September 2003 Monthly Operating Report for Turkey Point Units 3 & 4
ML032940621
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/09/2003
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-256
Download: ML032940621 (3)


Text

OCT 0 9 2003 FPL L-2003-256 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - September 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry Ooe Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 10/02/2003 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period September, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 -

Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 720.0 5784.8 200324.2 No. of hours generator was on line (service hours) 720.0 5742.8 197951 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 504925 3913933 129273010 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operatina Experience Unit 3 operated at essentially 100% power until September 29 when power was reduced to approximately 90% due to reduction in condenser vacuum. Unit 3 returned to 100% power on September 30.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 10/02/03 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period September, 2003 Design Electrical Rating (MWe-Net) 720 ^ 1  ::- _ _;;,

' ,_ , ' _ l -

Maximum Dependable Capacity (MWe-Net) 693 ,

Month Year-to-date Cumulative No. of hours reactor was critical 720.0 6551 197913.7 No. of hours generator was on line (service hours) 720.0 6551 193496.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 492460 4557716 127516806 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E- Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Oneratinq Experience Unit 4 operated at essentially 100% power until September 21 when the unit initiated a Tavg/Power Coastdown in preparation for the refueling outage.

Text

OCT 0 9 2003 FPL L-2003-256 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - September 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry Ooe Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 10/02/2003 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period September, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 -

Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 720.0 5784.8 200324.2 No. of hours generator was on line (service hours) 720.0 5742.8 197951 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 504925 3913933 129273010 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operatina Experience Unit 3 operated at essentially 100% power until September 29 when power was reduced to approximately 90% due to reduction in condenser vacuum. Unit 3 returned to 100% power on September 30.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 10/02/03 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period September, 2003 Design Electrical Rating (MWe-Net) 720 ^ 1  ::- _ _;;,

' ,_ , ' _ l -

Maximum Dependable Capacity (MWe-Net) 693 ,

Month Year-to-date Cumulative No. of hours reactor was critical 720.0 6551 197913.7 No. of hours generator was on line (service hours) 720.0 6551 193496.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 492460 4557716 127516806 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E- Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Oneratinq Experience Unit 4 operated at essentially 100% power until September 21 when the unit initiated a Tavg/Power Coastdown in preparation for the refueling outage.