Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2
ML20204C891
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/28/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20204C887 List:
References
NUDOCS 9903240009
Download: ML20204C891 (6)


Text

.,- .

Operating Data Report Docket No. 50-369 Date March 11.1999

  • {

Completed By Rocer Williams j 1 Telephone 704-382-5346

! {

Operatins Status

1. Unit Name: McGuire 1
2. Reporting Period: February 1,1999-February 28, 1999
3. Licensed Thermal Power (MWt): 3411 Notes:
  • Nameplate j
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000

' 6. Maximum Dependable Capacity (Gross MWe): 1171 MVA * .90 power j

7. Maximum Dependable Capacity (Net MWe): 1100 factor per Page ill, 3
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To ' hich Restricted, if Any (Net MWe): 4
10. Reason for Restrictions,if any:

This Month YTD ~ amulative

11. Hours in Reporting Period 672.0 1416.0 151176.0
12. Number of Hours Reactor was Critical 672.0 1416.0 112221.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 672.0 1416.0 111061.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2288632 4820278 353158561
17. Gross Electrical Energy Generated (MWH) 805588 1698355 121453196
18. Net Electrical Energy Generated (MWH) 778350 1640968 116187903
19. Unit Service Factor 100.0 100.0 73.5
20. Unit Availability Factor 100.0 100.0 73.5
21. Unit Capacity Factor (Using MDC Net) 105.3 105.4 67.3
22. Unit Capacity Factor (Using DER Net) 98.2 98.2 65.1 23, Unit Forced Outage Rate 0.0 0.0 11.4
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality :l j Initial Electricity l

' Commercial Operation l

i I

1 9903240009 990315 l PDR ADOCK 05000369 5*  !

l R PDR &  :

1 i

1 f

o 1

e g

  • a P

e c u n m e

r r u u S

/

c p n e ir o R T iau t t

n l a n e ui v t e

r n

a n o P

o MC - -

t n 2 4 i

o t

c m A a r

e c v S i

t c

/

i p )n e ri a

r r Tl o c p x C d l iaE t

d ou a n

a e

h t n m e a ut oe(r t h s

u a

MMAO

) - - -

9 C 2 9 ( 1 35 9 t 1 r

. d o p

y e s e .

S r a nR o N u r

e ic n t N W b e

L ev O F E D  :

T H h U T fo/ X t n

N n H O d R o i o

S o n M t a

T M he w t

o n T e i I

N R Md

)

t u

h t

m a

O x U 2 h S r E P

E

(

f o e s )

R n n e i a

n c o s i L

l p

s e g / x a g E e a n ( )

R t u in e roi n

)

1

( O iaiv r la r t r T aEp r x r

oi s roE(

t t

n t a n a r o s r ir e it r a u o e pd me pt h r

uH o N OA OO - -

D - -

9 s EFGH 9 m 6 d 9 a 4 d e 1 i l 1 .

l l

3 5-e u e 5 i e cr d 1

W 2 p o e )

9 ir 8 yF h c n

_ 6 u h r 3 T 3- G c e i

- r g - - S a 0

c a o 1 0 F - lp

_ 5MMR7 5

E x

t s

n o

(

OEEYE i

e e t c

r T NMTBNO u r i

r TA A

t e

t l

i a o s e

EN D D EH P D a f e c

r y

K CIT TE t

n na gro e

ON E L  :

n mel n int a DU L E y o p r t el u L

P T a s a

e q iuiun afge e o

m

_ M N m RE MRR

_ O u ) - - - -

C S 1

( ABCD

  • O ,

1 MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire Unit 1
2. Scheduled next refueling shutdown: September 1999
3. Scheduled restart following refueling: October 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE Ok LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety o,uestions?

5. Scheduled date(s) for submitting proposed licensing act on and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: JSJ (b) in the spent fuel pool: Bil
8. Present licensed fuel pool capacity: 1461 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

j, November 2005 DUKE POWER COMPANY DATE: March 15.1999 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

f l.

l

L. . .

Operating Data Report t-

! Docket No. 1QTQ

Date March 11.1999 l c Completed By Rocer Williams Telephone 704-382-5346 l

Operating Status

1. Unit Name: McGui.re 2
2. Reporting Period: Febn.ary 1,1999 - February 28, 1999
3. Licensed Dennal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1171 MVA * .90 power
7. Maximum Dependable Capacity (Net MWe): 1100 factor per Page 111,
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

EM20.

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions,if any:

His Month YTD Cumulative i1. Hours in Reponing Period 672.0 1416.0 131472.0

12. Number of Hours Reactor was Critical 672.0 1416.0 104789.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0

' 14. Hours Generator On-Line 672.0 1416.0 103622.3

15. Ur.it Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2190213 4718082 341577140
17. Gross Electrical Energy Generated (MWH) 773327 1663726 118979795
18. Net Electrical Energy Generated (MWH) 745809 1605576 114147719 )
19. Unit Service Factor 100.0 100.0 78.8

- 20. Unit Availability Factor 100.0 100.0 78.8

21. Unit Capacity Factor (Using MDC Net) 100.9 103.1 76.4
22. Unit Capacity Factor (Using DER Net) 94.1 96.1 73.6
23. Unit Forced Outage Rate 0.0 0.0 6.8
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Stanup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity t Commercial Operation

.s /

1 f

o m s

1 i

/

3 e

g ,

a c P 3 e

c n m e a r

r r c u S

/

c ip n e r to R T i a t

n l u e a ui n

v t e n a n r o P

o MC - -

t n 2 4 i

o t

c m A a r

e c v S p )n i /

t c

e i r

r Tl ri a

o cpx C

o a iaE t

d l d

n h u m (r a

e t n oe e a tut h s

u a

MMAO

) - - -

9 C 2 9 ( 1 35 9 t 1 r

. d op y e s e S r a nR o N u r

e c n N t

W b e

i L ev O F E D  :

T H h U T fo/ X t n

N n H O d R o n o i o

S M h M t a

w n T

t T e o e i I

N R Md

)

t u

h t

m a

x U O 2 h r E P

E

( S f

o e s )

R n n e i a

n s ic l p

o s e L x a g /

g E e a n ( )

R t i n r n _

) u ia v er aoi 1

( O r T aEp it rl r t r

r x oi s oE(

n t a n art o sr r ir e .

it a u o e pd meh pt r o uH N OA OO - -

D - -

9 s EFGH 9 m 6 d 9

1 a 4 d e l 2 .

i l

l 3

5-e u e 5 i e p cr d W 2 yF oh e r 1

)

0 iu hc re 8 7 3- T - S c i ri a

3- G r g 4 F -

0 c a o lp 0

5MMR7 S

E

(

x t

s i n

o OEEYE e e t c

r T NMTBN A O e l i

u ro i

t r

s e

TA DDE H EN P D t

a fa e t c r

y K

CIT TE n e agr n

nnt o ON EL  :

n mel ea L

L E i

y o p t l DU P T r

a s a i n u u m e quiaf ge e M N o

m RE-MRR - - -

O u )

C S 1

( ABCD

~

y

  • i e f MONTIILY REFUELING INFORMATION REOUEST l
1. Facility name: MgGuire Unit 2  !
2. Scheduled next refueling shutdown: March 1999
3. Scheduled restart following refueling: April 1999 THE PROTECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WIll NO LONGER BE MAINTAINED IN THIS REPORT. .

l

4. Will refueling or resumption of operation thereafter require a technical specification change or I other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 191  !

(b) in the spent fuelpool: 1932

8. Present licensed fuel pool capacity: 1451 Size of requested or planned increase: ---
9. Projected date oflast refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: March 15.1999 Name of

Contact:

R. A. Williams Phone: (704)-382-5346

<.