October 2003 Monthly Operating Report for Turkey Point, Units 3 and 4
ML033290351
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/17/2003
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-284
Download: ML033290351 (3)


Text

NOV 1 7 2003 FPL L-2003-284 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - October 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 11/04/03 COMPLETED BY: Linda Tudor TELEPHONE: *(305) 246-6408 Reporting Period October, 2003 Design Electrical Rating (MWe-Net) 720 --

Maximum Dependable Capacity (MWe-Net) 693 i

_______ s - ________E.-__

Month Year-to-date Cumulative No. of hours reactor was critical 120.0 6671 198033.7 No. of hours generator was on line (service hours) 120.0 6671 193616.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 39977 4597693 127556783 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20030022 10/0612003 S 624.0 C 1 RF21 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power until September 21, 2003. A power coastdown then commenced and continued through October 5, 2003. On October 6, 2003, Unit 4 was manually tripped in accordance with plant procedures from approximately 30% power to commence the Cycle 21 refueling outage. Unit 4 went on-line on November 5, 2003.

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 11/04/2003 COMPLETED BY: Linda Tudor TELEPHONE: ' (305) 246-6408 Reporting Period October, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 - -.

Maximum Dependable Capacity (MWe-Net) 693 !71$wW11w ' .... .-

_ Month Year-to-date Cumulative No. of hours reactor was critical 745.0 6529.8 201069.2 No. of hours generator was on line (service hours) 745.0 6487.8 198696 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 529065 4442998 129802075 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F -Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% powver for the month of October 2003.

Text

NOV 1 7 2003 FPL L-2003-284 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - October 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 11/04/03 COMPLETED BY: Linda Tudor TELEPHONE: *(305) 246-6408 Reporting Period October, 2003 Design Electrical Rating (MWe-Net) 720 --

Maximum Dependable Capacity (MWe-Net) 693 i

_______ s - ________E.-__

Month Year-to-date Cumulative No. of hours reactor was critical 120.0 6671 198033.7 No. of hours generator was on line (service hours) 120.0 6671 193616.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 39977 4597693 127556783 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20030022 10/0612003 S 624.0 C 1 RF21 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power until September 21, 2003. A power coastdown then commenced and continued through October 5, 2003. On October 6, 2003, Unit 4 was manually tripped in accordance with plant procedures from approximately 30% power to commence the Cycle 21 refueling outage. Unit 4 went on-line on November 5, 2003.

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 11/04/2003 COMPLETED BY: Linda Tudor TELEPHONE: ' (305) 246-6408 Reporting Period October, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 - -.

Maximum Dependable Capacity (MWe-Net) 693 !71$wW11w ' .... .-

_ Month Year-to-date Cumulative No. of hours reactor was critical 745.0 6529.8 201069.2 No. of hours generator was on line (service hours) 745.0 6487.8 198696 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 529065 4442998 129802075 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F -Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% powver for the month of October 2003.