Special Rept 96-04,Rev 1,groundwater Level at Well Mk GWA-2 Monitored by 2WZLS5060 Was in Alarm for 7 Days.Verified That No Other Groundwater Monitoring Instruments in Alarm
ML20133L605
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 01/09/1997
From: Barron H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
96-04, 96-4, NUDOCS 9701220077
Download: ML20133L605 (6)


Text

.

<#,b

(

.l

'%IDuke Ibuer Cornpany ' -

(704)875 4000 ll

. McGuireNuclearStation '

12700 flagers Ferry Road Huntersville, NC28078-898S.

8 g :,

~

)

DUKEPOWER j

1 j.

],

January 9, 1997 I

v

)

U.S. Nuclear ~ Regulatory Commission Document Control Desk Washington, D.C.-

20555 i

Subject:

McGuire Nuclear. Station,_ Unit 1 and 2 Docket No. 50-369

.Special Report Number 96-04, Rev. 1 Problem Investigation Process No.: 2-M96-2898 l

3 Gentlemen I

i-Attached is Revision 1'of Special. Report 96-04, concerning selected Licensee. Commitment 16.9-8.

The: groundwater. level at well Mk. GWA-2, monitored by 2WZLS5060, was in alarm for 7 days. This event is considered to be of no significance with respect to the health and safety of the public.

i Very truly yours,

/k l

H.B. Barron i

JWP/bcb Attachment I

t cc Mr.

S.D.

Ebneter INPO Records Center 11 Administrator, Region II Suite 1500

-U.S. Nuclear Regulatory Commission 1100 Circle 75 Parkway 101 Marietta St.,

NW, Suite 2900 Atlanta, GA 30339 Atlanta, GA 30323-Mr. Victor Norses Mr. Scott Shaeffer U.S.. Nuclear Regulatory Commission NRC Resident Inspector Office of-Nuclear Reactor Regulation McGuire Nuclear. Station-Washington, D.C.

20555 I

'9701220077 9701098 i

ADOCK O y

fj gDR

...-a.

bxcs B. L. Walsh (ECllC)

R M. S. Kitlan (CNS)

G. A. Copp (EC050)

)

l J. I. Glenn (MG02ME) j P. R. Herran (MG0lVP) l C. B. Davis (MG01CP)

J. E. Burchfield (ONS Reg Compliance)

G. H. Savage (EC06E)

G. B. Swindlehurst (ECll-0842)

C. M. Misenheimer (EC08I)

R. F. Cole (EC05N)

J. M.

Frye (EC05N)

T. G. Becker (PB02L)

P. M. Abraham (EC08I)

R. B. White (MG0lVP)

L. V. Wilkie (ONO3SR)

D.

P. Kimball (CN05SR)

K. L. Crane (MG0lRC)

R. N. Casler (EC05N)

D. A. Harton (EC05N)

NSRB Support Staff (EC05N) i 4

1 4

4 4

. - _. _ ~

4.

Duke Power Company McGuiro Nuclear Station i

System Engineering Group Special Report i

This Special Report is being submitted as required by Selected Licensee Commitment (SLC) 16.9-8.

Groundwater well l

Mk. GWA-2 (a Reactor Building well monitored by 2WZLS5060) j was.above the Alert level of 731' for 7 days.

Report No.:

96-04 Rev. 1 Date of Report:

1/9/97 i

l Description of Incident

?-

1 Unit Status: Both Units were in Mode 1 (Power Operation) at i

100% power at the time the Groundwater Alarm was received.

The Groundwater Alarm (730'111/2") at this location was j

initially received on 10/06/96 and entered in the Technical Specification Action Item List (TSAIL) for tracking, even i

though it is a not a Technical Specification related well.

This alarm was checked by the IAE group and appeared to be valid.

This alarm subsequently cleared in less than 7 days.

i j

The alarm returned and was again entered in the TSAIL on l

10/11/96.

The alarm cleared on 11/2/96 at 2230, ~22 days.

SLC 16.9-8 prompts this report when groundwater level at i

this location is above 731' for 7 days.

For conservatism, we have assumed that if instrument is in alarm we are above 731'.

While the report documenting this investigation was j

being prepared, the alarm returned on 11/7/96.

This was not unexpected due to precipitation the previous week and the l

level was already near the setpoint.

Level Switch 2WZLS5060 l

is still in alarm at the time thic report is being submitted.

The alarm is for the same reasons, and corrective actions are the same; therefore, this report covers both events.

4 Well Mk. GWA-2 monitors groundwater at the Unit 2 Reactor j

Building wall.

The Reactor Buildings at McGuire have been i

analyzed for groundwater hydrostatic loading up to grade j

elevation (760').

Therefore, there is no concern with the eafety and health of the public or the safety of the station. After the analysis confirmed the Reactor and Diesel Buildings at McGuire were capable of withstanding hydrostatic loads up to grade elevation, the monitoring 4 -

walls associated with these structures were removed from the McGuire Tech Specs.

They were kept in the McGuire SLC's to be used as a tool in identifying piping leaks or breaks in the yard and as an indication of a problem with the underground drainage grid system.

I

- -. -. -. - - -. _ -.. _ -... - ~. - - - -

i '

DPC/MNS Special report No. 96-04 PaF 2 Corrective Action j

Immediate It was verified that no other groundwater monitoring instruments were in alarm.

A field survey of the surrounding areas was performed to e

verify there was no water percolating to the surface that would indicate a pipe leak / rupture.

An interview was conducted with the steam generator replacement ~ teammate overseeing construction regarding recent excavation work on the Unit 2 side of the site.

  • -Environmental Engineering was' requested to support this evaluation.

Their evr41uation concludes that this is a natural groundwater phenomenon vs. a leak induced rise in groundwater level.

They have seen rises in groundwater at other sites on the Duke Power system recently.

They,

'also feel that the underground drainage grid is still l

functioning adequately due to the lack of alarms at other locations.

In particular, the adjacent Auxiliary Building well (Mk. GWB-2) that is monitored by instrument 2WZLS5070 has not alarmed.

Groundwater levels at the site are driven by the, level of Lake Norman and j

precipitation.

Both have been above average for the last few years.. Based on SAR documents related to j

construction at the McGuire site, the level at which this alarm (2WZLS5060) has been received does not appear i

abnormally high.

The documents also indicate that groundwater would drain toward the Reactor Building.

l Recent construction projects associated with the Unit 2 side of the site may have contributed-to soil changes i

that have affected this well.

These projects have also altered the topography in this area, allowing more l

precipitation to soak into the soil as opposed to draining to the yard drain system.

All of these factors could affect the local groundwater level.

However, they are not jeopardizing the safety of the station or the public, as evidenced by the lack of alarms at any of the i

Technical Specification wells.

i a

i Planned i

  • Continue to monitor well Mk. GWA-2.

This well (monitored by 2WZLS5060) is located at the Unit 2 Reactor Building exterior. wall.

The Reactor Building has been qualified for hydrostatic pressures up to grade elevation (760').

j 1

The alarm was received at ~731' and is a float switch type instrument.

We will monitor this well with direct reading instrumentation in order to obtain better data on f

water level fluctuations.

b d

J

1..

+

c-w

.--v

i. -

w

~-

,, DPC/MNS Special report No. %-04 Page 3 Monitor the nearest Technical' Specification related well i

(Mk. GWB-2,. monitored by 2WZLS5070) in order.to verify that this phenomenon is localized in the area of well Mk.

3 j-

.GWA-2 and does not raise concerns with the Auxiliary-l Building groundwater levels.

As mentioned previously, we have not received any alarms associated with the Auxiliary Building.

The Auxiliary Building monitors are associated with Technical Specification 3/4.7.13.

Should any three of the five indicate above elevation 731', the l

plant would be required to lower the groundwater level'to less than 731' within one hour or shutdown within the following'six hours.

I After confirming that the rise in groundwater is localized to the area of Mk. GWA-2 and there is no problem that could affect the Auxiliary Building, Duke.

4 Power may seek a change to the SLC to more closely i

reflect the expected seasonal high groundwater elevation 1

at this well site.

This should eliminate a nuisance alarm in the control room.

No requests for changes to any of the Auxiliary Building (Technical Specification related) setpoints are anticipated.

l i

DPCMNS

,.Special report No. 96-04 Page 4 Addendum to Special Report 96-04 Due to continued rainfall and higher than seasonal levels in Lake Norman, the subject Groundwater Monitoring Well continued to alarm, clear, and return.

The alarm last returned on 12/5/96 and remained in alarm greater than 7 days.

Therefore, this addenda to Special Report 96-04 is being submitted.

All of the information supplied in the initial report still applies.

No safety concern exists and actions are being pursued in order to gather additional information before pursuing changes to the setpoints.

As 1

reported previously, this well is SLC related.

No Technical Specification wells have been in alarm during this event.

Continued clearing / returning of this alarm is probable until the level of Lake Norman decreases long enough to allow groundwater levels to subside.

During installation of additional monitoring instruments oh 12/18/96, it was observed that the water level in well Mk.

GWA-2 was ~1-1/2" above the alarm setpoint.

There was no s

water in the adjacent Technical Specification well (Mk. GWB-2).

This substantiates our initial hypothesis that the high groundwater level is localized in the area of Mk. GWA-2 and is not affecting the Auxiliary Building.

The level of Lake Norman began decreasing in mid-December.

4 The alarm cleared about 12/31/96 and has remained clear.

Monitoring of well Mk. GWA-2 (SLC) and Mk. GWB-2 (TS) is continuing.

i 4