ML20078N919

From kanterella
Jump to navigation Jump to search
Discusses Investigation Re Capcitors Installed in HDR Converters
ML20078N919
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/07/1994
From: Patterson L
NUTHERM INTERNATIONAL, INC.
To: Dyar C
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 9502160190
Download: ML20078N919 (6)


Text

-

r 01/20/95 09:28 C1 618 244 6641 NUTIERM (d oot l ..

Nutherm&

INTERNA 7DVALlhG 501 SOUTH ELEVENTH STREET /MT. VERNON, ILLIN0IS 62864/(618) 244-6000/ FAX (618) 244-6641 November 7,1994 Tennessee Valley Authority Browns FerTy Nuclear Station P.O. Box 2000 Decatur, AL 35602-2000 Attention: Ms. Claudia Dyar

Subject:

Capacitors Installed in HDR Converters

Dear Ms. Dyar:

Nutherm is in the process of investigating the aforemention subject. In the intrim the following is in regard to the question about the capacitors in the 3KVA inverters purchased under your P.O. No.

87NLF839263. HDR's service Bulletin No. 009 addresses 3300 MFD capacitors (P.N. 0133235) which are present in your units (circuit designation C1, CS).

A visual inspection needs to be made to determine if the units contain these capacitors with date codes between 8630 and 8850. The date codes are located on the last line of markings on the capacitors. Other signs to look for are bulging sides on the caps or leakage from the weep holes. If the capacitors are suspect, a test can be performed to check for low capacitance. Depress and release the precharge button and note the time it takes for the bleeder resistors to discharge the cap bank after the button is released.

The voltage should bleed off slowly. If a rapid decrease in voltage is noted the capacitors should be replaced.

The most common failure caused by one of these capacitors being faulty is blowing one of the DC input fuses (FUI, FU2).

After your completion of the inspection please contact Nutherm with the results. If you have any further questions please do not hesitate to call me at (618) 244-6000.

Sincerely, NUTIIERM INTERNATIONAL,.1NC.

M4cw .

Lawrence Patterson l Director of Compliance 9502160190 941107 PDR ADOCK 05000327 .

P PDR LP/kh Post-it' brand fax transtruttal memo 7671 l* of pion * /

FL:CSTVA '" b~ '

bept.'

WA ' ' A&A7m f,/

Pnone e ATTACintENT 2 QA-1-95-1003 m, a,e y

.cge 1 of 3

-7

01/20/95 09:28 C1 618 244 6641 NUTHERM @ 005 Nutherm&

INTERNATIOVAL.IAC 501 SOUTH ELEVENTH STREET /MT. VERNON, iltlNOIS 62864/(618) 244-6000/ FAX (618) 244-6641 November 10, 1994 QA-11-94-985 Bechtel power Corporation 9801 Washingtonian Boulevard Gaithersburg, MD 20878-5356 Attention: V. R. Marathe, Electrical control System Engineering Chief subject: capacitors Installed In HDR Converters

Dear Mr. Marathe:

Nutherm is in the process of investigating the aforementioned subject. In the interim the following is in regard to the question about the capaciters in the SKVA inverters purchased under your p.O. No. 18691-E-554. HDR's Service Bul1etin No. 009, Rev. 1.1, dated 2/19/92 addresses 3300 MFD capacitors (P.N. 0133235) which may be present in your units.

A visual inspection needs to be made to determine if the units contain these capacitors with date codes between 8630 and 8850. ,

The date codes are located on the last line of markings on the l capacitors. Other signs to look for are bulging sides on the caps or leakage from the weep holes. If the capacitors are suspect, a test can be performed to check for low capacitance. Depress and releace the precharge button and note the time it takes for the ]

bleeder resistors to discharge the cap bank after the button is released. The voltage should bleed off slowly. If a rapid j decreace in voltage is noted, the capacitors should be replaced.

The most common failure caused by one of these capacitors being faulty is blowing one of the DC input fuses (FUl, FU2).

page 1 of 2 ATTACHMENT 2 QA-1-95-1003 Page 2 of 3

- 01/30/95' 09:28 31 618 244 6641 NUTHERM @ 006 1

7 Bechtel Power Corporation Attn: V. R. Marathe QA-ll-94-985 Page 2 of 2

'After your completion of the inspection, please contact Nutherm with the results. If you have any further questions please contact me at (618) 244-6000.

Sincerely, NUTHERM INTERNATIONAL, INC.

Pran Starr Manager Quality Assurance cc: Connecticut Yankee Power Station Northeast Utilities Attn: QA Mgr.

362 Injun Hollow Road East Hampton, CT 06424-3093 BPC-2552 QA Fi1e BPC-25$2 Job File i

FS:fs ATTACHMENT 2 QA-1-95-1003 Page 3 of 3

01/20/95 09:27 C1 618 244 6641 NUTHERM Q]001

~

Post 4t* Fs Note 7671 D;"1/DjM lIaYs k h D

MR ""'T% M SM

"** Ormam tTg. " %me

  • %)M Sl-GSSC5 ""'lCdN;1%-Mco F"* Bol WL-ms1 '"" ( cA w-M MU[N6fM IN7ERNAnOVAL.IAC 501 SOUTH ELEVENTH STREET /MT. VERNON, ILLINOIS 62864/(618) 244-6000ns;'(618) 244 6641 PART 21 INITIAL NOTIFICATION QA-1-95-1003 l

January 20, 1995  ;

Page 1 of 2 i

i I. Fran Starr, Manager - Quality Assurance Nutherm International, Inc.

501 South lith. Street Mt. Vernon, IL 62864 II. 3300 MFD capacitors, P.N. 0133235, contained in 3KVA and SKVA I HDR Inverters supplied to Tennessee Valley- Authority (TVA) l Browns Ferry Nuclear Plant and Northeast Utilities Connecticut I Yankee Power Station via Bechtel Power Corporation.

Installation / system locations are unknown.

III. The 3300 MFD capacitors, P.N. 0133235, were manufactured by Mepco/Centralab and are contained in the HDR Inverters. The Inverters were qualified and supplied by Nutherm International, Inc., 501 South lith. Street, Mt. Vernon, IL I

IV. The def ecti ve repacitors , which were manuf actured between the 30th week of 1986 and the 50th week of 1988, exhibit inw or no capacitance when failed. The most common failure caused by one of these capacitors being f aulty is blowing one of the DC input fuses (FU1, FU2); thereby, rendering the HDR Inverter from performing its design function.

V. Nutherm was notified by TVA on 10/21/94 and copy of HDR Service Bulletin, Rev. 1.1, dated 2/19/92 was f axed by TVA to Nutherm on 10/21/94 (Attachment 1).

VI. The HDR Inverters that may contain the defective capacitors were supplied by Nutherm to Tennessee Valley Authority (TVA) and Bechtel Power Corporation as follows:

(1) TVA - Browns Ferry Nuclear Plant , . Purchase Order No:

87NLF839163, Item No: 1, Quantity two (2), 3KVA Inverters, Nutherm F:ef erence No: TVA-2649 (2) Bechtel Power - Northeast Utilities Connecticut Yankee Power Station, Purchase Order No: 18691-E-554, Item 2.1, Quantity two (2), 5KVA Inverters, Nutherm Reference No: BPC-2552

c

~

01/30/95 09:37 31 618 244 6641 NUTHERM @ 002 I

  • J l

v c .

I i

i PART 21 INITIAL NOTIFICATION QA-1-95-1003  ;

i January 20, 1995

.i Page 2 of 2 )

l VII. Corrective action included a request to TVA and }

Bechtel/Northeact Utilities to perform a visual inspection j and contact Nutherm with the results in order to determine  ;

if def ective capacitors were installed in the HDR Inverters  !

(Attachment 2).

VIII. Nutherm re.:ommended that TVA and Northeast Utilities inspect i the installed capacitors and if the inspection disclosed the installed capacitors to be suspect, replace the suspect i capacitors in order to assure that they do not affect the operation of the facility to which they were supplied.  ;

r i

01/20/95 09:27 CA 618 244 6641 NUTHER3! @ 003

, r - -

\

  • dc t-ga-1w4 ot;: 2 r FNO1 TUR PROCLFErCNT l

. < TO 96182446641-569368 P.002/622 o

IIE!al " ==

S sA )

BULL.ETIN # 009 REVISION # 1.1 PACE g 1 REV. DATE: 2/19/92 SERvTCP BULW T N DATE: JANUARY 11. 15'91 CEEERATED SY: FIELD SERVICE APPROVED BY: DON IMLAy .

SUrJECT: DC CAPACITOR BANK MODELS AFFECTED:

ALL HICH DC UNITS (MFR'D BETVEEN JUNE 1986 AND JUNE 1989) ,

IMPLEMENIATION DATE: DECEMBER 27, 1990 IEF11 MENTATION LEVEL- AS NECESSARY DC capacitors manufactured by Hepco/Centralab (3300 MFD 350V.jP.Jf.,.0133235P" i between

' defect that the 30th week of 1986, and the 50th veek of 1968, have 'been'* shoving a leak' .

results in lov er no capacitance when failed. They may or may not These grey jacketed caps display the date code en the last line of u.arkings on the cap. (Ex: 8646 - 46th week of,1986). To check for lov capacicance. noce' the time it takes for the biceder resistors to discharge the cap bank after. the precharge button is released.

Contact the factory for. assistance if the DC cap bank contains the aboye sentioned capacitors. HDR's phone number is: 6M.27M370D or fax number: '614-771-7219.

gg_ y _ g DISTRIBUTION: MANUTACTURING. FINAL TEST. FIELD SERVICE. 3RD PARTY SER

, c, ,_ _.

.? n ' l' d n..

ATTACHMENT 1 QA-1-95-1003 Page 1 of 1

- - - -