Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2
ML20210S237
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 07/31/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20210S226 List:
References
NUDOCS 9908180046
Download: ML20210S237 (6)


Text

r Operating Data Report Docket No. 50-369 l Date Aucust 12.1999 Completed By Rocer Williams Telephone 704-382-5346 ODeratine Status

1. Unit Name: McGuire 1
2. Reporting Period: July 1,1999-July 31,1999
3. Licensed Thermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 114/. MVA * .90 power
7. Maimum Dependable Capacity (Net MWe): 1100 factor per Page 111,
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

REG M .

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions,If any:

! This Month YTD Cumulative l 11. Hours in Reporting Period 744.0 5087.0 154847.0

12. Number of Hours Reactor was Critical 744.0 5087.0 115892.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 5087.0 114732.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2533899 52158351 400496634
17. Gross Electrical Energy Generated (MWH) 867349 6049759 125804600
18. Net Electrical Energy Generated (MWH) 835730 5837414 120384349
19. Unit Service Factor 100.0 100.0 ,

74.1

20. Unit Availability Factor 100.0 100.0 74.1
21. Unit Capacity Factor (Using MDC Net) 102.1 104.3 68.2
22. Unit Capacity Factor (Using DER Net) 95.2 97.2 65.9
23. Unit Forced Outage Rate 0.0 0.0 11.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each) i 1

1 1

25. If Shutdown At End Of Report Period, Estimated Date of Startup l 26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Ccmmercial Operation 9908190046 990812 PDR ADOCK 05000369 3A 8/12/99 R PDR L

MONTHLY REFUELING INFORMATION REOUEST I

1. Facility name: McGuire Unit 1
2. Scheduled next refueling shutdown: Scotember 1999
3. Scheduled restart following refueling: October 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If ng Ms reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or l performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: ,191 (b) in the spent fuel pool: 311 l 8. Present licensed fuel pool capacity: 1451 4

Size of requested or planned increase: ::--

9. Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: Aucust 12.1999 ,

I Name of

Contact:

R. A. Williams Phone: (700 -382-5346

L .

f

. o 1

e g

~

a P

e c m n a r

e r c r S u 'p n c

e i o r i R Tt au t

n l a n e ui v

e n no t r a P

o MC - -

t n 2 4 i

o t

c m A a r

e c v S i

t

/

i p )n

w. ri Tl ap itcx m

C d l aE d

n o a m (r ht u a

e n oe e a ut t h

s u

a MMAO

) - - -

C 2

( 1 35 t

r o

S N

9 9

9 1

ee i R o.

p y

. i wtn N W l u

L ev O J E D  :

T H h U T fo/ X t n n N o o H O d R i S ho n t

M M a n

e ow t

T T e i I

N R Md

)

t u

h t

m a

x U O 2 h r E P ( S o e E f s )

R n e i n

c a n s i l p

o s e L

/ x a g g E e a n ( )

R t e rroi n

) u in ia v a 1

( O r ir T aEp t l r t r r x oi s oE(

n a t

r ir e r n a t

o s it r a o u o e pd mehpt r

uH N OA OO - -

D - -

9 s EFGH 9

9 m a

6 d 1

il 3 4 d eu l

1 e

2 l

i 5- e p wd 9 i r

1 t W u su r 38 2

T yF uhec )

n 6 i 3 G g e n 4-

- S a 0 c u o 0 F - l p

5 MAR 7 S E

x t

s n

o

. : : : : ( i OEEYE e e t c

NMTBN u T r i A  : ro t r

O e l i s TA EN DD EP H D t

a fa e t c e

r y

K CIT TE n e n agr n n o ON EL  :

n pmel t DU LE y r t e n

ia l.

L P T o iuiafeure a s a

e q m

M N o

m REMRR - - - -

O u )

C S 1

( ABCD

Operating Data Report Docket No. 50-370 Date Aucust 12.1999

. Completed By Rocer Williams l

Telephone 704-382-5346 I

Operatine Status

1. Unit Name: McGuire 2
2. Reporting Period: July 1,1999- July 31.1999 j
3. Licensed Thermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculatM as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1144 MVA 9.90 power
7. Maximum Dependable Capacity (Net MWe): 1100 factor per Page 111,
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

REG 6 .

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions,if any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 5087.0 135143.0
12. Number of Hours Reactor was Critical 722.8 4285.2 107658.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14 Hours Generator On-Line 712.5 4255.1 106461.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2411752 66213467 403072525
17. Gross Electrical Energy Generated (MWH) 827234 4909374 122225443
18. Net Electrical Energy Generated (MWH) 795827 4721175 117263318
19. Unit Service Factor 95.8 83.6 78.8
20. Unit Availability Factor 95.8 83.6 78.8
21. Unit Capacity Factor (Using MDC Net) 97.2 84.4 76.5
22. Unit Capacity Factor (Using DER Net) 90.6 78.7 73.5
23. Unit Forced Outage Rate 4.2 0.7 6.6 ,
34. Shutdown Scheduled Over Next 6 Months (Type. Date and Duration of Each) l
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation) l I

Forcast Achieved l InitialCriticality Initial Electricity Commercial Operation 3A - 8/12/99

l 1

I MONTHLY REFUELING INFORM ATION REOUEST l l l l

l 1. Facility name: McGuire Unit 2

2. Scheduled next refueling shutdown: Anoust 2000
3. Scheduled restart following refueling: October 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 1112
8. Present licensed fuel pool capacity: 1461 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: Aucust 12.1999 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

G N1

. 1

- s 1 t I

e s

f l o R f a l l

1 E u af e -

K n%

g a AD E he 00 P R E w1 BI V

_ g r n ae P

I E

C ise rn t

RE o TR t

r t e

c RS ke a m n

e UA I

ad e et a r

C W r r c

_ r b ar S

_ u AL ip e /

c p ip n e EA r o r i o

R RN t r d T au t t

n OG to n l a n e TS I

c a

a ui v 2 n t e EP e a n P

t r

o n

UIR D1 PE I

t r 2 o

ea u

7 1

t MC 2 4 o

o d 9 i RN p/ 9 t

c TIB i r 7 u A ER t 1 e

v NU I

e 7/

in 0 S i

t B T br n /)

pn -

RES

_ c u o i e ri UL Tl ap

_ t l

_ r l of u r /r o I

/A itcx C RF t

c a  % d l aE d

n a

DA 1

e 0 r 0 o a ht u n toe m (r e CN a1 e a ut h AE MMAO

_ s d ot u EH e a c )

n de C RW 2 ie t rr n ( 1 35 r e u de p o p e t 9 x r 9 s eo . e S 9 nR t it n

N 1 e

c n N t

in u u .

W y i L ev e l

u eh O E D

J h

T. T. 6 T

U H

T fo/ X r

e 12 w2 o n N o H

t d R p a O i hto n t S M l

l 9 a n

fu9 T T e ow 3 /

6 i

I R Md t %1/ m a

N O

)

2 h u 0 7 0 0 x

U P ( S 1 E r e e E a in s )

R el n in n n - e c a

_ n r o o

i l p

o s t d L

/ x a a ec g n E

( )

e B g a R n p l ina ev rroi n

) i t

a s i

rl a

Tr iaE p 1 t

( r a epw r t r

s x

n 3 o t oi trEo(

o s 5 y it n a ir n a r e u u r

i r t

a u 1

3 l

J e e pd me pt h

_ r o f h OA OO u H o h.

D T. tn - - - -

9 s ht n ed o EFGH 9

9 m 6 d e

ovm _

ia 4 mie e eMl 1

2 . l 3 u e e c ht 2 l 5- d ht r f e 1 ir t Wi 8 2

p ue h F n as o

)

0 7 u su r e 3 TyF - S c

a wedr i n

a _

_ 3- G c u g g 4-F -

g e l l p

0 o 0 b ani na 5M A R7 S 2 g E x

t s o n

. : : : : t i m (

e it OEEYE in sp er e r T icr NMTBN A O e

9 9

/

ui re e t ht l i

u r o

t s .

a e TA EN DD E H P D t

a 5 1

/

i r en r u i e f

t e

c r

y K n e na CIT TE 7 Gbc rw gr nnt o yMt pu o 0

ON E L  :

n mel ia DU L E o p t el r n u L

P T a s a

e qiu iuaf g e e m

R EMRR M o 3 O N m u ) - - - -

C S I

( ABCD