Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2401998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8201998-06-30030 June 1998 Monthly Operating Repts for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236F0381998-05-31031 May 1998 Monthly Operating Repts for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8251998-05-31031 May 1998 Revised MOR for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247K3851998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for McGuire Nuclear Station ML20247L5981998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0681998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247L6181998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E3991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0811998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1997 for McGuire Nuclear Station,Units 1 & 2 ML20202G7531998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E4111998-01-31031 January 1998 Rev 1 to Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20202G7741997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station,Units 1 & 2 ML20198P2521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station ML20203H6491997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for McGuire Nuclear Station,Units 1 & 2 ML20199D3221997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station ML20203H6601997-10-31031 October 1997 Revised Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station,Units 1 & 2 ML20211P9841997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for McGuire Nuclear Station ML20216K1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2 ML20216K1561997-07-31031 July 1997 Revised Monthly Operating Status Rept for Jul 1997 for McGuire Nuclear Station,Units 1 & 2 ML20210L0691997-07-31031 July 1997 Monthly Operating Repts for July 1997 for MNS ML20149F2421997-06-30030 June 1997 Monthly Operating Repts for June 1997 for McGuire Nuclear Station,Units 1 & 2 ML20140H1171997-05-31031 May 1997 Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J1891999-10-0101 October 1999 Safety Evaluation Supporting Exemption from 10CFR54.17(c)re Schedule to Apply for Renewed Operating Licenses ML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20212G1211999-09-22022 September 1999 Safety Evaluation Supporting Amends 188 & 169 to Licenses NPF-9 & NPF-17,respectively ML20212G2671999-09-22022 September 1999 Safety Evaluation Supporting Amends 187 & 168 to Licenses NPF-9 & NPF-17,respectively ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20211P1371999-09-0808 September 1999 Safety Evaluation Supporting Amend 186 to License NPF-9 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis 05000369/LER-1999-001-04, :on 990306,TS SR for Ice Condenser Lower Inlet Doors Was Not Met.Caused by Failure to Recognize That Recorded Valve Was Outside Acceptance Criteria.Mgt Reinforced Expectations for Procedure Performance & Review1999-03-31031 March 1999
- on 990306,TS SR for Ice Condenser Lower Inlet Doors Was Not Met.Caused by Failure to Recognize That Recorded Valve Was Outside Acceptance Criteria.Mgt Reinforced Expectations for Procedure Performance & Review
ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B7991998-09-28028 September 1998 Safety Evaluation Supporting Amends 183 & 165 to Licenses NPF-09 & NPF-17,respectively ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage 05000369/LER-1998-006-02, :on 980812,noncompliance with Ice Condenser TS SR 4.6.5.1b.3 Noted.Caused by Lack of Clear Documentation Re Interpretation of TS SR 4.6.5.1b.3.Submitted TS Amend to Clearly Establish SR & Will Review Ice Condenser TSs1998-09-11011 September 1998
- on 980812,noncompliance with Ice Condenser TS SR 4.6.5.1b.3 Noted.Caused by Lack of Clear Documentation Re Interpretation of TS SR 4.6.5.1b.3.Submitted TS Amend to Clearly Establish SR & Will Review Ice Condenser TSs
1999-09-08
[Table view] |
Text
-
j-L 0?IIATING DATA IIP 0tf DOCIIT IO 50 369 DATI J,ggg,v 15. 1999 _
OFItATIEG STATUS COMPli??D B',,,,,_LL Villian
?!LIPHC#I 7M 382-5346 1.UnitRese:McGuire1 2.ReportingPeriod: December 1,1998-December 31,1998 3.Licensedthernalfouer(Mtli 3ill
- 4. Eastplate lating (Gross He):
1305' Notes 'Raseplate Rating
- 5. Design Ilectrical lating (Bet He):
1180 (Gross H e) calculated as
,6. Natieus Dependable Capacity (Gross H e):
1171 1150.000 M A I.90 power 7.NaziensDependableCapacity(NetMVe):
1100 factorperPage111, 8.IfChangesoccurincapacitylatings(ItessRusber3Through7)Si;;ceLast HRIG0020.
Report.Givelessons:
- 9. Power Le7el.fo Which testricted,-If Any (Iet He):
10.tensonforRestrictions,Ifany:
ThisMonth it, to Date Cuselative 11.SoursInReportingPeriod.
741.0 8760.0 149760.0
- 13. Nesber Of Bours teacter Ves Critical 7H.0 7931.9 110805.0
'13. Reactor leserve Shutdown Hours.
--0-- - -
24..HoursGeneratoronLine.
7H.0
.7890.7 109H5.7.
13.UnitReserveshutdownHours
--0--
--0--
0--
116.GrossthersalInergyGenerated(HB) 2535182 26339242 318338283 17.GrossIlectricalEnergyGenerated{NH) 892129 9156607 119754841
- 18.' Ret Ilectrical Inergy Generated (HH) 861180 8816633 11(H6935 19.UnitServicefacter.
100.0 10.1 73.2 20.UnitAfa11abilityFactor 100.0 90.1 73.2
- 31. Unit Capacity Factor (Using EC Net) 105.2 91.5 67.0 22.UnitCapaeltyFactor(UsingDitNet) 18.1 85.3 64.8 0.0 0.7 11.5 333.UnitForcedOutagelate
- 24. 8hutdova Scheduled Over leXt 6 Months (Type, Date, and Duration of Iach):
None 25.IfStatDownAtindOfReportPeriod.'IstinatedDateofStartup: None
.26.UnitsInfestStatus(PriortoCossercialOperation):
Forecast Achieved L
IIITIALCRITICAL!ff INITIALILICftICITT COMItCIAL 0?!!ATION
- i 9901200292'990112 7
PDR ADOCK 05000369/
R P!wt di
~.
b
-I'
'y
?
l.1 o
OPIIATING DATA IIP 0lf 7
by
'q.
- i DOCIIT N0 50-369 If 3
UNIT McCalta 1 L
DATI Janary 15,199I CONPLITID I?
R.A. E1111ame TILIPI0BI 704 312-5346 ji l
,l
- NONTE Decembere 1998-i l
L
- 341
AVIIAGI DAILY POVII LIVIL~-
DAL AVIIAGI DAILY POWII LITIL In!-let)
'(NueNet)
? ', '
~ 1 1156-
- 17 '
1158 2
1155-Il 1159 r.-
~
- 3
1157 19-1159
~4 lisi 20 ~
1151 l
l
'5 1158 21 7 1159
.l u
6..
1158 22 1159 l Illi 23 1157 8
1158' 24 1159 25 1158-9-
1155
.t 10-1155 26 1159 1
11 1155-21 -
1161
^
,.j 12 l 1156 28 1150 jl3
-1156
' 29 1159
' 14 1155 30 116D
'15?
1154.
31 1161.
i l-
~
~ 1156' i
j
- 16i n
l 1
L
--s-
- P-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME mwy1x4 1 DATE ul/id/ss REPORT MONTH December 1998 COMPLETED BY x.
a.
Williams TELEPHONE
(/us)-362-ddee (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)'
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-@erator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
l
~
l.. *
.i l
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire Unit 1 l
l-2.
Scheduled next refueling shutdown: Scotember 1999 I
t 3.
Scheduled restart following refueling: October 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 i
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or E
other lit.ense amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting prcrosed licensing action and su porting information.
6.
Important licensing considera00ns (new or different design or upplier, unreviewed design er performance analysis methods, sigr,ricant changes in design et new operating procedures).
7.
Number of Fuel assemblier (a) in the core: 191 (b) in the spent fuel pool: 311 i
8.
Present licensed fuel pool caper; 14. 61 l
Size of requested or planned increase:..-
l 9.
Projected date of last refueling <hich can te accommodated by present license capacity:
i November 2005 I
DUKE POWER COMPANY DATE: January 15.1999 Name of
Contact:
R. A. William!
Phone: (704)-382-5346 l
1 o
j l
4 i
l l
I
DOCKET: 50-369 UNIT: McGuire 1 Date:
01/15/99 NARRATIVE
SUMMARY
' MONTH: December,1998 McGuire Unit 1 began the month of December operating at 100% full power. The unit operated at or near 100% full power for the entire month.
' Prepared by: R. A. Williams Telephone:(704)- 382-5346 I
r-
OPERATING DATA RIP 0ff DOCIlf NO 50 370 DATI.latuary 15,1999 0 PIRATING ffAfDS COMPLITED BT I.A. Willians
?!LIPHONI 704 382 5346
- 1. Unit Nase: McGuire 2 2.ReportingPeriod: December 1,19984ecesber 31,1998 3.LicensedThermalPower(Nut):
3(11 j
4.Naseplatelating(GrossNie):
1305' Notes 'Naseplate Rating
.5.DesignIlectricallating(NetNie):
1180 (GrossNie)calculatedas 6.MariansDependablecapacity(GrossNie):
1171 1450.000 MVA I.90 power 7.NazisusDependablaCapacity(NetNWe):
1100 factorperPageill,,
'8.'IfChangesoccurincapacitytatings(ItessRusber3Through7)SinceLast NURIG4020.
Report.GiveReasons:
9.PowerLevel70Vhichtestricted,IfAny(NetNVe):
-10.ReasonForRestrictions,Ifany:
ThisMonth Tr.-toiste Cusulative I
- 11. Hours In Reporting Period 741.0 8760.0 130056.0
-l 12.EusberOfHoursteactorunscritical 714.0 8726.7 103373.1 1
13.ReactorReserveShutdownEcurs 4 --
--0--
4--
14.RoursGeneratoronLine' 744.0 8715.7 102206.3
- 15. Unit Reserve Shutdown Hours -4-- 16.GrossThersalInergyGenerated(NIH) 25355(9 21615072 336859058
-17.GrossIlectricalEnergyGenerated(NIH) 890665 10300661 117316069 i18.NetIlectricalInergyGenerated(NVE) 859051 9928273 112542143 l19.UnitServicefactor 100.0 99.5 78.6
'20. Unit Atallability factor.
100.0 99.5 78.6 l
21.UnitcapacityFactor(UsingNDCNat) 105.0 103.0 16.2 22.'UnitCapacityFactor(UsingDIRNet) 97.8 96.1 73.3 j
- 23. Unit Forced Octage late 0.0 0.5 6.9 i
. 24. Shutdoun Scheduled CYer liert 6 Months (Type, Date, and Duration of Iach):
Refueling - March 12, 1999 - 35 days 25.-IfShstDownAtEndOfReportPeriod.IstigatedDateofStartup: None 26.'UnitsInfestStatus(PriortoConsercialOperation):
Terecast Achieved INITIAL CRIf!CAllff IIITIAL IIICftICITT CONNItCIALOPIRATICI O
t
y>
y.
pe R
'h OPItnTING DATA RIP 0tf
\\
l.
, l' DOCIIT N0 50 370 MIT Rcanira 2
. DATI.lannary 15,1998 CONFLITID Bf 1.L R1111ans f!LIFB0pt 704 312-5346 E
y;.
-NORTH Bacanhar. Ills-t RI:
"AVltAGI LAILY Pollt LIVIL RI AVERAGE DAILY POWER LITIL
.)-
(neset)'
(use-set) 1155
/- <; l 1154 17 l=
2 1154 18 1156 l
2 1148-19-1157 -
)
- 3' 1
o
~'
4.
1142 20 1157 l
'5' 1155-21 1157 5;
1155--
22 1156 a
7
~1156' 23 1154 Lil 1155-24 1156 l[
1153 25
'1155 10L
-1153' 26 1156 I
' 11 --
1153-27 1158 12
~
1153 28
. -1158 13i
'1153 29 1157 1
[ (14f 1152
~30-
'.1158 4
415 a 1152-
16 1155 i
+
4 e_
s
- "r.
UNIT-SHUTDOWNS AND POWER' REDUCTIONS:
DOCKET NO.
50-370' UNIT NAME muuying 2 DATE v1/13/33
- REPORT MONTH December 1998 COMPLETED BY x.
A.
stilliams TELEPHONE
( vue )
.s uz-d.se e (1)
(2)
(3)
(4)
(5)-
R MET-E HOD t
T-A OF LICENSE N
Y-S SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P.
' DURATION O-DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE i
'NO SHUTDOWNS OR REDUCTION S I
I i
1 m
(1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit O - Instructions ;
S Scheduled A-Eq11ipment Failure (Explain) 1-Manual for Preparation of, Data-B-Maintenance or test 2-Manual Scram Entn Sheets For Licensee i C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restrictior,1 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other 4
l k
i m
- - +
w.--
w..-
m e-m o..
.a
-se w- - - -
.m l
I I
MONTHLY REFUFI ING INFORM ATION REOUEST I
1.
Facility name:
McGuire Unit 2
- 2.
Scheduled next refueling shutdown: March 1999 7
I l
3.
Scheduled restart following refueling: April 1999 l
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l
l THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l 4.
Will refueling or resumption of operation thereafter require a technical specification change or l
other license amendment?
l l
6 l
If yes, what will these be?
I If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
l l
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
l l
6.
Important hcensing considerations (new or different design or suppher, unreviewed design or j
performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: IM l
(b) in the spent fuel pool: JMZ f
8.
Present licensed fuel pool capacity: 14Q Size of requested or planned increase: =
i 9.
Projected date oflast refueling which can be accommodated by present license capacity:
l June 2003 i
t DUKE POWER COMPANY DATE: IAGuary 15.1999 i
l
' Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 I
i-h 9
l
4 DOCKET: 50- 370 UNIT: McGuire 2 Date:
01/15/99 l
-l l
NARRATIVE
SUMMARY
l MONTH: December,1998
]
McGuire Unit 2 began the month of December operating at 100% full power. The unit operated at or near j
100% full power for the entire month.
j 1
i l
1 I
1 i
I 1
- Prepared by: R. A. Williams-p j'
Telephone: (704)- 382-5346 f
-