RO 369/83-85 & 370/83-50:re Potential Deficiency of Seals at Conduit Connections to safety-related Equipment Located in Harsh Environs.Util Intends to Apply Dow Corning RTV 3145 Sealant to Conduit Fittings to Correct Deficiency
ML20082C023
Person / Time
Site: McGuire  Duke Energy icon.png
Issue date: 10/27/1983
From: William Orders
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-369-83-85, NUDOCS 8311210404
Download: ML20082C023 (1)


Text

DUKE POWER GOMPANY P.O. DOX 33180 CHARLOTTE, N.C. 28242 IIAL H. TUCKER TELEPitONE m po4) ora-4 sat

. . . . . - - . October 27, $$ g g p 7 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region 11 101 Marietta Street NW, Suite 2900 Atlanta, Georgia 30303 Subj ect: McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369 and 50-370 LER/RO-369/83-85 and 370/83-50

Dear Mr. O'Reilly:

My letter of October 14, 1983 submitted Reportable Occurrence Reports R0-369/83-85 and 370/83-50 which dealt with a potential deficiency of seals at conduit connec-tions to safety-related equipment located in harsh environments. As part of the corrective actions given in the report it was stated that Duke intends to apply Dow Corning RTV 3145 sealant to the conduit fittings of the equipment to ensure that moisture will not penetrate the equipment / cable interface. Unit I was to be shutdown the weekend of October 29, 1983 to install the sealant, with Unit 2 shutdown scheduled for the weekend following return to service of Unit 1. However Unit 2 was inadvertently tripped October 26, 1983, and due to various plant consid-erations the decision was made to maintain Unit 2 in the shutdown condition in order to install the sealant. Therefore Unit I will now be shutdown to install the seal-ant the weekend following return to service of Unit 2 instead of prior to Unit 2 shutdown as stated in the report.

Very truly yours,

/B.fdQ/p Hal B. Tucker PBN:j fw cc: Document Control Desk Mr. W. T. Orders U. S. Nuclear Regulatory Commission .NRC Resident Inspector Washington, D. C. 20555 McGuire Nuclear Station l

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339- l l

8311210404 831027 Q'#yylC)h*