ML20041F360

From kanterella
Revision as of 10:01, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Interim Rept 21, Initial Approach to Power Tests (B-Series), for Period Ending 811122
ML20041F360
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/01/1982
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20041F361 List:
References
P-82058, NUDOCS 8203160427
Download: ML20041F360 (2)


Text

_ _ _

,p pq f: hublic Service (On1[311nV OHO'OildG 16805 WCR 19 1/2, Platteville, Colorado 80651-9298 March 1, 1982 Fort St. Vrain Unit #1 P-820" Y 'b s _.

//

Mr. John T. Collins,  ; 9ECT Regional Administrator Region IV

- p%1ggB7?'

  • Y Z 'A 0\ p S Nuclear Regulatory Commission S 611 Ryan Plaza Drive ro g Suite 1000 Arlington, Texas 76011 * *

Reference:

Facility Operating License No. DPR-34 Docket No. 50-267

Dear Mr. Collins:

Enclosed please find a copy of the twenty-first Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1. This report covers the period from August 23, 1981, through November 22, 1981, l

and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.

Very truly yours, 1

  • ~

iT}ntnl Don Warembourg Manager, Nuclear Productirn DW/lsb Enclosure cc: Director, I and E Director, MIPC 'l ]*f g('n', r 7

j'

] psq

}

4 g

8203160427 820301 PDR ADOCK 05000267 P PDR

/gV.g 5

'/

r i ==

e t

STARTUP REPORT DISTRIBUTION Nuc.ber of Copies Karl V. Seyf rit. D i re c t o r - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,2 (Original of P Letter)

Region IV Of fice of Inspection and Enforcement Nuclear Regulatory Commission 611 Ryan Plaza Drive 3uite 1000 Arlington, Texas 76012 Direc to r ------------------------------------ 2 (P Letter)

Of fice of Management Information and Program Control Nuclear Regulatory Commission Washington, D.C. 20555 Direc to r ------------------------------------ 25 (P Letter)

Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Conmission Washington, D.C. 20555 Department of Energy 1 (P Letter)

Mr. Glen A. Newby, Chief------------------------------

itTR Branch Division of Nuclear Power Developnent Mail Station B-107 Washin gton, D.C. 20545 W . B us hne ll, S i te Mana ge r - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (Original of FPLG Letter General Atomic Company Plus 2 Copies Plus 1 P. O. Box 426 Copy of P Letter)

Platteville. Colorado 80651 NRC Res iden t Si te inspe c tor - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Vice President. Engineering and Planning, 39 th Ave nue - - - - - - - - - - - - - 1 (P Letter. FPLG Letter)

Vice President, Production Division, Belleview ----------------- 1 (P Letter)

Q ua li ty As s u ranc e Mana ge r - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter, FPLC Letter)

Si te Engineering Coordinator -------------------------- 1 (P Le t te r , FPLG Letter)

Senior Vice President, Roo m 7 7 0 - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Nuclear Project Manager, Ibntbello ----------------------- 1 (P Letter, FPLC Letter)

Supervisor, Licensing and Administrative Services.

Nuclear Project Department, !bntbello ------------------- 1 (P Let ter, FPLG Letter)

S upe rviso r, Project Engineering, Nuclear Project Department, Montbello ----- 1 (P Let ter, FPLG Letter)

Documents Control Technician, Montbello - - - - - - - - - - - - - - - - - - - - 2 (2 P Letters, 2 FPLG Letters)

Correspondence Coordinator, Nuclear Project Department, Montbello - - - - - - - - 1 (P Letter, FPLG Letter)

Nuclear Production Manager --------------------------- 1 (P Letter, FPLC Letter)

Operations tbnager ------------------------------- 1 (P Letter)

Admi nis t ra tive Se rvices Mana ge r - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

PORC Committee --------------------------------- 1 (P Letter)

Dr.H.G.Olson--------------------------------- 1 FSV NFSC Secretary ------------------------------- 1 (P Letter)

PFiles------------------------------------- 1 (P Letter)

Record Storage -------------------- ------------ 2 (P Letter)

Technical Se rvices Review - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Technica l Se rvices S upe rvisor - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Technical Services Startup Report Notebook ------------------- 1 Startup Report Folder - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter, FPLG Letter)

Startup Report File - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 (Original of Report, P Letter, FPLG Letter) me