MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212M1911999-09-21021 September 1999 Discusses Exercise of Enforcement Discretion Re Apparent Violation Noted in Insp Repts 50-327/99-04 & 50-328/99-04 Associated with Implementation of Procedural Changes Which Resulted in Three Containment Penetrations Being Left Open ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20211B9661999-07-26026 July 1999 Informs That Sequoyah Nuclear Plant Sewage Treatment Plant, NPDES 0026450 Outfall 112,is in Standby Status.Flow Has Been Diverted from Sys Since Jan 1998 ML20210B2521999-07-14014 July 1999 Confirms 990712 Telcon Between J Smith of Licensee Staff & M Shannon of NRC Re semi-annual Mgt Meeting Schedule for 990820 in Atlanta,Ga to Discuss Recent Sequoyah Nuclear Plant Performance ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML20209E4071999-06-30030 June 1999 Forwards Insp Repts 50-327/99-03 & 50-328/99-03 on 990328- 0531.Violations Being Treated as Noncited Violations ML20196J8261999-06-28028 June 1999 Forwards Safety Evaluation Authorizing Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements for Certain Inservice Inspections at Sequoyah Nuclear Plant,Units 1 & 2 ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195E9311999-05-28028 May 1999 Informs of Planned Insp Activities for Licensee to Have Opportunity to Prepare for Insps & Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20207A5721999-05-20020 May 1999 Forwards Correction to Previously Issued Amend 163 to License DPR-79 Re SR 4.1.1.1.1.d Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20209J0391999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept, Radiological Impact Assessment Rept & Rev 41 to ODCM, for Period of Jan-Dec 1998 ML20206C6541999-04-23023 April 1999 Forwards Response to NRC 990127 RAI Re GL 96-05 for Sequoyah Nuclear Plant,Units 1 & 2 ML20206C0841999-04-23023 April 1999 Forwards Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted ML20206B9591999-04-20020 April 1999 Responds to 990417 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in Unit 1 TS 3.1.2.2,3.1.2.4 & 3.5.2 & Documents 990417 Telephone Conversation When NRC Orally Issued NOED ML20205S5891999-04-17017 April 1999 Documents Request for Discretionary Enforcement for Unit 1 TS LCOs 3.1.2.2,3.1.2.4 & 3.5.2 to Support Completion of Repairs & Testing for 1B-B Centrifugal Charging Pump (CCP) 1999-09-07
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20211B9661999-07-26026 July 1999 Informs That Sequoyah Nuclear Plant Sewage Treatment Plant, NPDES 0026450 Outfall 112,is in Standby Status.Flow Has Been Diverted from Sys Since Jan 1998 ML20205H8891999-03-30030 March 1999 Forwards 1998 Tennessee Multi-Sector General Permit Storm Water Monitoring Rept for Sqn. Comments Re Manner in Which Rept Was Prepared,Provided ML20205B6461999-03-22022 March 1999 Forwards Underground Storage Tank (Ust) Permanent Closure Rept, on20,500-gallon Security Backup DG Underground Storage Tank Sys Located at Sequoyah Nuclear Plant.Sys Closed in Place Between 990217 & 23.Synopsis,listed ML20198H5121998-12-17017 December 1998 Resubmits Notification of Pcb Activity Form and Corrected Pcb Transformer Registration Form ML20197J9511998-12-0808 December 1998 Forwards Pcb Transformer Registration Form for TVA Snp,Units 1 & 2 ML20154P5241998-10-13013 October 1998 Forwards NPDES Discharge Monitoring Repts (DMR) for Third Quarter 1998.Two Changes to DMR Listed ML20151Z6431998-09-15015 September 1998 Forwards Air Permit Applications for Snp,Units 1 & 2, Lubrication Oil Sys Vapor Extractor Vents ML20151T1191998-09-0101 September 1998 Forwards Revised Flow Diagram & EPA Form 3510-2C Re NPDES Permit TN0026450 - ERCW Discharge ML20248L6211998-06-0202 June 1998 Forwards Signed Page 90 of Form 2C,permit Renewal Application,Containing Required Info Re Addl Contract Laboratory & Other Info Requested.W/One Oversize Drawing ML20198T3811998-01-21021 January 1998 Requests Permission to Move Front Insulator Saw,Certificate of Operation 4150-30700804-07C,from Present Location to Same Location as Back Mod Insulator Saw,Certificate of Operation 4150-30700804-06C ML20199J1531998-01-15015 January 1998 Forwards General Info & Form 2C Info Required for Renewal of Sequoyah NPDES Permit TN002650,which Expires on 980831 ML20198N3761997-10-17017 October 1997 Forwards Written Rept on Snp 971011 Event That Caused Total Residual Chlorine Excursion.Rept Follows Up 971017 Telcon Re Subj Matter ML20149K7471997-07-23023 July 1997 Submits Cancellation of Scheduled Demolition of Four Aercw Cooling Towers to Begin 970728 & End on 970831 ML20141H2761997-07-11011 July 1997 Forwards Demolition/Removal Permit Application for SQN Re Scheduled Demolition of Four Aercw Cooling Towers from 970728 to 0831 ML20078N9191994-11-0707 November 1994 Discusses Investigation Re Capcitors Installed in HDR Converters ML20070D8311994-06-29029 June 1994 Responds to NRC Questions Posed During Telcons & Provides Current Westinghouse Position on Containment & Accumulator Initial Temp Assumptions for Large Break LOCA Analysis. Current Accumulator Water Temp Assumed in Analysis 90 F ML20062N6361994-01-11011 January 1994 Discusses Water Storage at Cowanesque Reservoir Power Uprate Evaluation ML20198Q2011992-11-30030 November 1992 Conforms to Conditions & Limitations Specified in 49CFR173.422 for Excepted Radioactive Matl Instruments & Articles ML20086D9651991-11-13013 November 1991 Advises That Util Intends to Bury Polychlorinated Biphenyl Sediments,Containing Low Levels of Radioactivity,Onsite.Util Will Pursue NRC Approval Per 10CFR20.302.Requests Concurrence Re Disposal of Matl ML20029A2121991-01-30030 January 1991 Forwards Revised Page 18 to Toxicity Rept on Diffuser Element Contained in Recently Submitted Discharge Monitoring Rept ML20043A0371990-05-0808 May 1990 Forwards Document Outlining TVA Evaluation of Options for Preventing Damage to Fish & Aquatic Life from Plant Discharges,In Response to 900117 Order ML20042E0861990-04-0202 April 1990 Responds to Issues Noted During 891204-06 Compliance Sampling Insp.Corrective Actions:River Level Monitoring Sys Inspected at Least Twice Per Month & Diffuser Pond Bubbler Gauge Sys Inspected Once Per Wk ML19353B0531989-11-20020 November 1989 Discusses NPDES Polychlorinated Biphenyls (Pcb) Cleanup Plan.Status of Reclamation Efforts for Low Vol Waste Treatment Pond Provided.Pcb Sampling Grid Analytical Results Encl ML20246L8511989-08-30030 August 1989 Forwards Predictive Section 316(a) Demonstration for Alternative Winter Thermal Discharge Limit for Sequoyah Nuclear Plant,Chickamauga Reservoir,Tn ML20246F8521989-08-24024 August 1989 Documents Sampling Plan Quantifying Polychlorinated Biphenyls Concentrations in Plant Low Vol Waste Treatment Pond Sediment.Attendance List for 890811 Meeting Encl ML20246H0711989-08-22022 August 1989 Requests Concurrence to Allow Discharge of Nonradioactive Wastes Into Moccasin Bend Sewage Treatment Plant Via Sewer Line Recently Installed Between Plant Site & Soddy-Daisy. List of Quantities & Generation Frequencies Encl ML20246H4391989-08-15015 August 1989 Responds to Re Need for Permit to Dispose of Scum & Sludge Removed from Sewage Treatment Plant.Util Needs Only to Submit Description of Monitoring Program Used to Ensure Sludge Not Radioactive.Technical Instruction Encl ML20245J8321989-08-0909 August 1989 Forwards Renewal Applications for Certificates of Operation 4150-20199997-01C & 4150-20199997-03C ML20247J2711989-07-21021 July 1989 Forwards Chickamauga Reservoir 1988 Fisheries Monitoring Cove Rotenone Results. Util Plans to Relocate Block Nets at Uppermost Cove (Sewee Creek) to Obtain More Representative Sample from Outside Reservoir Drawdown Zone ML20246L3341989-07-12012 July 1989 Forwards Response to 890427 Request for Addl Info Re 890301 Permit Applications for Existing Air Pollution Sources - Supplemental Data.W/One Oversize Drawing ML20247R3601989-06-0202 June 1989 Forwards Response to Re Deficiencies Noted in Performance Audit Insp Conducted on 890329-31.Corrective Actions:Listed Activities Conducted or Scheduled to Improve Diffuser Flow Measurement,Calibr & Recordkeeping ML20245L1441989-04-27027 April 1989 Notifies That Discharge Serial Number 001,sewage Treatment Plant Effluent,Eliminated Per 880429 Engineering Rept. Written Approval to Cease Submission of Discharge Monitoring & Monthly Operation Repts for Sys Requested ML20245F0751989-04-26026 April 1989 Notifies That Discharge Serial Numbers 111 & 113 Sewage Treatment Plant Effluents Eliminated,Per 880429 Rept. Requests Written Approval to Cease Submission of Discharge Monitoring Repts & Monthly Operation Repts for Sys ML20245D0671989-04-18018 April 1989 Advises That Permit Application for Installation of Gasoline & Diesel Fuel Oil Tanks Submitted to County on 860513.On 860702,certificate Issued.Tanks Never Installed.Util Requests That Permit Not Be Renewed ML20244D5991989-04-10010 April 1989 Submits Followup to Performance Audit Insp Conducted on 890329-31.Monitoring Discontinued After 1985 Since No Changes Occurred in Plant Operations That Suggest Some Alteration of Chickamauga Reservoir Water Quality ML20235V4201989-03-0101 March 1989 Forwards Permit Applications for Listed Existing Sources at Plant ML20206M2181988-11-23023 November 1988 Confirms 881117 Conversation on Actions Taken Re Detection of Polychlorinated Biphenyls in Low Vol Waste Treatment Pond.Suggestion to Treat Pond Contents W/Chemicals to Facilitate Colloidal Sedimentation Offers Promise ML20205G5561988-10-25025 October 1988 Forwards Addl Info to Support Renewal of NPDES Permit TN0026450.Discharges Sampled During Aug,But Because of Intake Water Quality Problems,Reliable Data on Total Residual Chlorine Not Obtained ML20151V3661988-08-16016 August 1988 Confirms 880804 Telcon Between Util & Tennessee Div of Water Pollution Control Re Chickamauga Reservoir Temps.Telcon Informs That River Temps Upstream & Downstream Periodically Exceeded 86.9 Degrees F on 880801,02 & 03 ML20207E1091988-08-10010 August 1988 Comments on Draft State Permit 88-036 for Sewage Hold & Haul Operation at Plant,Per 880719 Request.Rhea County Should Be Changed to Hamilton County ML20196L3101988-06-30030 June 1988 Forwards Chickamauga Reservoir 1987 Fisheries Monitoring Cove Rotenone Results. Recommends That Sampling in Uppermost Cove Be Discontinued Because Data May Not Be Representative of Reservoir Fish Populations ML20150A8211988-06-29029 June 1988 Responds to Re Violations Noted in Insp Repts. Corrective Actions:Sewage Being Routinely Pumped from Sys & Hauled to Chattanooga Regional Sewage Treatment Facility to Minimize Potential for Noncompliances ML20155G7761988-06-13013 June 1988 Informs That Licensee No Longer Considering Relocating Fish from Diffuser Pond to Chickamauga Reservoir But Plans to Dispose Fish by Burial Onsite.Licensee Will Request Approval of Burial from Tennessee Div of Solid Waste Mgt ML20154P2701988-05-25025 May 1988 Notifies of Util Intent to Use Herbicides to Control Aquatic Weed Growth in Diffuser Pond,Yard Pond & Low Vol Waste Treatment Pond at Facility to Control Growth of Aquatic Weeds.Pertinent Info on Herbicides Encl ML20148L6921988-03-30030 March 1988 Notifies of Proposed Use of Sodium Bromide in Addition to Sodium Hypochlorite in ERCW Sys to Control Biofouling.Use of Bromide Reduces Total Residual Chlorine & Aids in Compliance W/Npdes Permit.Info on Products Being Considered Encl ML20235R6961987-10-0101 October 1987 Forwards EPA Forms 3510-1 & 3510-2C for Renewal of NPDES Permit TN0026450,including Description of Boron Sources & Discharge Points,List of Chemicals Added to Each Discharge & Description of Program to Control Microbiological Corrosion ML20235H9211987-07-0808 July 1987 Follows Up Re Investigation of Plant Impact on Dissolved Levels in Chickamauga Reservoir.Rhodamine WT Dye Study Conducted on 870615-16 Resulted in Dye Concentrations of Less than 10 Ppb at All Known Intakes in Survey Reaches ML20214T7761987-06-0202 June 1987 Requests Approval to Use Rhodamine WT Dye in Field Study in Chickamauga Reservoir in Vicinity of Underwater Dam (TRM 483.76) on 870615-16.Test Time Will Be Verbally Confirmed at Least 3 Days Prior to Actual Dye Injection ML20205Q5991987-03-31031 March 1987 Forwards Aquatic Environ Conditions in Chickamauga Reservoir During Operation of Sequoyah Nuclear Plant - Sixth Annual Rept (1986). Based on Cove Rotenone Sampling Since 1970,operation of Facility Had No Adverse Effect on Fish ML20209D3501986-08-29029 August 1986 Forwards Aquatic Environ Conditions in Chickamauga Reservoir During Operation of Sequoyah Nuclear Plant,Fifth Annual Rept (1985) & Apps.Jul 1985 Plan Alterations Decreased Phytoplankton & 200 Plankton Densities 1999-07-26
[Table view] |
Text
-
r 01/20/95 09:28 C1 618 244 6641 NUTIERM (d oot l ..
Nutherm&
INTERNA 7DVALlhG 501 SOUTH ELEVENTH STREET /MT. VERNON, ILLIN0IS 62864/(618) 244-6000/ FAX (618) 244-6641 November 7,1994 Tennessee Valley Authority Browns FerTy Nuclear Station P.O. Box 2000 Decatur, AL 35602-2000 Attention: Ms. Claudia Dyar
Subject:
Capacitors Installed in HDR Converters
Dear Ms. Dyar:
Nutherm is in the process of investigating the aforemention subject. In the intrim the following is in regard to the question about the capacitors in the 3KVA inverters purchased under your P.O. No.
87NLF839263. HDR's service Bulletin No. 009 addresses 3300 MFD capacitors (P.N. 0133235) which are present in your units (circuit designation C1, CS).
A visual inspection needs to be made to determine if the units contain these capacitors with date codes between 8630 and 8850. The date codes are located on the last line of markings on the capacitors. Other signs to look for are bulging sides on the caps or leakage from the weep holes. If the capacitors are suspect, a test can be performed to check for low capacitance. Depress and release the precharge button and note the time it takes for the bleeder resistors to discharge the cap bank after the button is released.
The voltage should bleed off slowly. If a rapid decrease in voltage is noted the capacitors should be replaced.
The most common failure caused by one of these capacitors being faulty is blowing one of the DC input fuses (FUI, FU2).
After your completion of the inspection please contact Nutherm with the results. If you have any further questions please do not hesitate to call me at (618) 244-6000.
Sincerely, NUTIIERM INTERNATIONAL,.1NC.
M4cw .
Lawrence Patterson l Director of Compliance 9502160190 941107 PDR ADOCK 05000327 .
P PDR LP/kh Post-it' brand fax transtruttal memo 7671 l* of pion * /
FL:CSTVA '" b~ '
bept.'
WA ' ' A&A7m f,/
Pnone e ATTACintENT 2 QA-1-95-1003 m, a,e y
.cge 1 of 3
-7
01/20/95 09:28 C1 618 244 6641 NUTHERM @ 005 Nutherm&
INTERNATIOVAL.IAC 501 SOUTH ELEVENTH STREET /MT. VERNON, iltlNOIS 62864/(618) 244-6000/ FAX (618) 244-6641 November 10, 1994 QA-11-94-985 Bechtel power Corporation 9801 Washingtonian Boulevard Gaithersburg, MD 20878-5356 Attention: V. R. Marathe, Electrical control System Engineering Chief subject: capacitors Installed In HDR Converters
Dear Mr. Marathe:
Nutherm is in the process of investigating the aforementioned subject. In the interim the following is in regard to the question about the capaciters in the SKVA inverters purchased under your p.O. No. 18691-E-554. HDR's Service Bul1etin No. 009, Rev. 1.1, dated 2/19/92 addresses 3300 MFD capacitors (P.N. 0133235) which may be present in your units.
A visual inspection needs to be made to determine if the units contain these capacitors with date codes between 8630 and 8850. ,
The date codes are located on the last line of markings on the l capacitors. Other signs to look for are bulging sides on the caps or leakage from the weep holes. If the capacitors are suspect, a test can be performed to check for low capacitance. Depress and releace the precharge button and note the time it takes for the ]
bleeder resistors to discharge the cap bank after the button is released. The voltage should bleed off slowly. If a rapid j decreace in voltage is noted, the capacitors should be replaced.
The most common failure caused by one of these capacitors being faulty is blowing one of the DC input fuses (FUl, FU2).
page 1 of 2 ATTACHMENT 2 QA-1-95-1003 Page 2 of 3
- 01/30/95' 09:28 31 618 244 6641 NUTHERM @ 006 1
7 Bechtel Power Corporation Attn: V. R. Marathe QA-ll-94-985 Page 2 of 2
'After your completion of the inspection, please contact Nutherm with the results. If you have any further questions please contact me at (618) 244-6000.
Sincerely, NUTHERM INTERNATIONAL, INC.
Pran Starr Manager Quality Assurance cc: Connecticut Yankee Power Station Northeast Utilities Attn: QA Mgr.
362 Injun Hollow Road East Hampton, CT 06424-3093 BPC-2552 QA Fi1e BPC-25$2 Job File i
FS:fs ATTACHMENT 2 QA-1-95-1003 Page 3 of 3
01/20/95 09:27 C1 618 244 6641 NUTHERM Q]001
~
Post 4t* Fs Note 7671 D;"1/DjM lIaYs k h D
MR ""'T% M SM
"** Ormam tTg. " %me
- %)M Sl-GSSC5 ""'lCdN;1%-Mco F"* Bol WL-ms1 '"" ( cA w-M MU[N6fM IN7ERNAnOVAL.IAC 501 SOUTH ELEVENTH STREET /MT. VERNON, ILLINOIS 62864/(618) 244-6000ns;'(618) 244 6641 PART 21 INITIAL NOTIFICATION QA-1-95-1003 l
January 20, 1995 ;
Page 1 of 2 i
i I. Fran Starr, Manager - Quality Assurance Nutherm International, Inc.
501 South lith. Street Mt. Vernon, IL 62864 II. 3300 MFD capacitors, P.N. 0133235, contained in 3KVA and SKVA I HDR Inverters supplied to Tennessee Valley- Authority (TVA) l Browns Ferry Nuclear Plant and Northeast Utilities Connecticut I Yankee Power Station via Bechtel Power Corporation.
Installation / system locations are unknown.
III. The 3300 MFD capacitors, P.N. 0133235, were manufactured by Mepco/Centralab and are contained in the HDR Inverters. The Inverters were qualified and supplied by Nutherm International, Inc., 501 South lith. Street, Mt. Vernon, IL I
IV. The def ecti ve repacitors , which were manuf actured between the 30th week of 1986 and the 50th week of 1988, exhibit inw or no capacitance when failed. The most common failure caused by one of these capacitors being f aulty is blowing one of the DC input fuses (FU1, FU2); thereby, rendering the HDR Inverter from performing its design function.
V. Nutherm was notified by TVA on 10/21/94 and copy of HDR Service Bulletin, Rev. 1.1, dated 2/19/92 was f axed by TVA to Nutherm on 10/21/94 (Attachment 1).
VI. The HDR Inverters that may contain the defective capacitors were supplied by Nutherm to Tennessee Valley Authority (TVA) and Bechtel Power Corporation as follows:
(1) TVA - Browns Ferry Nuclear Plant , . Purchase Order No:
87NLF839163, Item No: 1, Quantity two (2), 3KVA Inverters, Nutherm F:ef erence No: TVA-2649 (2) Bechtel Power - Northeast Utilities Connecticut Yankee Power Station, Purchase Order No: 18691-E-554, Item 2.1, Quantity two (2), 5KVA Inverters, Nutherm Reference No: BPC-2552
c
~
01/30/95 09:37 31 618 244 6641 NUTHERM @ 002 I
v c .
I i
i PART 21 INITIAL NOTIFICATION QA-1-95-1003 ;
i January 20, 1995
.i Page 2 of 2 )
l VII. Corrective action included a request to TVA and }
Bechtel/Northeact Utilities to perform a visual inspection j and contact Nutherm with the results in order to determine ;
if def ective capacitors were installed in the HDR Inverters !
(Attachment 2).
VIII. Nutherm re.:ommended that TVA and Northeast Utilities inspect i the installed capacitors and if the inspection disclosed the installed capacitors to be suspect, replace the suspect i capacitors in order to assure that they do not affect the operation of the facility to which they were supplied. ;
r i
01/20/95 09:27 CA 618 244 6641 NUTHER3! @ 003
, r - -
\
- dc t-ga-1w4 ot;: 2 r FNO1 TUR PROCLFErCNT l
. < TO 96182446641-569368 P.002/622 o
IIE!al " ==
S sA )
BULL.ETIN # 009 REVISION # 1.1 PACE g 1 REV. DATE: 2/19/92 SERvTCP BULW T N DATE: JANUARY 11. 15'91 CEEERATED SY: FIELD SERVICE APPROVED BY: DON IMLAy .
SUrJECT: DC CAPACITOR BANK MODELS AFFECTED:
ALL HICH DC UNITS (MFR'D BETVEEN JUNE 1986 AND JUNE 1989) ,
IMPLEMENIATION DATE: DECEMBER 27, 1990 IEF11 MENTATION LEVEL- AS NECESSARY DC capacitors manufactured by Hepco/Centralab (3300 MFD 350V.jP.Jf.,.0133235P" i between
' defect that the 30th week of 1986, and the 50th veek of 1968, have 'been'* shoving a leak' .
results in lov er no capacitance when failed. They may or may not These grey jacketed caps display the date code en the last line of u.arkings on the cap. (Ex: 8646 - 46th week of,1986). To check for lov capacicance. noce' the time it takes for the biceder resistors to discharge the cap bank after. the precharge button is released.
Contact the factory for. assistance if the DC cap bank contains the aboye sentioned capacitors. HDR's phone number is: 6M.27M370D or fax number: '614-771-7219.
gg_ y _ g DISTRIBUTION: MANUTACTURING. FINAL TEST. FIELD SERVICE. 3RD PARTY SER
, c, ,_ _.
.? n ' l' d n..
ATTACHMENT 1 QA-1-95-1003 Page 1 of 1
- - - -