ML20205P899

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2
ML20205P899
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/31/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20205P893 List:
References
NUDOCS 9904210024
Download: ML20205P899 (6)


Text

-

Operating Data Report Docket No.

50-369 Date April 12.1999 Completed By Rocer Williams Telephone 7(4 382-5346 Operatine Status

1. Unit Name:

McGuire 1

2. Reponing Period:

March 1,1999 - March 31,1999

3. Licensed Thermal Power (MWt):

3411 Notes:

  • Nameplate
4. Nameplate Rating (Gross MWe):

1305

  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe):

1180 calculated as 1450.000

6. Maximum Dependable Capacity (Gross MWe):

1171 MVA *.90 power

7. Maximum Dependable Capacity (Net MWe):

1100 factor per Page 111, 0.

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

{

10. Reason for Restrictions,If any:

i l

1 This Month YTD Cumulative

11. Hours in Reporting Period 744.0 2160.0 151920.0
12. Number of Hours Reactor was Critical 744.0 2160.0 112965.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 j
14. Hours Generator On-Line 744.0 2160.0 111805.7 l

1

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2532693 7352971 355691254
17. Gross Electrical Energy Generated (MWH) 891527 2589882 122344723
18. Net Electrical Energy Generated (MWH) 860506 2501474 117048409
19. Unit Service Factor 100.0 100.0 73.6
20. Unit Availability Factor 100.0 100.0 73.6 I
21. Unit Capacity Factor (Using MDC Net) 105.1 105.3 67.5
22. Unit Capacity Factor (Using DER Net) 98.0 98.1 65.3
22. Unit Forced Outage Rate 0.0 0.0 11.3
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each) i
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 9904210024 990413 ~

PDR ADOCK 05000369 3A - 4H b99 R

PDR ua

1 9

r 9

/

o 3

1 1

/4 e

g C

a 3

P e

c m

n a

e r

r c

r S

u

/

R ip n c

o e

rT i ta t

u l

n a n e

ui v

n n t

e a

r o

P MC o

t 2 4 no i

m tcA ar e

c v

S i/p )n itc ri e

a Tl rr p

o c

x C

iaE d

t l

d o a m (r n

h u a

t n o e e a ut t

h e

MMAO s

u a

)

C 2

(

1 35 9

tr 9

o 9

d p 1

es e S

nR o.

N h

e N

t c

c n W

L e i

ra v

O M

E D

T H

h U

T f X t

N o/

n n

H O

i d R o

o o n M

t S

a M

h w n

t i

T e o e

T Md h

m IN R

t a

)

u t

x U

O 2 h r

E P

( S o

E f

es

)

R n

in ec a

l n

s i

o e

L p

/

x s

g g

E ae a

i e oi n

(

)

R r n t

n u

v i

r a

)

a O

irl 1

r t

T aE p

(

r x

r r

ts oE oi t

(

t n a r n

a o s r i r e t

u o

e meh i r pd pt ar o N

uH OA OO D

EFGH s

9 m 6 d

9 a

4 d

le 9

i 3

e u l

1 1

li5 e c d r

e

. W2 p o r

3 e

9 i

1 8

yF h

)n 3

T c

i 6

u r

- S a

l e

3 G

i r

c 4

0 p

o 0 lp c

F -

5 MAR 7

S x

n E

t o

(

s i

e t

OEEYE e T c

r NMTBN ia e

i A

O e

lu r tr o

s TA DD H a

f e

r t

EN E P D

c t

y K T T E en nagr o

CI E L n n n mei a t

ON L E y

o t

el l

D U L T a

a ip r

s n u u uiaf g P

m e q e e O

N m

R E MRR M

o

)

u 1

ABCD C

S

(

c

?

l l

I MONTHLY REFUELING INFORMATION REOUEST l

1.

Facility name:

McGuire Unit 1 l

2.

Scheduled next refueling shutdown: Senteraber 1999 i

3.

Scheduled restart following refueling: October 1999 l

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee l

regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 19]

(b) in the spent fuel pool: 321 8.

Present licensed fuel pool capacity: 1463.

Size of requested or planned increase:.-,

9.

Projected date oflast refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: Aoril 13.1999 i

l Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

l l

w

1 l

Operating Data Report Docket No.

50-370 Date April 12.1999 Completed By Rocer Williams Telephone 704-382-5346 Operating Status

1. Unit Name:

McGuire 2

2. Reporting Period:

March 1,1999 - March 31,1999

3. Licensed Thermal Power (MWt):

3411 Notes:

  • Nameplate
4. Nameplate Rating (Gross MWe):

1305

  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe):

1180 calculated as 1450.000

6. Maximum Dependable Capacity (Gross MWe):

1171 MVA *.90 power

7. Maximum Dependable Capacity (Net MWe);

1100 factor per Page iii, 0.

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions,if any:

'Ihis Month YTD Cumulative i1. Hours in Reporting Period 744.0 2160.0 132216.0

12. Number of Hours Reactor was Critical 288.7 1704.7 105077.S l
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 i
14. Hours Generator On-Line 286.5 1702.5 103908.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 797901 5515983 342375041
17. Gross Electrical Energy Generated (MWH) 282568 1946294 119262363
18. Net Electrical Energy Generated (MWH) 266756 1872332 114414475
19. Unit Service Factor 38.5 78.8 78.6
20. Unit Availability Factor 38.5 78.8 78.6
21. Unit Capacity Factor (Using MDC Net) 32.6 78.8 76.2
22. Unit Capacity Factor (Using DER Net) 30.4 73.5 73.3
23. Unit Forced Outage Rate 0.0 0.0 6.8
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3 A - 4/12/9)

i n

f e

r o

k 3

1 a

1 t

/4 s

e a

g w

c a

3 P

t d i e n mu u e D.

ser t

2 e

i 3 m

n cn u 4 a

1 e

e r

r E

h t

c r

t a

S u

/

c G

4 9 e

A 0 9 ip n R

T 2

h.

T io 7 /

r t

1 t

a U

n l

u t

1 n

t

/

e O

a 3 o a n u

v 9 0 m i

t n n e

G 9 n e a

/

o rP N

2 oh MC t

I 0 e o

L

/

gf t

E 3 a o 2 4 n

0 t

r o

U u e n

i F

od tc E

O.

gin m

A R

e i a a

n r

e 2

gl m

c v

a e S

1 e

i t

u r

/)

c E

uf t

pn o e e i ri e

L r h a

Tl r

C g2 t

r n

p o

i 1

e iaE c

C Y

le l

t l

g x

C e a d

t u c u d

o a m (r n

F-y o h u fer c t

n oe a

O f-g e a ut t h e

2 n

D o i MMAO s

1 u

a N

C E

le d le

)

n u 2

e f

(

1 35 cy e

9 tr c n r 9

o f-ig e 9

d p

o e h 1

e S

s e.

d n

t b

n R o n oi N

h e

N e

t t

c c n r a s

W L e o e i

r w w a

v t

O M

E n

t oi D

wp n o

T H

d g u t

n e U

T f X s

N o /

a i H.

i s

n H

O d R o a c e o

r e o n o c g a

S t

M h

w t

e a in t

T e o e d 1

t T

Md u n ou m

IN R

t d a a

)

u U

O 2 h r g g x

e e i E

n P

(

S wb l

e E

oi e s

)

t u

n n

R p n f u e e

i r

c a

n 2

L lp e

i o

5 H.

1

/

x s

8 g

E a

y e

n

(

e C

e l

)

l R

e g c i e r n n

t oi

)

a a y i v r a c

a i r l mtu f-T aE p 1

r t

(

o ix o

r x

r r

t oE o g s

d oi 2

r n n a (r t

5 pi n

t n

a o s e

p le r ir e t

a u e e me h r

7 i u 5

f h pd pt ar o 4

a e t

t OA OO uH r

D g

n 2

i n

g E FGH i

1 e

s d e b 9

m 6 d

lolc o 9

a 4 d

l h y t

e 9

i 3

e u l

2 1

i 5

e c d t

f-2 l

h c9 r

e

. W 2 p o e n

0 i

3 o2 1

8 yF h S

o r

)

c 2

n 7

u r

T

- S md l

e 3

i 3

G t

n a

i a

r g

1 F -

e e lp c

p o 0 h o x

n 0

9 5 MAR _7 S

t 9

t E

/

t o

n n 2

(

s a

e i

OEEYE g w/

e 1

t T

c NMTBN

/

t i o s

9 e o 3 u r t

r ir 9

b d 0 A

O e

l TA DD H a

it t

2 s e a

e EN E P D

1 n a n f

e r

/

u oi c

K T T E 0

e f-agr n n y

3 c

l t

CI E L e

o ef nnt ynh o

n mel a ON L E i

t o

el D U L T a

a ip t

r n u u s

u iaf g P

m e q e e M

o O

N m

R E MRR 1

)

u 1

C S

ABCD

(

~

  • MONTHLY REFUELING INFORM ATION REOUEST 1.

Facility name:

McGuire Unit 2 2.

Scheduled next refueling shutdown: Currentiv Refueling 3.

Scheduled restart following refueling: Aoril 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

I If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 1121 8.

Present licensed fuel pool capacity: 14fl Size of requested or planned increase: =

9.

Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: April 13.1999 Name of

Contact:

R. A. Williams Phone: (7041-382-5346