st

'McGUIRE-NUCLEAR STATION MONTHLY OPERATING STATUS REPORT August' 1998 1.

Personnel Exposure -

The total station liquid release for August has been compared with'the Technical Specifications maximam' annual dose' commitment and was:less-than 10. percent of this limit.

-The total station gaseous release for August has been-compared.with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

)

~

i 1

i i

l l

l t

d 9810200018 981015 "

PDR ADOCK 05000369 R

PDR a.

d '

fY 1

w-,

.rw e

.-r,, -.

,r

+ ---.

,--m--,r-,

3 w

c--4

~.

\\

Revision 1 DOCKET: 50-369 i

UNIT: McGuire 1 Date:

09/15/98 l

NARRATIVE

SUMMARY

L-MONTH: August,1998 j

1 McGuire Unit i began the month of August operating at 100% full power. On 08/28/98 at 2029 the unit began decreasing and held at 20% power from 08/29/98 at 0500 to 1038 to repair "IB" feedwater pump bearings and perform ice condenser inspection due to glycol leak. The unit began increasing power and l

held at 45% power from 08/29/98 at 1249 until 08/31/98 at 2400 to repair "1B" feedwater pump bearings.

The unit ended the month operating at 45% full power.

I

\\

l l

l.

I l

l I

l l

l..

I

{

l i

Prepared by: R. A. Williams Telephone:(704)- 382-5346