Rev 1 to Special Rept 91-11 Dtd 910411:on 910215,turbine Driven Auxiliary Feedwater Pumps Automatically Started. Caused by Deficient Communication & Lack of Attention to Detail.Pump Speed Reduced & Discharge Valves Closed
ML20081F737
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/04/1991
From: Mcconnell T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-11, NUDOCS 9106120018
Download: ML20081F737 (10)


Text

_ _ . _ _ . . . _ _ _ . _ . - . . _ - - . _ _ . _ _ _ _ _ _ _ . _ _ . _ . _ _ _ _ . . _ _ _ _ _ _ _ _ _

. . . . 11 1

' c:vtp:wn Is Mr n,1.py

% liwr % a lvar Sla :nc

'l??M* llatt ts h rey b%d llararwtic Vlw?p p>U i

OUKEPOWER June 4, 1991 i 0 t

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 i

Sub, lect McGuire Nuclear Station Unit I and 2 t Docket No. 50-369  !

Voluntary Special Report, Revision 1  !

e i  !

j Gentlemen:  !

i Attached is a revision to the Voluntary Special Report which was submitted on i April 10, 1991 concerning the Unit I and Unit 2 Turbine Driven Auxiliary Feodwater pumps automatically starting. This event is considered to be of no significance with respect to the health and rafety of the public.  ;

t

[

< Very truly yours,  !

$ X.hysl&4'f T.L. McConnell ADJ/NGA/cb1 Att4chment t I

xc: Mr. S.D. Ebneter Mr. Tim Reed Administrator, Region 11 U.S. Nuclear Regulatory Connission U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 101 Mariett a St. , NW, Suite 2900 Washington, D.C. 20555 l Atlanta, GA 30323 i Mr. P.K. Van Doorn I

, INPO Records Center NRC Resident Inspect.or l l Suite 1500 McGuire Nuclear Station 1100 circle 75 Parkway  :

l Atlanta, GA 30339 l l

I, 1

i 1

^

91661Nb18 910604 ADOC R 05000 96v, 'I FDR ,

s FDR ,

/J t:)',/s

s  !

1

( , , . L McGUIRE SAFEIT REVIEW GROUP INPLANT REVIEW REPORT 1

[

}

1. rep 0RT NUMBER: 91-11t Revision 1  !

4

! 2. DATE OF REVIEW: February J 91,_

3. SUBJECT DESCRIPTION
On February 15, 1991, Instrument and Electrical (IAE) personne'. were performing preventative Maintenan(c (PM) work l request 08068C on inverter SKSS. In the process of performing this work,
1AE Specialist A discovered a frequency detector board that had I malfunctioned. This prevented the inverter from being returned to normal ,

1 operation. After consultation with IAE Supervision, it was decided to  ;

replace the defective frequency board on February 21, 1991. To replace f 1

this board requires thac SKSS be completely de energired. At i l approximately 1230, a Nuclear Operations (OPS) Specialist (NLO) was i dispatched to de-energire SKSS. The NLO opened the alternate f eeder 1

breaker to SKSS, located on Motor Control Center (MCC) SMXG at t approximately 1250. This action resulted in a loss of power to power  !

]. panel board KXS shich supplies control power to the Standby Shutdown i Facility (SSF) control papel. When the SSF control panel was  !

de-energized, it caused all eight (four per unit) steam generator (S/G) level indications to fail in the low direction. Units 1 and 2 Turbine i Driven (T/D) Auxiliary Feedwater (CA) pumps automatically started on a one of one low level signal in two of four Steam Generator (S/0) logic f rom f

the SSF (see page 9). OPS personnel took action to stop the Unit I i

cooldown and injection of CA to the Unit 2 S/Gs by reducing pump speed and i l closing the CA to S/G discharge valves. lAE personnel finished replacing  !

the f requency board and OPS personnel restored power to KXS at  ;

! approximately 1405. OPS personnel notified the NRC of an Engineered  !

Safeguards Teature Actuation (ESFAS) and returned the CA system to standby L readiness. ,

l 0 4

L

_ . - _ - ~ _ . _ _ _ . - _ . _ _ _ _ . . . _ _ . ~ . _ _ . _ _ _ . _ _ _ _ __.-.. _ ..- ..~.- -._ _ _

i l

) '- DpC/NNS Inplant Review No. 91 11, Revision 1 l ,

l' age 2

4. EVAL,UATION AND COMMENT:

i Backgrgu!!!!

l

The CA system is provided as a backup for the Main Feedwater System (CF).

l It is designed as 2 means to remove heat from the Reactor Coolant System l (NC) when CT is not available, The CA system contains two motor drive:n j

l (H/D) pumps, one T/D pump and their associated piping, valves and  !

controls. The T/D CA pump is capable of supplying auxiliary feedwater to  ;

all four S/Gs.  !

l The SSF is a separate building located within the Protected Area. Thfu j facility houses the equipment and cont rols necessary f or OPS personnel to l achieve and maintain one or both units in a flot Standby condition. This I j facility is used only as a last resort when the preferted controls (the l Control Room controls and t'ie Auxiliary Shutdown Panel controls) have been j rendered inoperable due to a severe fire or sabotage event. Equipment and {

controls within the SSF are referred to as the Standby Shutdown System

(SSS). The function of the SSF is not considered nuclear safety related  ;

j and is not seismically qualified, All SSS interfaces with Safety Related (

(Quality Assurance (QA) condition 1) control loops and equipment are I h isolated from the SSF by QA condition I isolation devices. The SSF also

, houset. the 250/125 VDC Standby Shutdown Facility Auxiliary Power System which supplies power to various security components and the SSF control panel, Description of Events On February 14, 1991, at approximately 1051, OPS personnel removed

security inverter SKSS from service for IAE personnel to perform work request 08068C PM. OPS personnel removed inverter SKSS from service by procedure OP/0/B/6350/07, 250/125 VDC Standby Shutdown Facility Auxiliary Power, Enclosure 4.20. This action placed all inverter loads on the alternate power supply, MCC SMXG. Power to inverter SKSS f rom distribution center SDSP was red tagged open in accordance with Removal and Restoration (R&R) sheet 01-146.

l l

4 .

e l 1 DPC/ttNS Inplant Review No. 91 11, Revision 1 4 j Pcte 3 4

On february 15, 1991, IAE personnel requested that OPS personnel place l l SKSS inverter back to normal operation so they could functionally verif y {

the work performed on SKSS inverter. OPS personnel attempted to place l

SKSS inverter in operation by procedure Op/0/B/6350/07 Enclosure 4.19. j The alternate source off frequency indication light did not go out as '

expected. This prevented placing SKS$ inverter in service. IAE l

Specialist A reported the problem to his supervision and after discussion i with McGuire Engineering Services (MES) personnel, it was determined that the problem was caused by a bad frequency relay or circuit board. Repair of the alternate source off frequency indication would require that the SKSS inverter loads alternate power source be de-energized. [

i On February 18, 1991, IAE Specialist B informed Security personnel of the  ;

problem with SKSS inverter. Together, t hey researched the elect rical one

{

line drawings and a Design Engineering list to determine the effect }

de-energizing the SKSS inverter loads would have on Security.  :

On february 21, 1991, Unit I was in Mode 3 (llot Standby) and OPS personnel  !

were making preparations to perform a Reactor startup. Unit 2 was in Mode 1 (power Operat. ion) at 100 percent power.

I

At approximately 1130, IAE Specialist H contacted ops Supervisor A and
requested that the alternate power supply to SKSS inverter be de-energized. IAE Specialist. B stated that at this time he informed ops i l Supervisor A that the SSF would be affected when the alternate power '

supply to inverter SKSS was de-energized. OPS Supervisor A told IAE Specialist B that he did not know anything about the work to be performed on SKSS. OPS Supervisor A then contacted the ops Shift Supervisor and the .

Control Room SRO and asked them 11 they knew anything about the work to be ,

, done on SKSS inverter. They did not know of any work to be performed on  ;

SKSS inverter. ops Supervisor A then contacted Integrated Scheduling f

personnel A to see if he was aware of the work to he done on SKSS ,

inverter. Integrated Scheduling personnel A stated that he was not aware [

of the work to be done but he would check into it and get back to Ops l Supervisor A.

i.

5 i

4 DpC/MNS Inplant Review No. 91-11, Revision 1 page 4 At about 1215, Integrated Scheduling personnel A saw IAE Specialist B in the Control Roorn and remembered that he was supposed to check on the SKSS work. lie had forgotten about SKSS due to being preoccupied with the 11 nit I startup. At this time, IAE Specialist B stated that he informed

, Integrated Scheduling personnel A that it would affect the SSF control panel.

At approximately 1220, Integrated Scheduling personnel A checked the weekly schedule for work to be performed, lie saw that work request 08068C was on the schedule for that night. Integrated Scheduling personnel A then contacted Security personnel to find out if they were aware of the work to be performed on inverter SKSS. Security personnel stated they were aware of the work to be performed. Integrated Scheduling personnel A decided that the work on inverter SKSS could be performed at this time.

At approximately 1225, Integrated Scheduling personnel A contacted ops Supervisor A and told him he could proceed with de-energizing inverter SKSS alternate power supply.

At about 1230, ops Supervisor A dispatched an NLO to the SSF to open the alternate power supply to SKSS inverter loads and to standby as a human red tag until the work by IAE personnel was completed. The NLO was also instructed to phone IAE Specialist B in the Computer Room so the Security computer could be shutdown prior to de energizing SKSS inverter loads.

At approximately 1250, the NLO called I AE Specialist B and informed him that he was ready to de-energize SKSS inverter loads. The NLO then opened the SKSS inverter loads alternate power supply located on MCC SMXG. This action resulted in a loss of power to power panel board KXS which supplies power to the SSF control panel. When the SSF control panel was de-energized, all eight (four per unit) S/G wide range level indications failed in the low direction due to the loss of power. Units 1 and 2 T/D CA pumps automatically started when the one of one low level signal from two of four S/G logic from the SSF was satisfied.

I

$ 0

. . t

, DPC/MNS l Inplant Review No. 91 11, Revision 1 l Page 5  !

1 OPS Control Room Operators (CRO) reduced the speed on the T/D CA pumps and closed the CA discharge valves to the S/G to limit the init I cooldown and I to stop CA flow to tinit 2. l t

i At 1405, IAE personnel completed repairs to the SKSS inverter frequency j indication and the NLO reclosed the SKSS inverter loads alternate power '

st.pply f rom MCC SMXG. OPS Chos stopped the T/D CA pumps and realigned i Unit I and Unit 2 CA systems to standby readiness. f

5. CONCLUSION: 1his incident is assigned a cause of Deficient Communication [

And a Lack of Attention to Detail. Deficient Communication occurred I because IAE Specialist 11 stated that he informed OPS Supervisor A the SSF  !

would he affected. OPS Supervisor A stated he was not informed by IAE [

Specialist 11 that the SSF would be affected. Integrated Scheduling  !

personnel A also failed to inform OPS Supervisor A the SSF would be affected. Lack of Attention to Detail occurred because IAE Specialist B  ;

failed to determine the ef fect de-energizing the SKSS inverter loads alternate power supply would have on the SSF Control Panel. OPS ,

Supervisor A looked at the electrical (ne line drawing for SKSS inverter '

and knew SST instrumentation would be de-energzied. OPS Supervisor A .

f ailed to determine the instrumentation to be de-energized and the ef f ect f de-energizing this instrumentation would have on the T/D CA pumps.

A mitigating circumstance is that SKSS and associated equipment is thought ,

of as security equiprr.ent because the majority of the loads supplied by l i

SKSS inverter are security components. This may have lead OPS and IAE [

4 pers*>nnel into a false confidence that no equipment of concern to OPS I personnel would be affected when SKSS invert-r loads alternate ,~wer supply was de-energized.

i A potential deficiency was identified during this investigation because .

electrical one line drawing MC 1750-03.01 does not show a complete connection between Distribution Center SDSP, MCC SMXG, Inverter SKSS, and  ?

l Power Panel Board KXS. This arrangement is required for the protection of safeguards information but was not a factor during this incident. In order to mitigate the possible re-occurrence of a similar incident , MC i

a

i DPC/MNS Inplant Review No. 91-11, "evision 1 P4 ge 6 1750+03.01 will be changed to show a complete connection between 3 appropriate components or notes will be added to ensure adequate groups

, interface.

The incident did not cause any significant operational problems or difficulties. There was a slight cooling of the NC system on Unit I due 3

to the injection of the colder CA water to the S/G but this was controlled l

, by OPS personnel taking appropriate corrective actions.  !

A review of Problem Investigation Reports (PIRs) for the previous i twenty-four months prior to this event revealed no incidents concerning an  :

EST actuation with a cause of Deficient Communications or a cause of Lack l

of Attention to Detail. However, the review did reveal two incidents in which CA pumps were automatically started due to Inappropriate Actions.

These were documented on LER 369/89-09 and LER 370/89-25. These incidents ,

were of a different nature; therefore, this incident is not considered to i t

be recurring. ,

McGuire OPS personnel notified the NRC of this incident by procedure i RP/0/A/5700/10, immediate Notification Requirements. After discussion with the OPS Support Manager, McGuire Nuclear Station Management does not  !

consider this incident to be an ESF Actuation based upon the following ,

rea sor.s :

1) The SSF and related components are not nuclear safety related, f l

I

2) The SSF components that interface with nuclear safety related l components are isolated by means of QA condition 1 isolation devices. ,
3) Power supplies from the SSF are not nuclear safety related.
4) The signal that actuated the T/D CA pumps does not go through

! the SSPS.

[

_ _ _ - - - - - . ~ . _ . _ . _ _ _

4 i DPC/ttNS Inplant Review No. 91-11, Revision !

Page 7 l $) An EST component (T/D CA pump) was actuated by a non-ESF signal from the SSF. This in not a valid or i.purious ESF signal.

6) The signal from the SSF actuated the T/D CA pump via solenoids that are not safety related.

a

7) The ESF logic ter automatic r. tart of the T/D CA pumps on S/G l level is two out of four low-low level alarms in two S/0. The logic that actuates the T/D CA pumps from the SSF is one of one wide range level low alarm in two of four S/G.  ;
8) The auto start signal from the SSF is not redundant as required i for ESF signals.

This incident is not reportable to the Nuclear Plant Reliability Data System (NPRDS).

I There were no injuries, radiation overexposures, or uncontrolled  :

radioactive releases as a result of this incident.

I

5. CORRECTIVE . ACTIONS:

k Immediate: 1) OPS personnel reduced T/D CA pump speed and closed CA 1 discharge valves to the S/Gs. i

2) OPS personnel implement ed the NRC Immediate Notification Requirements procedure, RP/0/A/5700/10.

! Subsequent: 1) OPS personnel restored power to KXS pcwer panel board.

2) OPS Supervisor A vent to the SSF and verified that the NLO had opened the correct breaker.
3) OPS personnel stopped the T/D CA pumps and re-aligned Units 1 and 2 CA systems to standby readiness.

l

DPC/MNS Inplant Review No. 91-11. Revision 1 I Pa,ge 8 l i

Planned: 1) OPS Management will submit a Station Problem Report I (SPR) and propose a change to electrical one lint drawing MC 1705-03.01 to show connections between )

Distribution Center SDSP, MCC StiXG, inverter SKSS, and j Power Panel Board KXS, and to add appropriate notes to ensure adequate groups interface.

1

, 2) OPS Management will conduct lessons learned training to inform all Operations personnel ot' lessons learned from the incident.

4 b

3) IAE Management will add a special instruction to work request 08008C PM to alert IAE personnel to the danger  !

of de-energizing normal and alternate power supply to i i

SKSS inverter.

4) lAE Management will review this incident with 1AE A

personnel.

6. SAFETY ANALYSIS: Unit I was in Mode 3 (Hot Standby) preparing for Reactor i

startup at the time of this incident. OPS personnel took appropriate corrective action by closing the T/D CA pump discharge valves to the S/G thereby limiting the NC system cooldown.

Unit 2 was in Mode 1 at 100 percent power at the time of this incident. ,

OPS personnel took appropriate correr.tive action by reducing T/D CA pump t speed, thereby placing the pump in the recirculation mode.

During the time period of this incident both T/D CA pumps ran for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 15 minutes. No other ESF equipment was affected.

At no time was the Unit I and 2 T/D CA pump inoperable or incapa'ule of performing the design function of the pump.

Unit I and Unit 2 M/D CA pumps were operable and capable of performing their design function for the duration of this incident. Therefore,

e DPC/MNS Inplant Review No. 91-11, Revision 1 Page 9 during this incident, the operation of the T/D CA pumps did not adversely af fect any of the Unit 1 or Unit 2 equipment or systems.

This incident did not af fect the health and safety of the public.