ML20137B338

From kanterella
Revision as of 11:00, 18 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-250/85-35 & 50-251/85-35 on 851021-25.No Violations or Deviations Noted
ML20137B338
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/15/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Williams J
FLORIDA POWER & LIGHT CO.
Shared Package
ML20137B343 List:
References
NUDOCS 8511260245
Download: ML20137B338 (2)


See also: IR 05000250/1985035

Text

.

SAFEGUARDS INFORMATION-

NOV 151985

Florida Power and Light Company

ATTN: Mr. J. W. Williams, Jr.

Group Vice President ca

"rggg

Nuclear Energy Department 'UMC?l E ."C'M

P. O. Box 14000

Juno Beach, FL 33408

Gentlemen:

SUBJECT: REPORT N05. 50-250/85-35 AND 50-251/85-35

On October 21 - 25, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-31 and DPR-41 for your Turkey Point facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and'

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-250/85-35

and 50-251/85-35

(Safeguards Information)

cc w/ encl:

C. M. Wethy, Vice President

Turkey Point Nuclear Plant

C. J. Baker, Plant Manager

Turkey Point Nuclear Plant

R. J. Acosta, Plant GA Superintendent

J. Arias, Jr. , Regulatory and Compliance [

Supervisor

bec w/ encl: (See page 2)

E!!CI.00"rP CONTAINS

S ArCF,U "1. If ri'ORVATICN

UPOM U.PA?.A'*ICI; Ti!!3

REA*"A88&i 8!s$$35o \FEGUARDS INFORMATION- em ze otemnou.ro.

O PUR

_ _ _ _ _ -

.. . _ . - - _ . . . - - . . . . _ _ - - . _ . _ _ . - - - _ .

. .

SAFEGUARDS INFORMATION;

! Florida Power and Light Company 2

' NOV 151985

1

1

'

bec w/ enc 1: '

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:  !

Document Control Desk, 016

NRC Resident Inspector

State of Florida

'

,

P

!

l t

!

l

1

i

i

i

$c ArYs f

    • ccll2;g;yf'A!!! you,o.
is;'o"

.  ;

RII *

RI! RII RJI

-

hvidsa uire ae aPStone

F 1(/W/85

S$od

\1(/6/85 M(7

14/ /85 14/f/85 1$/ /85  ;

SAFEGUARDS INFORMATION-

.