ML20199E030

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2
ML20199E030
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/31/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20199E013 List:
References
NUDOCS 9901200292
Download: ML20199E030 (10)


Text

-

j-L 0?IIATING DATA IIP 0tf DOCIIT IO 50 369 DATI J,ggg,v 15. 1999 _

OFItATIEG STATUS COMPli??D B',,,,,_LL Villian

?!LIPHC#I 7M 382-5346 1.UnitRese:McGuire1 2.ReportingPeriod: December 1,1998-December 31,1998 3.Licensedthernalfouer(Mtli 3ill

4. Eastplate lating (Gross He):

1305' Notes 'Raseplate Rating

5. Design Ilectrical lating (Bet He):

1180 (Gross H e) calculated as

,6. Natieus Dependable Capacity (Gross H e):

1171 1150.000 M A I.90 power 7.NaziensDependableCapacity(NetMVe):

1100 factorperPage111, 8.IfChangesoccurincapacitylatings(ItessRusber3Through7)Si;;ceLast HRIG0020.

Report.Givelessons:

9. Power Le7el.fo Which testricted,-If Any (Iet He):

10.tensonforRestrictions,Ifany:

ThisMonth it, to Date Cuselative 11.SoursInReportingPeriod.

741.0 8760.0 149760.0

13. Nesber Of Bours teacter Ves Critical 7H.0 7931.9 110805.0

'13. Reactor leserve Shutdown Hours.

--0-- - -

24..HoursGeneratoronLine.

7H.0

.7890.7 109H5.7.

13.UnitReserveshutdownHours

--0--

--0--

0--

116.GrossthersalInergyGenerated(HB) 2535182 26339242 318338283 17.GrossIlectricalEnergyGenerated{NH) 892129 9156607 119754841

18.' Ret Ilectrical Inergy Generated (HH) 861180 8816633 11(H6935 19.UnitServicefacter.

100.0 10.1 73.2 20.UnitAfa11abilityFactor 100.0 90.1 73.2

31. Unit Capacity Factor (Using EC Net) 105.2 91.5 67.0 22.UnitCapaeltyFactor(UsingDitNet) 18.1 85.3 64.8 0.0 0.7 11.5 333.UnitForcedOutagelate
24. 8hutdova Scheduled Over leXt 6 Months (Type, Date, and Duration of Iach):

None 25.IfStatDownAtindOfReportPeriod.'IstinatedDateofStartup: None

.26.UnitsInfestStatus(PriortoCossercialOperation):

Forecast Achieved L

IIITIALCRITICAL!ff INITIALILICftICITT COMItCIAL 0?!!ATION

i 9901200292'990112 7

PDR ADOCK 05000369/

R P!wt di

~.

b

-I'

'y

?

l.1 o

OPIIATING DATA IIP 0lf 7

by

'q.

i DOCIIT N0 50-369 If 3

UNIT McCalta 1 L

DATI Janary 15,199I CONPLITID I?

R.A. E1111ame TILIPI0BI 704 312-5346 ji l

,l

NONTE Decembere 1998-i l

L

341

AVIIAGI DAILY POVII LIVIL~-

DAL AVIIAGI DAILY POWII LITIL In!-let)

'(NueNet)

? ', '

~ 1 1156-

17 '

1158 2

1155-Il 1159 r.-

~

3

1157 19-1159

~4 lisi 20 ~

1151 l

l

'5 1158 21 7 1159

.l u

6..

1158 22 1159 l Illi 23 1157 8

1158' 24 1159 25 1158-9-

1155

.t 10-1155 26 1159 1

11 1155-21 -

1161

^

,.j 12 l 1156 28 1150 jl3

-1156

' 29 1159

' 14 1155 30 116D

'15?

1154.

31 1161.

i l-

~

~ 1156' i

j

- 16i n

l 1

L

--s-

P-

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME mwy1x4 1 DATE ul/id/ss REPORT MONTH December 1998 COMPLETED BY x.

a.

Williams TELEPHONE

(/us)-362-ddee (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)'

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))

D-Regulatory Restriction 4-Other (Explain)

File E-@erator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other

l

~

l.. *

.i l

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

McGuire Unit 1 l

l-2.

Scheduled next refueling shutdown: Scotember 1999 I

t 3.

Scheduled restart following refueling: October 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 i

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or E

other lit.ense amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting prcrosed licensing action and su porting information.

6.

Important licensing considera00ns (new or different design or upplier, unreviewed design er performance analysis methods, sigr,ricant changes in design et new operating procedures).

7.

Number of Fuel assemblier (a) in the core: 191 (b) in the spent fuel pool: 311 i

8.

Present licensed fuel pool caper; 14. 61 l

Size of requested or planned increase:..-

l 9.

Projected date of last refueling <hich can te accommodated by present license capacity:

i November 2005 I

DUKE POWER COMPANY DATE: January 15.1999 Name of

Contact:

R. A. William!

Phone: (704)-382-5346 l

1 o

j l

4 i

l l

I

DOCKET: 50-369 UNIT: McGuire 1 Date:

01/15/99 NARRATIVE

SUMMARY

' MONTH: December,1998 McGuire Unit 1 began the month of December operating at 100% full power. The unit operated at or near 100% full power for the entire month.

' Prepared by: R. A. Williams Telephone:(704)- 382-5346 I

r-

OPERATING DATA RIP 0ff DOCIlf NO 50 370 DATI.latuary 15,1999 0 PIRATING ffAfDS COMPLITED BT I.A. Willians

?!LIPHONI 704 382 5346

1. Unit Nase: McGuire 2 2.ReportingPeriod: December 1,19984ecesber 31,1998 3.LicensedThermalPower(Nut):

3(11 j

4.Naseplatelating(GrossNie):

1305' Notes 'Naseplate Rating

.5.DesignIlectricallating(NetNie):

1180 (GrossNie)calculatedas 6.MariansDependablecapacity(GrossNie):

1171 1450.000 MVA I.90 power 7.NazisusDependablaCapacity(NetNWe):

1100 factorperPageill,,

'8.'IfChangesoccurincapacitytatings(ItessRusber3Through7)SinceLast NURIG4020.

Report.GiveReasons:

9.PowerLevel70Vhichtestricted,IfAny(NetNVe):

-10.ReasonForRestrictions,Ifany:

ThisMonth Tr.-toiste Cusulative I

11. Hours In Reporting Period 741.0 8760.0 130056.0

-l 12.EusberOfHoursteactorunscritical 714.0 8726.7 103373.1 1

13.ReactorReserveShutdownEcurs 4 --

--0--

4--

14.RoursGeneratoronLine' 744.0 8715.7 102206.3

15. Unit Reserve Shutdown Hours -4-- 16.GrossThersalInergyGenerated(NIH) 25355(9 21615072 336859058

-17.GrossIlectricalEnergyGenerated(NIH) 890665 10300661 117316069 i18.NetIlectricalInergyGenerated(NVE) 859051 9928273 112542143 l19.UnitServicefactor 100.0 99.5 78.6

'20. Unit Atallability factor.

100.0 99.5 78.6 l

21.UnitcapacityFactor(UsingNDCNat) 105.0 103.0 16.2 22.'UnitCapacityFactor(UsingDIRNet) 97.8 96.1 73.3 j

23. Unit Forced Octage late 0.0 0.5 6.9 i

. 24. Shutdoun Scheduled CYer liert 6 Months (Type, Date, and Duration of Iach):

Refueling - March 12, 1999 - 35 days 25.-IfShstDownAtEndOfReportPeriod.IstigatedDateofStartup: None 26.'UnitsInfestStatus(PriortoConsercialOperation):

Terecast Achieved INITIAL CRIf!CAllff IIITIAL IIICftICITT CONNItCIALOPIRATICI O

t

y>

y.

pe R

'h OPItnTING DATA RIP 0tf

\\

l.

, l' DOCIIT N0 50 370 MIT Rcanira 2

. DATI.lannary 15,1998 CONFLITID Bf 1.L R1111ans f!LIFB0pt 704 312-5346 E

y;.

-NORTH Bacanhar. Ills-t RI:

"AVltAGI LAILY Pollt LIVIL RI AVERAGE DAILY POWER LITIL

.)-

(neset)'

(use-set) 1155

/- <; l 1154 17 l=

2 1154 18 1156 l

2 1148-19-1157 -

)

3' 1

o

~'

4.

1142 20 1157 l

'5' 1155-21 1157 5;

1155--

22 1156 a

7

~1156' 23 1154 Lil 1155-24 1156 l[

1153 25

'1155 10L

-1153' 26 1156 I

' 11 --

1153-27 1158 12

~

1153 28

. -1158 13i

'1153 29 1157 1

[ (14f 1152

~30-

'.1158 4

415 a 1152-

  • 31 1158 3.

16 1155 i

+

4 e_

s

- "r.

UNIT-SHUTDOWNS AND POWER' REDUCTIONS:

DOCKET NO.

50-370' UNIT NAME muuying 2 DATE v1/13/33

- REPORT MONTH December 1998 COMPLETED BY x.

A.

stilliams TELEPHONE

( vue )

.s uz-d.se e (1)

(2)

(3)

(4)

(5)-

R MET-E HOD t

T-A OF LICENSE N

Y-S SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P.

' DURATION O-DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE i

'NO SHUTDOWNS OR REDUCTION S I

I i

1 m

(1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit O - Instructions ;

S Scheduled A-Eq11ipment Failure (Explain) 1-Manual for Preparation of, Data-B-Maintenance or test 2-Manual Scram Entn Sheets For Licensee i C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))

D-Regulatory Restrictior,1 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other 4

l k

i m

- - +

w.--

w..-

m e-m o..

.a

-se w- - - -

.m l

I I

MONTHLY REFUFI ING INFORM ATION REOUEST I

1.

Facility name:

McGuire Unit 2

- 2.

Scheduled next refueling shutdown: March 1999 7

I l

3.

Scheduled restart following refueling: April 1999 l

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l

l THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l 4.

Will refueling or resumption of operation thereafter require a technical specification change or l

other license amendment?

l l

6 l

If yes, what will these be?

I If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

l l

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

l l

6.

Important hcensing considerations (new or different design or suppher, unreviewed design or j

performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: IM l

(b) in the spent fuel pool: JMZ f

8.

Present licensed fuel pool capacity: 14Q Size of requested or planned increase: =

i 9.

Projected date oflast refueling which can be accommodated by present license capacity:

l June 2003 i

t DUKE POWER COMPANY DATE: IAGuary 15.1999 i

l

' Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 I

i-h 9

l

4 DOCKET: 50- 370 UNIT: McGuire 2 Date:

01/15/99 l

-l l

NARRATIVE

SUMMARY

l MONTH: December,1998

]

McGuire Unit 2 began the month of December operating at 100% full power. The unit operated at or near j

100% full power for the entire month.

j 1

i l

1 I

1 i

I 1

- Prepared by: R. A. Williams-p j'

Telephone: (704)- 382-5346 f

-