ML20195K369

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2
ML20195K369
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 05/31/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20195K366 List:
References
NUDOCS 9906220071
Download: ML20195K369 (6)


Text

Operating Data Report Docket No. 50-369 l Date June 14.1999 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: McGuire 1 l
2. Reporting Period: May 1,1999 - May 31,1999 l
3. Licensed Thermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power
7. Maximum Dependable Capacity (Net MWe): factor per Page 111, 1100 )

0.

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If A,.v (Net MWe):
10. Reason for Restrictions,If any:

'Ihis Month YTD Cumulative

11. Hours in Reporting Period 744.0 3623.0 153383.0
12. Number of Hours Reactor was Critical 744.0 3623.0 114428.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 3623.0 113268.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2531375 12332244 360670527
17. Gross Electrical Energy Generated (MWH) 885562 4335541 124090382
18. Net Electrical Energy Generated (MWH) 853999 4185311 118732246
19. Unit Service Factor 100.0 100.0 73.8
20. Unit Availability Factor 100.0 100.0 73.8
21. Unit Capacity Factor (Using MDC Net) 104.3 105.0 67.8
22. Unit Capacity Factor (Using DER Net) 97.3 97.9 65.6
23. Unit Forced Outage Rate 0.0 0.0 11.2
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown A! End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electrb 'y Commercial . Oeration 9906220071 990614 PDR ADOCK 050003 9 3A 6/14/99 R

1 f 9 o 8 4

1 n

6 e

g -

a c P 3 e

c n m e a r

r c r S u /

c ip n e r o R T iau t t

n l a

e u n v

e r

n a n it o -

P o MC - -

t n 2 4 i

o t

c m A a r

e c i

v S t /)

ipn d ri u

u Tl a p C itcx .

d d

ol a aE _

n ht u m (r _

a e

n oe e a tut h s

u a

MMAO

) - - -

C 2

( 1 35 tr _

9 d o p

9 e s e .

S 9 1 nR o N .

e c n Nt y

W a i

L ev O M E _

D  : _

T H T fo/ X h _

U N t

n n H O d R o o _

S o n M i

t a

T M h e ow t n T e i I

N R Md

)

t u

ht m a

O 2 h r x U P ( S o E E f e s )

R n n e

c i

a n s i l p

o s e L x a g /

g E e a n ( )

R t u ian ev roi n

) i r a 1

( O r d r l T aEp r r x r t oi s oE a t a nt a (r c s. r i r e i

t a

r t o e pd meh pt r

uH o N OA OO D - - - -

s EFGH 9 m 6 d 9

9 ia l

4 3

de eu l

i 1 5- e cr d m 4. Wil 2 p o e )

9i 8 yF h n 6 u 1 r 3 e T - Sc i a

3- G e -

c n r o 4 F - l p

0 5MJ u R 07 S E

x t

n o

. : : : : ( s i OEEYE eT e t c

NMTBNO r u r i

r TA A

t e l i o s e

fa e t

EN D D EH P D a

c r

y K T t

TE n e na gr CI EL nnt o ON L E y n o pmel el i

a DU L P T r

a a uiun s i t

afg u

m e q e e M- N o.

m RE-MRR O u ) - - -

C 8 S .

1

( ABCD

l 1

MONTHLY REFUELING INFORMATION REOUEST l

1. Facility name: McGuire Unit 1
2. Scheduled next refueling shutdown: Scotember 1999
3. Scheduled restart fo.llowing refueling: October 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. ,

l

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? '

l If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee f regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information. f
6. Important licensing considerations (new or different design or supplier, unreviewed design or [

performance analysis methods, significant changes in design or new operating procedures). j

7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 321
8. Present licensed fuel pool capacity: 1461 Size of requested or planned increase: =

I

9. Projected date of last refueling which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: June 14.1999 Name of

Contact:

B. A. Williams Phone: (7(M)- 382 5346  !

1 I

i I

l i

I

{

l t

i

1 Operating Data Report Docket No. 50-370 Date June 14.1999 Completed By Roser Williams Telephone 704-382-5346 ODerating Status

1. Unit Name: McGuire 2
2. Reporting Period: May 1,1999 - May 31,1999
3. Licensed 'Ihermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossML)
5. Design Electrical Rating (Net Mwe): 1180 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1144 MVA * .90 power
7. Maximum Dependable Capacity (Net MWe): 1100 factor per Page 111,  ;
0. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, if Any (Net MWe):
10. Reason for Restrictions,If any: __

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 3623.0 133679.0
12. Number of Hours Reactor was Critical 744.0 2842.4 106215.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 2822.6 105028.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2535043 9190989 346050047
17. Gross Electrical Energy Generated (MWH) 888958 3231814 120547883 l
18. Net Electrical Energy Generated (MWH) 857376 3105501 115647644
19. Unit Service Factor 100.0 77.9 78.6  ;
20. Unit Availability Factor 100.0 77.9 78.6 l
21. Unit Capacity Factor (Using MDC Net) 104.8 77.9 76.2
22. Unit Capacity Factor (Using DER Net) 97.7 72.6 73.3
23. Unit Forced Outage Rate 0.0 0.0 6.7
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A . 6/14/99

i r m o 4 1 n 6

e g -

a c 3

P e

c n m e a r _

r r c _

u S

/

c ip n e r o R T iau t _

t n l a n e ci v n t e a n

~ r o P

o MC - - .

t _

n 2 4 -

i o

t c m A a r _

e c i

v S

/ _

i ip )n w ri _

Tl ap _

m icx C d l t aE d

n o a ht u m (r a n oeh t e e a ut _

MMAO s

u a ) - - -

C 2

( 1 35 -

t r

1 V de po S 9 s e .

1 nR e oN N .

c n t -

y W a i

L ev O M E _

D  : _

T H h _

T U fo/ X t n n N o o H O d R i hto n S M M t a

n T T e ow e i I

N R O

Md

)

2 h t

u h

t r

m a

x U P ( S o E E f e s )

R n n e i a _

n c -

o s i L

l p

s e g /-

x a

e a n E

( )

R t u

i ina ev oi r n

) r a 1

( O r i r l T aEp t

r x r

oi t

s troE (

n t ai n a r o s r r e i r t

a u o e pd pt meh r o uH N OA OO D - - - - _

s EFGH 9 m 6 d 9 i a 4 d l e

2 9 l 3 5-e u 1 d e cr d e e p o _

0i u 4.

r 1

Wr 2 8 yF h c )

n 7 3- T _

3- G e e i

g - S a _

c n o 4 0 F - l p

0 u 5 M J R 7 S x n

. : : : : E(

t s i o

OEEYE e t c

NMTBNO eT r i r

lu r TA A t

a o e s e

i EN DDE H t

a f e r K P D c y CIT t

T E n e agr n

E L n nt o ON L E  :

y n o pmelia DU L P T r

a s a iuiaf t

n uel ug o

m e q e e M N m R E- -MRR - -

O u )

C S II 1

( ABCD

o h(ONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire Unit 2
2. Scheduled next refueling shutdown: Aunust 2000
3. Scheduled restart following refueling: October 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblics (a) in the core: 391 (b) in the spent fuel pool: 11J2
8. Present licensed fuel pool capacity: 14fd Size of requested or planned increase: =
9. Projected date of last refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: June 14.1999 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 J