Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2
ML20217G795
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 09/30/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20217G791 List:
References
NUDOCS 9910210357
Download: ML20217G795 (6)


Text

,,

,, Operating Data Report Docket No. ,50-369 Date October 13.1999 i Completed By Rocer Williams Telephone 704-382-5346 I

Operating Status l

1. Unit Name: McGuire I
2. Reporting Period: September 1,1999-September 30, 1999 f
3. Licensed Thermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.900 1
6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power
7. Maximum Dependable Capacity (Net MWe): 1100 factor per Page ill, "
8. If Changes Occured in Capacity Ratings (Items Number 3 7) Since Last Report, Give Reasons:
9. P' ower Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions,If any:

This Month YTD Cumulative

11. Hours in Reporting Period ~ 720.0 6551.0 156311.0
12. Number of Hours Reactor was Critical 406.7 6237.7 117042.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 406.7 6237.7 115883.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1370352 67024739 415363022
17. Gross Electrical Energy Generated (MWH) 473317 7384895 127139736

' 18. Net Electrical Eriergy Generated (MWH) 452467 7119655 121666590

- 19. Unit Service Factor 56.5 95.2 74.1 !

20. Unit Availability Factor 56.5 95.2 74.1 1
21. Un'it Capacity Factor (Using MDC Net) 57.1 98.8 68.3

. 22. Unit Capacity Factor (Using DER Net) - 53.3 92.1 66.0

23. Unit Forced Outage Rate 0.0 0.0 10.9

. 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each) .

l l

~ 25. If Shutdown At End Of Report Period, Estimated Date of Startup 1

~ 26. Units in Test Status (Prior to Commercial Operation) 1 Forcast Achieved Initial Criticality Initial Electricity l Commercial Operation 9910210357 991013

i. PDR ADOCK 0500026V  ! 3A - 10/13/99 R PDR L

1 9 f 9, o -

i t 3

- 1 - n ,

u f

t g

- e g~ ,

e a -

h ,

C P e T. 3

_ ht eg n ta e u

_ h o wg e n c 5, i l m n 0 e a

_ e r

3 u 1 f r

c r

u E t er S c G a /

ip n e A 9 3 1 r i o

R T Be T au t t

n U 7

c l l a n e

v O / y 9 c ui t e G n no P

r o

N I

0 f-l i

t nd o - MC a

t n

I F u ne 2 4 r

o U e n it c

F E wi g o e m A R pb a r

e 3 l o c v 1 l

u t S i

t f 4 /) -

c E ipn

. e r L %42 ri Tl ap r

o C 0 0

2 c x -

C Y 1 t

a iaE d C r 9 a

d l o a t

n a F-O e 9 n 7/

ht u n m oe(r e - r 1 e a tuth -

_ s u D o/ 9 MMAO 9

9 9 C a N E

t a 0 d n

)

2

( I 35 1 t t e o o

r a e r d p r e in e e s e . pl S b n R o o f-f

- N a. e c n Nt it o -

i n e n

.W L ev u O.

D R:

E l

ek h ta s

a H

T. ew r

U T fo/ X wt n N o i

o H O d R o n p un i -

S M he w l l e t

a n

T

_ t T o 1 fu h i I

N R Md t u  % T. m a

0 g e

) x

.U. O 2 h 0 at E -

_ P ( S E

1 t

u e s )

R a o n e

n

- g g c i

a n n n i  !

p o i t

i l L x s

a a r ue .

/

g E _

_ e C e p fer h t n ( ) _

R o a i

n ev oi r n -

) 3 o i

r a Ta iaE px 1 r r rl

( e 1 m t -

b e r _

7 ml e y c ht e r oi s t

rEo(

n 2 t t a

t n a r o s p e f< o f r ir e e meh i r 3 t

a u 1 S o -r e pd pt r o 3 fo dn dn OA OO uH - -

9 D ht ei a E FGH ._

9 9

s m 6 d n o or mt _

1

3. ia l

4 3

de eul meweer .

he oh 1 l 1 i 5- e cr d -

e p o e p t 9 i r r W e r 8 2

yF h c S t n g ge )

n -

6 u b T a n a 3 G to e 4 - e 3 - S gi t i

a 0 c c o 0

- F - e s u l p

5MOR7 S b ae o x n I r e E t s o

. : : :: c e ht ( i OEEYE it n d n e r T e t c

, NMTEN A O e

9 B u ni e l u ro i

t r

s r ga ed i

TA e EN DD H fa e t

a 7 i r EP D 1

/ u be na c y K

CIT TE 9 Gt i t n n e agrnnt o 0 c i ON EL yMu n m e n o mei a DU LE r p t n

l el u L

P T r

a s a qiuiuafge e e

o m

M N 1

m RE MRR O u ) - - - -

C S 1

( ABCD

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire Unit 1
2. Scheduled next refueling shutdown: Currently Refueline i

3.' Scheduled restart following refueling: November 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 '

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?  !

)

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee j regarding unreviewed safety questions?

5. - Scheduled date(s) for submitting proposed licensing action and supporting information.

n _6. Important licensing considerations (new or different design or supplier, unreviewed desip or performance analysis methods, significant changes in design or new operating procedures).

7. . Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuel pool: 2R
8. Presentlicensed fuelpoolcapacity: L4f1 Size of requested or planned increase: =
9. Projected date of last refueling which can be accommodated by present license capacity:

j November 2005 DUKE POWER COMPANY DATE: October 13.1999 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

., . Operating Data Report Docket No. 50-370 Date October 13.1999

. Completed By Roger Williams Telephone 704-382-5346

. Operating Status :

- 1. Unit Name: . McGuire 2

2. Reporting Period:. September 1,' 199)- September 30, 1999
3. Licensed 'Ihermal Power (MWt): 3411 Notes:
  • Nameplate .l
4. Nameplate Rating (Gross MWe):. 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe)
1144 MVA * .90 power J . 7. Maximum Dependable Capacity (Net MWe): 1100 factor per Page 111
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

REG 420.

9. Power Level To Which Restricted,If Any (Net MWe):

4

!!0. Reason for Restrictions,If any: )

This Month .YTD Cumulative

'i1. Hours in Reporting Period t 720.0 6551.0 136607.0

12. Number of Hours Reactor was Critical 720.0 5749.2 109122.2
13. Reactor Reserve Shutdown Hours 0.0 l'

0.0 0.0

14. Hours Generator On-Line ' 720.0 5719.1 107925.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy uenerated (MWH) 2453234 86067908 422926966
17. Gross Electrical Energy Generated (MWH) 843378 6614018 123930087
18. Net Electrical Energy Generated (MWH) 812151 6363141 118905284 l
19. Unit Service Factor , 100.0 87.3 79.0 o 20. Unit Availability Factor 100.0 87.3 79.0

- 21. Unit Capacity Factor (Using MDC Net) 102.5 88.3 76.7

22. Unit Capacity Factor (Using DER Net) . 95.6 82.3 73.8
23. Unit Forced Outage Rate 0.0 0.5 6.6 i

~ 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)

- 25.-If Shutdown At End Of Report Period, Estimated Date of Startup

26. Units in Test' Status (Prior to Commercial Operation) -

Fon ast ' Achieved

~ Imtial' Criticality 1

, initial Electricity Commercial Operation 3A 10/13/99

1 9 f 9 o /

3 1

1 /

0 e

g ,  :

1 a C P 3 e

c n m a

r e

r c r

u c

e S

/

i p no --

r i R T au t _

t n l a n e ui v n n t e a r o P

o MC - - -

t _

n 2 4 -

i o -

t c m A a r

e v

c S

i t /)pn c

e i

ri i

Tl pa m icx C

o a aE t

d l d

n ht u m (r a n oe t h e e a ut 9

s u

a MMAO

) - - -

9 C 2 9 ( 1 35 1 t r

de p o S "

s e .

n R o N -

e c n N t

W  ?

x i

L ev O E- E D  :

T H T

fo/ X h

U N t

n n H. O d R o i o

S o n M t a _

T M he w t

o in T e _

I.

N R Md t u

h t

m _

O

) u U P 2 h

( S r F o e E f s )

R n r e i a

n c o s i L

l p

s e g / x a

e a g E in ( )

R t u n ev r oi n

) ia r a 1

( O r T aE irl t

r p x r t oi s t rE o(

n t

- n a r o s ri r e ir t

a u o e pd pt meh r o uH N OA OO - -

D - -

9 9 s EFGH 9 m 6 d 1

. i a 4 d e l 2 3 l l

3 5-e u e

1 i e

p cor de 0 i r r e W 2 8 yF h c )

n 7 u b o

r 3 e T S i a

3- G c t g 4-F - l p

0 c o 0

'5 M O R 7 S x n

.: : : : E(

t s i o

OEEYE eT e t c

NMTBN A O e l r

u r ia o i

t r

s TA e EN DD EH t

a f e r K P D t c y CIT TE n e n a gro ON EL  :

n mel nnt a

LE i

j o p t DU L P T s n u ug el o

. e niuiaf a

e e M N RE MRR O )

1 ABCD S C E (

[

-,,. ;t, MONTHLY REFUEllNG INFORMATION REOUEST

1. Facility name: McGuire Unit 2 '
12. Scheduled next refueling shutdown: Aunust 2000

. 3. Scheduled restart following refueling: October 2000 j

, THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEP.EFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. j 4.. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? {

If yes, what will these be?

If no, has reload design and core configuration beca reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting poposed licensing action and supporting information.
6. :Important licensing considerations (new or different design or supplier, unreviewed design or ,

performance analysis methods, significant changes in design or new operating procedurra). 1

7. Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 1112
8. Present licensed fuel pool capacity:,1411 Size of requested or planned increase: -.-

- 9. Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE October 13.1999 Name of

Contact:

' R: A. Williams Phone: (704)-382-5346 l

l I

_