ML20198D756
| ML20198D756 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 11/30/1998 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20198D754 | List: |
| References | |
| NUDOCS 9812230201 | |
| Download: ML20198D756 (10) | |
Text
.
i OPIRA71XG DATA IIP 0tf DOCIIT N0 50 369 DATI Decesher 15, 1998 OPIRAflIG STATUS COMPLITID BY N.A. Villians
?!LIPHONI 704-382 5346
- 1. Unit Nase: McGuire 1 2.ReportingPeriod:Rovesbar1,1998 November 30,1998 3.LicensedtherealPower(MNt):
3(11
- 1. Neseplate lating (Gross He):
1305' Notes 96seplate Rating 5.' Design Ilectrical lating (Net He):
1180 (GrossNNe)calculatedas 6.MasistsDependablecapacity(GrossNVe):
1171 1450.000 NVA z.90 power
- 7. Nazisus Dependable Capacity (Net He):
1100 factorperPage111, 8.IfChangesoccurincapacitytatings(!tessNumber3Through7)SlaceLast'
'NtIG0020.
Report.Givelessons:
- 9. Power Level To Xbich testricted, If Any (Net He):
10.ReasonFortestrictions,Ifany:
ThisMonth fr. to Date Custlative j
- 11. Hours In leporting Period 120.0 1016.0 149016.0 12.RusberofHoursteactorWasCritical 720.0 7187.9 110061.0 13.teactorleserveShutdownHours 0- 14.HoursGeneratorOnLine 720.0 7146.1 108901.7 15.UsitteserveshutdownRours 0- -
0--
16.GrosstherealInergyGenerated(HH) 2151067 23801060 345803101
- 17. Gross Ilectrical Energy Generated (HH) 859609 8264478 118862712 18.NetIlectricalInergyGenerated(NVH) 828629 1955453 113685755 19.UnitServiceFactor 100.0 89.2 13.1 20.UnitAvailabilityFactor 100.0 89.2 73.1 21.UnitCapacityFactor(UsingMDCNet) 104.6 90.2 66.8 22.UnitcapacityFactor(UsingDItNet) 97.5 84.1 64.7 23.UnitForcedOutagelate.
0.0 0.8 11.6 24.'Shitdova$cheduledOverNext6 Months (Type,Date,andDurationofItch):
None 25.IfShutDownAtIndoftoportPeriod.IstinatedDateofStartup: None 26.UnitsInTestftatus(PriortoConsercialOperation):
Forecast Achieved l
INITIAL CRITICAL 17T INITIALILICTRICITT C0HIRCIAL OPERATION 9812230201 981215 I
PDR ADOCK 05000369 f R
PDR j
OPIRATINGDATAIIP0tf f
DOCIIT N0 50 369 UNIT
'Mecaire 1 Daft Deceahar 15, Illi COMPLIftD Bf 1.L Ill11ans TILIPHONI 704 382 5345 MONTH Moranhar,'1998 L
}&1 AVit4GI DAILY POWit'LIVIL 011
'AVIRAGI DAILY POIII LIVIL.
(NoItt)
- (No Net) 1-1142 17 1152 2
1144 18 1151 l-3 1143 19 1153
(
1145 20 1155
$~ >
1146 21 1154 6=
1146 22
-1154
-7 1149 23-1156
'~
1152
- 24 1156 8
9 1152
. 25 1154
- 10 1137 26 1156 s
11 1153 27 1155 12 1151 28 1156
- 13 1140 19 1157-li 1155 30 1158
~ 15 ~
1154 I-
!!6 1153 I:
I s
V m
M h
w t
="
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME Mt;uulnis 1 DATE 12/1d/su REPORT MONTH November 1998 COMPLETED BY K.
A.
williams TELEPHONE tsus; suz-d.sso (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS-N R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS
'OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operritor Training & License Examination F-Aministrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
s MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire Unit t l
2.
Scheduled next refueling shutdown: September 1999 3.
Scheduled restant following refueling: @tober 1999
[
Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
l If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
. Scheduled date(s) for submitting proposed licensing action and supporting information.
l 6.
Important licensing considerations (new or different design or supplier, unreviewed design or l
performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 192 (b) in the spent fuel pool: 32.1 8.
Present licensed fuel pool capacity: 14M Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: December 15.193 Name of
Contact:
R. A. Williams Phone: (704) - 382-534f 4
h.
l l
s' 4
DOCKET: 50-369
. UNIT: McGuire 1 Date:
12/15//0 NARRATIVE
SUMMARY
~ MONTH: November,1998 McGuire Unit 1 began the month of Novemt.cr operating at 100% full power. The unit operated at or near 100% full power for the entire month.
Prepared by: R. A. Williams Telephone:(704)- 382-5346 f
e n
v gy y-s9 p
p.w, op yg--
p
.-se
w-y, r
w
_~.-
M
~ n 0 PIRATING DATA IIP 0tf DOCIIT NO 50 370-DATE December 15. 1998 OPERAf L STATUS COMPLITID BT t.1,V1111ans TILIPHONI 704 182 5H6 1.UnitNase:McGuire2 2.JeportingPeriod:Notenber'1,'1998Noresher 30, 1998 3.LicensedThermalPower(NWt):
3(11
(.lastplatelating(GrossMVe):
130$'
Notes 'Naseplate lating 5.DesignIlectricallating(NetNVe):
1180 (GrossNWe)calculatedas 6._MaIlsas Dependable Capacity (Gross MVe):
1171.
1450.000MVAI.90 power
- 7. Nazisus Dependable capacity'(Net NWe):.
1100 factorperPageill,
- 8. If Changes occur in O pacity Ratings (Itess Insber 3 through 7) Since Last NURIG-0020.
Report.'Giveleasons:
9.PcntLeveltoVhichtestricted,IfAny(NetNVe):
10.tensonfortestrictions,Ifany:
ThisMonth Tr. to Date Cusulative
.11. Hours In Reporting Period 720.0 8016.0 1~9312.0
'12.NusberofBoursteactorlasCritical 720.0 7982.7 102629.1 13.teactorReserveShutdownHours --0--
- 14. Hours Generator On Line 720.0 7971.7 101462.3 15.UnitReserveshutdownHours - 16.GrossThersalInergyGenerated(MVH)-
2451324 2707)523-334323509 17.GrossIlectricalInergyGenerated(MVH) 858180 9409996 116(25404
- 18. Net Ilectrical Inergy Generated (NVH) 8,7457 9069222 111683092
- 19. Unit'Servicefactor 100.0 99.5 78.5 20.UnitAvailabilityFactor 100.0 99.5 78.5 21.UnitCapacityyactor(UsingMDCNet).
104.5 102.9 16.0 l
22.Unitcapacityfactor(UsingDItNet) 97.4 95.9' 73.2 l
23.UnitforcedCatagelate 0.0 0.6 6.9 f
24.ShutdownScheduledOverNext6!caths(fype,Date,andDurationofIach):
-Refuelino
~ March 12, 1999 - 35 days 25.IfShutDownAtEndofleportPeriod.IstinatedDateofStartup: None 26.UnitsInfestStatus(PriortoConsercialOperatien):
Forecast Achiefed i
INITIAL Cilf!CALIff INITIALILICft! CITY COMMItCIALOPIRATION
= r e
i-i OPERATING DATA RIPORT l
'DOCIIT NC
$0 370 UNIT Rectilte 2 DATI Decesher 15,1998 COMPLIf!D BY I.1. Villians TILIPHONI 704 382 53(6
.l HONTE Eavanhar,1998 El AVIRAGI DAILY Pollt IIVIL
.El AVIRAGI DAILY POvit LIVIL (HeItt)
(HeNet) i 1
1141 17 1152
'2-1143 18 1151 3
1111 19 1153 4-1143 20 1151
'5 1148-21 1153 i
1115 22 1152 7
1147 23 1153 8
1150' 24 1153
'9-
'1151 25 1152 10 1152 26 1154 11 1152
,27 1171 12
'1149 28 ~
1153 13 1151 29 1154
- 14 1153 30 1155 15 1153
- li 1153 1.
r r
y
~. -
T'
' UNIT. SHUTDOWNS'AND POWERI REDUCTIONS' DOCKET NO.-
50-370-UNIT NAME-muuy1xr,2 DATE 12/13/su
~
REPORT MONTH Nove'mber 1998 COMPLETED BY.
x.
A.
williams -
TELEPHONE-tiusi-3sz-dase (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE i
O P
DURATION O
WN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
RX NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S i
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equi 6 ment Failure (Explain) 1-Manual for Preparation of Data ' '
B-Maintenance or test 2-Manual Scram Ent w Sneets For Licenseei C-Refueling 3-Automatic Scram Event Report (LER File. (NUREG-0161) )
.D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative (5)-
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other t
.T-.
m
. - -.-. m
.a-. -
.. ~..
- -..... ~.. - -.
4 MONTHLY REFUFI JNG INFORMATION REOUEST 1.
Facility name:
MsOv're Unit 2 l
2.
Scheduled next refueling shutdown: March 1999 3.
Scheduled restart following refueling: April 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what wi!! these be? '
l If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
l 6.
Important licensing considerations (new or different design or supplier, unreviewed design or l
performance analysis methods, significant changes in design or new operating procedures).
l
'i.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 1D3.2 8.
Present licensed fuel pool capacity: 1461 Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
1 June 2003 DUKE POWER COMPANY DATE: December 15.1991 l
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 I
i.
l s
s a
- ~
f i
i l
i
.~, -,..,_
..g,
L
.i e.
DOCKET: 50 - 370 UNIT: McGuire 2 l'
Date:
12/15/98
.I NARRATIVE
SUMMARY
t MONTH: November 1998 i
i McGuire Unit 2 began the month of November operating at 100% full power. The unit operated at or near j
100% full power for the entire month.
i I
i l-I.
i:
l l
I '.
i Prepared by: R. A. Williams Telephone: (704)- 382-5346 1
y y
, _ -