ML20011A268

From kanterella
Revision as of 08:13, 17 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Pipe Hanger Stiff Clamps
ML20011A268
Person / Time
Site: Satsop
Issue date: 10/02/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20011A269 List:
References
GO3-81-2572, NUDOCS 8110080403
Download: ML20011A268 (1)


Text

No I

I Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 a) x ff N \

G3 00T 7138> 11 ;

umscu pyrou y P October 2, 1981 G03-81-2572 Cu g

/

g Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington D. C. 20555 Attention: Mr. V. Stello Gentlemen:

Subject:

PROJECT NOS. 3 AND 5 DOCKET NUMBERS 50-508 AHD 50-509 NTERIM REPORT OF POTENTIAL 10CFR50.55(e)

Please find attached a copy of the interim report provided to Region V of a potential 10CFR50.55(e) concerning pipe hanger stiff clamps.

Should you have any questions or desire further information, please contact me directly.

Very truly yours,

/.

\ R. S. Leddick Program Director, WNP-3/5 cc: J. Adams - PP&L -WO/A D. Smithpeter - EPA -WO/A Ebasco - fiew York -WO/A WNP-3/5 Files - Richland -WO/A 8110080403 811002 "77 PDR ADOCK 050005C8 s PDR f[S