Advises That Mods to Inadequate Fire Barriers Between Electrical Penetration Rooms in Auxiliary Bldg,Described in 830928 Ltr Re ROs 369/83-72 & 370/83-44,rescheduled for Completion by 840701
ML20079K016
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/04/1984
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-369-83-72, RO-370-83-44, NUDOCS 8401240480
Download: ML20079K016 (1)


Text

DUKE POWER GOMPANY I*.O. HOK Mll80 CIIAltLOTTE, N.C. 28242 IIAL B. TIICKEN n C renernoxe (7o4) ara-4sai

_ _=... _=,_

vir ==

g j g g JSnk,ry #, 1984 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street NW, Suite 2900 Atlanta, Georgia 30303

Subject:

McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369 and 50-370 LER/RO-369/83-72 and 370/83-44 Facility Operating License No. NPF-9 Section 2.G Report -

Inadequate Fire Barrier

Dear Mr. O'Reilly:

My letter of September 28, 1983 submitted Facility Operating License No. NPF-9 Section 2.G report - Inadequate Fire Barrier, along with Reportable Occurrence Reports R0-369/83-72 (Unit 1) and 370/83-44 (Unit 2). These reports concerned inadequate fire barriers between electrical penetration rooms located in the Auxiliary Building. As part of the corrective actions given in the reports it was stated that the compressed cork would be removed and an approved three-hour fire rated material installed in the void on both Units 1 and 2 by March 1, 1984 (the date that compliance with Appendix R is required on Unit 2). However, due to concern that sufficient manpower will not be available to complete the modification and conduct outage work scheduled during the next two months (Unit 2 is currently in the middle of a four week maintenance outage, and Unit 1 first refueling shutdown is planned for mid-February), the work on Unit I will now be completed by July 1, 1984. The completion date for the work on Unit 2 uill remain March 1, 1984 in compliance with' Unit 2 License NPF-17, Condition 2.C.7.

Verification of operable fire detection instrumentation and hourly fire watch patrols will continue to be conducted during the extended period for completion of work on Unit 1, minimizing the potential for fire propagation and ensuring that the health and safety of the public are not compromised.

Very truly yours, S #

lfg Hal B. Tucker PBN:jfw cc: Document Control Desk Mr. W. T. Orders U. S. Nuclear Regulatory Commission NRC Resident Inspector Washington, D. C. 20555 McGuire Nuclear Station Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 yp P401240480 840104 7/22 s

PDR ADOCK 05000369 s PDR f6