ML20055G706

From kanterella
Revision as of 15:25, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-34,revising Tech Spec 6.1 to Remove Equipment to Support Plant Closure
ML20055G706
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/20/1990
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To: Weiss S
Office of Nuclear Reactor Regulation
Shared Package
ML20055G707 List:
References
P-90209, NUDOCS 9007240088
Download: ML20055G706 (3)


Text

. _ m .

F-1 0 Public Service

  • 2";.*3* 6 .

. P.O. Box 840 Denver CO 80201 o840 JJuly'20,1990 I Fort St. Vrain A. Clegg Crawford

. Unit No. 1- vice President .

P-90209 Nuclear operations i

U. S. Nuclear Regulatory Commission l ATTN: Document Control-Desk 'l Washington, D. C, 20555  ;

ATTN: Mr. Seymour H. Weiss,_ Director  !

Non-Power Reactor, Decommissioning l and Environmental Project Directorate ~

Docket No. 50-267

SUBJECT:

PROPOSED TECHNICAL- SPECIFICATION AMENDMENT TO THE DESIGN FEATURES SECTION

REFERENCES:

1) PSC' Letter, Crawford to Weiss, dated May 22, 1990 j (P-90159)
2) PSC Letter, Crawford to Weiss, dated April 26, 1990

'(P-90083)

Dear Mr. Weiss:

' Fort -St. v' rain permanently discontinued nuclear operations as of August 18, 1989, and has. since commenced defueling the reactor.

Currently,. twelve regions of fuel have been removed from the reactor core.

This is an amendment request to the Fort St. Vrain (FSV) Technical

_ Specification Design-Features, Section 6.1, to permit the removal of certain FSV equipment items in support of plant closure activities as_

l- discussed in Attachment 2 of Reference 1). Specifically, this amendment would allow removal of control rod absorber strings, reserve shutdown hoppers, orifice valve assemblies, control rod drive radiation shields, and top keyed metal reflector elements from l defueled regions.

Please note that this amendment request includes the proposed changes to Section 6.1 as submitted in Reference 2). These changes are indicated by double revision marks in the left margin.

A summary of proposed changes is included as Attachment 1. The  :

proposed changes are included as Attachment 2. A No Significant Hazards Consideration Analysis is included as Attachment 3. A Safety P 'An~afS s is included as Attachment 4.

9007240088 900720 '

PDR P

ADOCK 05000267 N '/

PDC ^

I/ /

i.

>-, g : .;

P-90209~

.Page_2 July-20, 1990 If you have any; questions concerning this submittal,'please contact' Mr. M. H. Holmes at (303) 480-6960.

Very truly yours,

$' -y

-A. Clegg Crawford Vice President Nuclear Operations ACC/DLF/imb Attachments

cc: ' Regional Administrator, Region IV ATTNi , Mr. J. B. Baird .

Technical Assistant Division of Reactor projects Robert M. Quillen, Directo-Radiation Control Division Colorado Department er Health Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain-A

4. u_

Y 4 y,

, f UNITED STATES OF AMERICA  ;

NUCLEAR REGULATURY COMMISSION  !

In the Matter of the Facility Operating License) of )

Public Service Company of Colorado Docket No. 50-267 Fort St; Vrain Unit No. 1 >

-AFFIDAVIT l

, A. Clegg Crawford, being first duly sworn, deposes ano says: That  !

he it Vice President, Nuclear Operations, of Public Service Company  !

of Colorado, the Licensee ~ herein, that he has read the foregoing ,

4 Application for Amendment to Appendix A of the Facility Operating

  • License and knows the contents thereof, and that the statements and l matters set forth therein are true and correct to the best of his l knowledge, information and belief.

$ ' kjf A. Clegg Crawford/"

/d ,

Vice President Nuclear Operations  ;

STATE OF COLORADO )

)

COUNTY OF DENVER )

. Subscribe and sworn to before me, a Notary Public on this 19th day of July , 1990

+ 08% > b me.% ~

Notary Public '

My commission expires January 6, , 1993 4'