ML20209H163

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2
ML20209H163
Person / Time
Site: McGuire  Duke Energy icon.png
Issue date: 06/30/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20209H159 List:
References
NUDOCS 9907200149
Download: ML20209H163 (6)


Text

', Operating Data Report Docket No. 50-369 Date July 14.1999 Completed By Rocer Williams Telephone 704-382-5346 Operatine Status

1. Unit Name: McGuire 1
2. Reporting Period: June I,1999 - June 30,1999 j
3. Licensed Thermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000 l
6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power
7. Maximum Dependable Capacity (Net MWe): 1100 factor per Page 111, 0.
8. If Changes Occured in Capacity Ratings (Items Nuanber 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, if Any (Net MWe):
10. Reason for Restrictions,if any:

7his Month YTD Cumulative

11. Hours in Reporting Period 720.0 4343.0 154103.0
12. Number of Hours Reactor was Critical 720.0 4343.0 115148.0
13. Reaclo.r ' Reserve Shutdown Hours 0.0 0.0 0.0 l
14. Hours Generator On-Line 720.0 4343.0 113988.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2451636 44648900 392987183
17. Gross Electrical Energy Generated (MWH) 846869 5182410 124937251
18. Net Electrical Ene,gy Generated (MWH) 816373 5001684 119548619
19. Unit Service Factor 100.0 100.0 74.0
20. Unit Availability Factor 100.0 100.0 74.0
21. Unit Capacity Factor (Using MDC Net) 103.1 104.7 68.0
22. Unit Capacity Factor (Using DER Net) 96.1 97.6 65.7
23. Unit Forced Outage Rate 0.0 0.0 11.1
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcsst Achieved Initial Criticality Initial Electricity Commercial Operation _

i 9907200149 990714 DR ADOCK 05000369 3A - 7/14/99 l PDR l

i

y

~

1 f .

- 9

_ 9

_ o ,

1 ,

7 e

g ,

a g P 3 e

c m n a e

r r

r c u S c /

p n e ir o R T a it t

n l u e a ui n

v t e n n a

r o P

o MC -

t - - -

n 2 4 i

o t

c m A a r

e v c i

S t

c

/

p )n e i ri r

r o Tl ap c x C d l i

aE t

d n

a o an moe(r ht u e e a uth t s

u a

MMAO

) - - -

C 2

( 1 35 t

r 9 d o p

9 e S 9 s e .

1 nR o N .

e t N c n e

W n u

i L ev O J E D  :

T H h U T fo/ X t n

N n H O d R o n o i o

S M he wo M t a

r T t

e i n

r R Md ht m N a t

) u x U O 2 h S

r E P (

o e E f s )

R n in e a n c o s i L lp s e g / x a

e a g

n E

( )

R t u in ev r i oi n

) r a a

1

( O r irl T aE t

r p x r t r oi s oE( _

_ n t a n a r t

o sr r i r e _

ia u t o e pd pt meh -

r o uH N OA OO -

D - - - -

s EFGH _

9 m 6 d 9 ia 4 3

de eul 1 9 l l

5-e 1 e cr d e _

p o _

9 iu 4 Wi r . 2 ) -

8 yF h c n 6 1 r 3 T _

3 G y e i

g 4- - S a F - _

0 c o 0

- l lp _

_ 5MJuR7 S

E x

t n

o

( s _

OEEYE i

e e t c -

NMTBNO r T i u ro r TA A

t e l s

e i

EN DDE H fa e t

a t K P D c y CIT t

TE n n e a gro ON EL  :

n mel n int a DU LE y o p t el L

P T .

r a s a i n u u e quiaf g e e o m M N m REMRR O u ) - - - -

C S 1

( ABCD

~

l MONTHLY REFUELING INFORM ATION REOUEST Facility name: McGuire Unit 1 1.

)

2. Scheduled next refueling shutdown: September 1999
3. Scheduled restart following refueling: October 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.  !
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 j (b) in the spent fuel pool: B11
8. Present licensed fuel pool capacity: 14_62 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: July 14.1999 Name of

Contact:

R. A. Williams Phone: (7(M)- 382-5346

l

. Operating Data Report Docket No. 50-370 Date July 14.1999 Completed By Rocer Williams Telephone 704-382-5346 l ODerating Status

1. Unit Name: McGuire 2
2. Reporting Period: June 1,1999- June 30,1999
3. Licensed Thermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000 l

. 6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power

7. Maximum Dependable Capacity (Net MWe): 1100 factor per Page 111,
8. If Changes Occured in Capacity Ratings (ltems Number 3-7) Since Last Report, Give Reasons: 0.

i

9. Power Level To Which Restricted. If Any (Ne: MWe):
10. Reason for Restrictions,if any: 1 I

(

This Month YTD Cumulative I

11. Hours in Reporting Period 720.0 4343.0 134399.0
12. Number of Hours Reactor was Critical 720.0 3562 4 106935.5 1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 {
14. Hours Generator On-Line 720.0 3542.6 105748.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2452375 56292264 393151322
17. Gross Electrical Energy Generated (MWH) 850326 4082140 121398209
18. Net Electrical Energy Generated (MWH) 819847 3925348 116467491
19. Unit Service Factor 100.0 81.6 78.7
20. Unit Avaihoility Factor 100.0 81.6 78.7
21. Unit Capacity Factor (Using MDC Net) 103.5 82.2 76.3
22. Unit Capacity Factor (Using DER Net) 96.5 76.6 73.4
23. Unit Forced Outage Rate 0.0 0.0 6.7
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved initial Criticality Initial Electricity Commercial Operation 3A - 7/14/99

1

- 9 f 9 o /

4 1 1

/

7 _

e g -

_ a C 3 .

_ P _

e c

n m _

e a r

r r c _

u S f _

c ip n _

e r o _

R T iau t _

t n l a n e

v ui t e n n a

r o P

o MC - -

t n 2 4 i

o t

c m A a r

e c _

v S _

/

p )n _

i t

c e i ri r

Tl ap r _

o c C d i x t

aE d

n h o u l

a m (r a t n oeh _

e e a ut t _

s u

a MMAO

) - - -

C 2

( 1 35 t

r 9

9 de p o S 9 s e .

1 nR o -

N .

e t N ic n e

W n u

L ev -

O J E D  :

1 H h t

J T fo/X t n

N n H O d R o o S o n M i

t a

M h e ow n T

t T e i I

R Md h m a

N O

)

t u t r x U P 2 h

( S o E e

E f s )

R n n e i a

n s ic lp o

s e L

/ x a g g E e a n ( )

R t u in ev r oi n

) iai rrl a 1

( O r T aE t

r p x r t r n

ois oE t (

t a

r ir n a r io t

a s

u r

o e pd pt meh e r o N OA OO uH - -

D - -

s EFGH 9 m 6 d 9 i a 4 d e 3 e lu 29 1 l

l 5 e cr d e

r Wi 28 p o e )

0i u 4. yF h c n 7 1 r 3 T i 3 - G ly e g 4- - S a c F - lp 0 u o 0 5M J R 7 S E

x t

s n

o

. : : : : (

OEEYE e e it c

T NMTBNO  :

r u ro ir TA A t

e l i s e

EN DDE H fa e t

a r P D t c y K

CIT I

E n n e an nt o gr ON EL  :

n melia DU LE y r o a ip t

n ug uel L

P T a s e q u iaf e e m

M N o

m RE-MRR - - -

O u )

C S 1

( ABCD

l ,

i i

MONTHLY REFUELING INFORM ATION REOUEST

1. Facility name: McGuire Unit 2
2. Scheduled next refueling shutdown: August 2000 I
3. Scheduled restart following refueling: October 2000 l i

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or  ;

performance analysis methods, significant changes in design or new operating procedures).

7. Number of Fuel assemblies (a) in the core: 192 (b) in the spent fuel pool: 111Z
8. Present licensed fuel pool capacity: 14M Size of requested or planned increase: :
9. Projected date oflast refueling which can be accommodated by present license capacity: ,

June 2003 l

DUKE POWER COMPANY DATE: July 14.1999 I Name of

Contact:

R. A. Williams Phone: 0 04)-382-5346 I l

l l

l