'McGUIRE-NUCLEAR STATION MONTHLY OPERATING STATUS REPORT August' 1998 1.
Personnel Exposure -
The total station liquid release for August has been compared with'the Technical Specifications maximam' annual dose' commitment and was:less-than 10. percent of this limit.
-The total station gaseous release for August has been-compared.with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
)
~
i 1
i i
l l
l t
d 9810200018 981015 "
PDR ADOCK 05000369 R
PDR a.
d '
fY 1
w-,
.rw e
.-r,, -.
,r
+ ---.
,--m--,r-,
3 w
c--4
~.
\\
Revision 1 DOCKET: 50-369 i
UNIT: McGuire 1 Date:
09/15/98 l
NARRATIVE
SUMMARY
L-MONTH: August,1998 j
1 McGuire Unit i began the month of August operating at 100% full power. On 08/28/98 at 2029 the unit began decreasing and held at 20% power from 08/29/98 at 0500 to 1038 to repair "IB" feedwater pump bearings and perform ice condenser inspection due to glycol leak. The unit began increasing power and l
held at 45% power from 08/29/98 at 1249 until 08/31/98 at 2400 to repair "1B" feedwater pump bearings.
The unit ended the month operating at 45% full power.
I
\\
l l
l.
I l
l I
l l
l..
I
{
l i
Prepared by: R. A. Williams Telephone:(704)- 382-5346