L-2003-120, April 2003 Monthly Operating Report for Turkey Point Beach Units 3 & 4

From kanterella
Revision as of 14:25, 22 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
April 2003 Monthly Operating Report for Turkey Point Beach Units 3 & 4
ML031420456
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/14/2003
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-120
Download: ML031420456 (3)


Text

Text

A

  • 1

,gI 47i1 3 L-2003-120 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - April 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the April 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, TerryO. e 6 Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

5' an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 5/5/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period April, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 R

-V Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 668.2 2149.4 196689.2 No. of hours generator was on line (service hours) 668.2 2115.8 194324.3 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 478762 1393410 126752487 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthiv Operating Experience Unit 3 returned to power operation from its cycle 20 refueling outage on 3/28/03, and completed its power ascension to 100% on 4/1/03. Unit 3 then remained at essentially 100% power until 4/28/2003. On 4/28/03, Unit 3 performed a manual reactor shutdown to repair CV-3-200B and remained shutdown for the remainder of the month of April 2003.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 5/5/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period April, 2003 Design Electrical Rating (MWe-Net) 720 I h"Zfi'5171- lii id -0 "

Maximum Dependable Capacity (MWe-Net) 693 + MI R Month Year-to-date Cumulative No. of hours reactor was critical 719 2879 194241.7 No. of hours generator was on line (service hours) 719 2879 189824.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 502708 2023267 124982357 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of April 2003, except for a unit reduction of power on 4/10/03 for turbine valve testing. Unit 4 returned to 100% power on 4/11/03 and remained at essentially 100% for the remainder of the month of April 2003.