ _ _ , _ , . _ , , _ _ _ _ _ . _ . . . _ __ _
s Each sequence-of-events recorder should be capable of detecting and recording the sequence of events with a sufficient time '
discrimination capability to ensure that the time responses,asso-ciated with'each monitored safety-related system can be ascer-tained, and that a determination can be made as to whether the time response is within acceptable limits based on 4
FSAR Chapter 15 Accident Analyses. The recommended guideline for the SOE time discrimination is approxi-mately 100 usec. If current 50E recorders do not have this time discrimination capability the licensee or applicant should show that the current time discrimination capability is sufficient for an adequate reconstruction of the course of the reactor trip. As
. a minimum this should include the ability to adequately recon-struct the accident scenarios presented in Chapter 15 of the plant j j- FSAR.
l e Each analog time history data recorder should have a sample inter-val small enough so that the incident can be accurately l reconstructed following a reactor trip. As a minimum, the l licensee or applicant should be able to reconstruct the course of .
the accident sequences evaluated in the accident analysis of the -
i plant FSAR (Chapter 15). The recommended guideline for the sample
- interval-is 10 sec. If the time history equipment does not meet t this guideline, the licensee or applicant should show that the l current time history c,apability is sufficient to accurately recon-
- struct the accident sequences presented in Chapter 15 of the FSAR.
e To support the post trip analysis of the cause of the trip and the proper functioning of involved safety related equipment, each analog time history data recorder should be capable of updating e and retaining information from approximately five minutes prior to
! the trip until at least ten minutes after the trip.
, o The information gathered by the sequence-of-events and time j history data collectors should be stored in a manner that will allow for retrieval and analysis. The data may be retained in either hardcopy (computer printout, strip chart output, etc.)
or in an accessible memory (magnetic disc or tape). This 4
4
.--..-m---v,--,-,, , , . . , . . , . , , , . , . . - -
i l
l information should be presented in a readable and meaningful format, taking into consideration good human factors practices (such as those outlined in NUREG-0700). .
e All equipment used to record sequence of events and time history information should be powered from a reliable and non-interruptible power source. The power source used need not be safety related.
i The sequence of events and time history recording equipment should monitor sufficient digital and analog parameters, respectively, to assure i
that the course of the reactor trip can be reconstructed. The parameters
- '. monitored should provide sufficient information to determine the root cause of the reactor trip, the progression of the reactor trip, and the response of the plant parameters and systems to the reactor trip. Specifically, all j input parameters associated with reactor trips, safety injections and other safety-related systems as well as output parameters sufficient to record the j proper functioning of these systems should be recorded for use in the post trip review. The parameters deemed necessary, as a minimum, to perform a j post-trip review (one that would determine if the plant remained within its design envelope) are presented on Tables 1.2-1 and 1.2-2. If the appli-cants' or licensees' SOE recorders and time history recorders do not monitor
- all of the parameters suggested in these tables the applicant or licensee should show that the existing set of monitored parameters are sufficient to establish that the plant remained within the design envelope for the appro-priate accident conditions; such as those analyzed in Chapter 15 of the i -
plant Safety Analysis Report.
j l
Information gathered during the post trip review is required input for future post trip reviews. Data from all unscheduled shutdowns provides a valuable reference source for the determination of the acceptability of the '
plant vital parameter and equipment response to future unscheduled shut-l downs. It is therefore necessary that information gathered during all post trip reviews be maintained in an accessible manner for the life of the plant.
5 6
. . - . - _ , - _ - - . - , _ , . . - - . . . , , . . , . _ _ . _ , . . , _ - . _ , _ . . _ _ , _ m. , _ _ , . , , , , . . , . ~ - - . - , _ . , ,..,_.,._-..__m,-.
Table 1.2-1. PWR Parameter List SOE Time History *
-Recorder Recorder Parameter / Signal (I) x Reactor Trip (1) x Safety Injection ,
x Containment Isolation (1)x Turbine Trip x Control Rod Position (1) x x Neutron Flux, Power x
- Containment Pressure (2) Containment Radiation x Containment Sump Level (1)x x Primary System Pressure (1)x x Primary System Temperature (1)x Pressurizer Level (1) x Reactor Coolant Pump Status ;
(1)x x Primary System Flow (3) Safety Inj.; Flow. Pump / Valve Status x MSIV Position x x Steam Generator Pressure (1)x x Steam Generator Level
, (1)x x Feedwater Flow (1)x x . Steam Flow (3) Auxiliary Feedwater System; Flow, Pump /Value Status x ACandDCSystemStatus(BusVoltage) x Diesel Generator Status (Start /Stop, l On/Off) x PORY Position (1): Trip parameters (2): Parameter may be monitored by either an SOE or time history recorder.
(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or (c) equipment status recorded on an SOE recorder.
l 6
. . . . _ . - , _ . - _ _ _ . . - . _ , _ _ _ _ , . - . . , _ , , __ , , , . , . _.-_..,_,.,_,_m.____m.- _ ,_ . . __,
- - Table 1.2-2. BWR Parameter List 50E Time History ~~
Recorder Recorder- Parameter / Signal
- x. Reactor Trip x Safety Injection x Containment Isolation i x Turbine Trip x Control Rod Position x (1) x Neutron Flux, Power
,~
x(1) Main Steam Radiation (2) Containment (DryWell) Radiation 4
x(1) x Drywell Pressure (Containment Pressure) i (2) Suppression Pool Temperature x (1) x Primary System Pressure 1 x(1) x Primary System Level x MSIV Position x (1) Turbine Stop Valve / Control Valve Position
. x Turbine . Bypass Valve Position x Feedwater Flow x Steam Flow (3) Recirculation; Flow. Pump Status x(1) Scram Discharge Level
] x (1) ,
Condenser Vacuum x AC and DC System Status (Bus Voltage)
(3)(4) Safety Injection; Flow. Pump / Valve Status x Diesel Generator Status (On/0ff, Start /Stop)
(1): Trip parameters.
, (2): Parameter may be recorded by either an 50E or time history recorder.
(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or (c)equipmentstatusrecordedonan50Erecorder.
(4): Includes recording of parameters for all applicable systems from the
- following
- HPCI, LPCI, LPCS, IC, RCIC.
i 7
i
- ,-.w.- - --- --,-,,-..n,-,---- -,_-,.,v,,-_.,,-_--,nn-.~-- - , , - - - , , _ , - - . , _ , - - . - - - - . , - - ~ , - ,
- 3. Evaluation
~
The parameters identified in part 2 of this report as a part of the review criteria are those deemed necessary to perform an adequate post-trip review. The recording of these parameters on equipment that meets the !
guidelines of the review criteria will result in a source of information that can be used to determine the cause of the reactor trip and the plant response to th.e trip including the responses of important plant systems.
The parameters identified in this submittal as being recorded by the sequence of events and time history recorders do not correspond to the parameters specified in part 2 of this report.
The review criteria require that the equipment being used to record the sequence of events and time history data required for a post-trip review meet certain performance characteristics. These characteristics are intended to ensure that if the proper parameters are recorded, the record-ing equipment will provide an adequate source of information for an effec-tive post-trip review. The information provided in this submittal does not
' indicate that either the time history or SOE equipment used would meet the intent of the performance cr.iteria outlined in part 2 of this report.
- The data and information recorded for use in the post-trip review should be output in a format that allows for ease of identification and use of the data to meet the review criterion that calls for information in a readable and meaningful format. , The information contained in this submittal indicates that this requirement is set. * '
c.tsM* A
! The data and information used during a post-trip view should be
! - retained as part of the plant files. This information ould prove useful
! during future post-trip reviews. Therefore, one n '. r:3 is that infor- -
l mation used during a post-trip review be maintained in an accessible manner for the life of the plant. The information contained within this submittal Jdoes not indicate that this criterion will be met.
i i
i I
8
[ ,
,l' i 4. : Conclusion s
The information . supplied in response, to Generic Letter 83-28 indicates that the current post-t' rip review data and information capabilities are adequate in the following area:
k
- 1. The recorded data is output in a readable and meaningful fomat.
The information supplied in response to Generic Letter 83-28 does not indicate that the post-trip review data and. information capabilities are adequate in the following areas.
- 1. Based upon the information contained in the submittal, all of the parameters specified in part 2 of this report that should be recorded for use in a post-trip review are not recorded.
I
- 2. Time history recorders, as described in the submittal, do not meet 1
the minimum performance' characteristics.
- 3. The sequence of events recorders, as described in the submittal, do not meet the minimum performance requirements.
- 4. The -data retention procedures, as described in the submittal, do l not indicate that the information recorded for the post-trip review is maintained .in an accessible manner for the life of the l plant. ed.
yWY '
It is possible that the current data and information capabiliti at this nuclear power plant are adequate to meet the intent of these - "-----'-
but were not completely described. Under these circumstances, the licensee should provide an updated, more complete, description to show in more detail the data and information capabilities at this nuclear power plant. If the information provided accurately represents all current data and information capabilties, then the licensee should either show that the data and informa-tion capabilities meet the intent of the criteria in part 2 of this report, or detail future modifications that would enable the licensee to meet the intent of the evaluation criteria.
b 9
REFERENCES NRC Generic Letter 83-28. " Letter to all licensees of operating reactors, applicants for operating license, and holders of construction permits regarding Required Actions Based on Generic Implications of
-Salem ATWS Events." July 8, 1983.
NUREG-1000, Generic Implications of ATWS Events at the Salem Nuclear Power Plant, April 1983.
Letter from G.R. Westafer, Florida Power Corporation, to D.G. Eisenhut.
NRC, 3 F1183-03 dated November 4,1983, in response to Generic Letter t
., 83-28 of July 8,1983, with attachment.
Response to Generic Letter 83-28 for Crystal River Unit 3.
Letter from G.R. Westafer, Florida Power Corporation, to D.G. Eisenhut, NRC, dated July 31, 1984 Accession Number 8408060199, transmitting updated CR-3 specific response to Generic Letter 83-28 of July 8,1983.
9 i
i 1.
10
l l
. 1 SUffeekE
~
Crystal River -
- 1. Parameters recorded: Unsatisfactory See attached table for discrepancies.
- 2. SOE recorders performance characteristics: Satisfactory 4.2ms time discrimination with a vital bus
- Plantpower process su comp (uter:
points) pply annunciator events recorder system scans 2100 data
- 3. Time history recorders performance characteristics: Satisfactory Plant process computer: 15 sec sampling interval ,for 15 minutes pre-and post-trip RECALL system: 1 sec sample interval 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> of data can be recorded automatically, powered from a vital bus (The RECALL system meets the requirements and does monitor all the required parameters (analog). Since this one system does meet the time history requirements and the purpose is to evaluate time response of plant, as detailed in response to 1.1, the response to this item is satisfactory.)
- 4. Data output format: Satisfactory SOE: time of event, event descriptor and sensor ID are output Analog: RECALL system plots value vs. time
- 5. Data retention capability: Unsatisfactory Data is kept on file but for an indefinite time period.
Il
,~, - . _ . . - . - .
t Required PWR Parameters for Post Trip Review (circled parameters are not recorded)
SOE Time History
- Recorder Recorder Parameter / Signal
()) Reactor Trip (1) Safety Injection Containment Isolation (1) Turbine Trip Control Rod Position (1) x Neutron Flux, Power l A Containment Pressure -
2 Containment Radiation x Containment Sump Level (1)@ Primary System Pressure (Vessel Pressure, Pressurizer Pressure)
(1) x Primary System Temperature (1) Pressurizer Level (1) Reactor Coolant Pump Status (1) x Primary System Flow Safety Inj.; Flow Pump / Valve Status MSIV Position x Steam Generator Pressure (1) x Steam Generator Level (1) x Feedwater Flow (1) x Steam Flow
@ Auxiliary Feedwater System; Flow.
Pump /Value Status AC and DC System Status Diesel Generator Status PORV Position (1): Trip parameters; pressurizer -or primary pressure is a trip parameter (depending on plant).
(2): Parameter may be monitored by either an SOE or time history recorder.
(3): Acceptable recorder options are: (a) reactor vessel pressure recorded on both an SOE and time history recorder, or (b) pressurizer pressure recorded on both an SOE and time history recorder.
.(4): Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or (c) equipment status recorded on an SOE recorder.