ML20140F907

From kanterella
Revision as of 18:20, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Deletion of Footnote 6 & Addition of within Specified Range to Proposed Surveillance Requirements 4.7.7.2b & 4.7.7.2c.2,respectively,will Be Incorporated Into Apr 1986 Amend Application,Per NRC 860324 Request
ML20140F907
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/26/1986
From: Williams J
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1263, TAC-11311, TAC-11312, TAC-65069, NUDOCS 8604010219
Download: ML20140F907 (2)


Text

f 4

N TDLEDO

%mm EDISON JOE VVLDAMS. Jn Docket No. 50-346 sno m om - =

(419)249 2300 i'* *** "#3 License No. NPF-3 Serial No. 1263 March 26, 1986 Mr. John F. Stolz, Director PWR Project Directorate No. 6 Division of PWR Licensing B

  • United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz:

On January 30, 1985, Toledo Edison submitted an application (Serial No. 1113) for an amendment to Facility Operating License No. NPF-3, Appendix A, Technical Specifications, for the Davis-Besse Nuclear Power Station Unit No. 1. This application requested that Technical Specific-ation 3/4.7.7, Hydraulic Snubbers, be revised to include hydraulic and mechanical snubbers, and delete the snubber listing of Table 3.7-3 pursuant to Generic Letter 84-13.

In its review of this application, the Nuclear Regulatory Commission (NRC) Staff requested that Toledo Edison add a surveillance requirement requiring the performance of a post-transient inspection of all hydraulic and mechanical snubbers attached to sections of systems that have experienced an unexpected, potentially damaging transient. On January 22, 1986 Toledo Edison committed in Serial No. 1239 to provide euch a proposed license amendment.

Per a telephone discussion on March 24, 1986 with Mr. A. W. DeAgazio, the NRC Staff has requested that Toledo Edison also commit to the following changes:

- Delete Footnote No. 6 to proposed surveillance requirement 4.7.7.2b.

- Add "within the specified range" to the end of proposed surveillance requirement 4.7.7.2c.2.

This letter confirms Toledo Edison's acceptance of the addition of these two changes. Toledo Edison will incorporate these two changes with the transient event inspection surveillance requirement in a proposed license amendment scheduled for submittal in April, 1986.

, 00\

THE TOLEDO EDISON COVPANY FOISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652

\D 8604010219 860326 PDR ADOCK 05000346 p PDR

, 3' Docket No. 50-346 License No. NPF-3 Serial No. 1263 March 26, 1986 Page 2 Toledo Edison believes this letter provides all the information identified by the NRC Staff as necessary to complete their review and issue the license amendment requested under Serial No. 1113. Accordingly, Toledo Edison requests that this acendment be issued by the NRC by April 14, 1986.

Very truly yours, htL Y "W Qfh JW:DRW: den ec: DB-1 NRC Resident Inspector l