Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17286A2801990-08-27027 August 1990 Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d) ML17286A2671990-08-23023 August 1990 Provides Info on Steps Taken to Minimize Potential Effects of NRC Maint Insp Interface Record, Form on Candor of Supply Sys Personnel When Talking W/Nrc Inspectors ML17286A2641990-08-20020 August 1990 Advises That Tech Spec Rev Re ATWS Recirculation Pump Trip Will Be Submitted by 900928,per Discussions W/ P Eng & H Lee ML17285B4341990-08-20020 August 1990 Withdraws 900302 Request for Amend to Tech Spec 3.8.1.1, AC Sources Reducing Excessive Testing of Diesel Generators. IR 05000397/19900141990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4171990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4041990-08-0202 August 1990 Submits Justification for Continued Operation W/Emergency Diesel Generator 2 Shorted Turns ML17285B3981990-07-30030 July 1990 Advises That Installation of Detector Check Valve in Fire Protection Underground Piping Sys Complete,Per 890911 Ltr. Sys Monitors for Underground Sys Leakage Over Entire Fire Protection Sys ML17285B3991990-07-27027 July 1990 Forwards Justification for Continued Operation Re Emergency Diesel Generator 2 Shorted Turns.Justification Concludes That Diesel Generator Capable of Supporting Present Operability Requirements of Tech Specs ML17285B3711990-07-12012 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Confirms That Items 1,2,3,4 & 5 of Requested Actions of Operating Reactors Completed ML17285B3761990-07-12012 July 1990 Discusses Potential for Surface Entry & Mining Near Plant Sites.Concludes That NRC Need Not Consider Issue as One Requiring Continued Monitoring ML17285B3781990-07-11011 July 1990 Requests Waiver of Compliance from Tech Spec 3.8.1.2 Re Ac Sources - Shutdown.Waiver Will Allow Performance of Rotor Pole Ac Voltage Drop Test to Provide Confirmation That for Extended Run Degradation Condition Will Not Occur ML17285B3841990-07-10010 July 1990 Forwards Util 1990 Emergency Exercise Scenario.W/O Encl ML17285B3661990-07-0505 July 1990 Advises of Listed Organizational & Personnel Changes, Effective 900707.J Burn Will Be New Director of Projects, C Powers Promoted to Director of Engineering & J Baker Promoted to Plant Manager ML17285B3641990-06-29029 June 1990 Advises That All Equipment Identified W/Atws Safety Function Acceptable from Environ Qualification Standpoint. ATWS Equipment Has Been Determined to Be Qualified to Normal Design Environ Conditions Followed by ATWS Accident Environ ML17285B3571990-06-28028 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. ML20055D2391990-06-28028 June 1990 Forwards Response to Re Violations Noted in Insp Rept 50-397/90-12.Response Withheld (Ref 10CFR73.21) ML17285B3501990-06-22022 June 1990 Advises That Mods to Recirculation Pump Trip Sys Implemented During 1990 Spring Refueling Outage.Remaining ATWS Items to Be Resolved as Listed ML17285B3511990-06-20020 June 1990 Forwards WPPSS-FTS-129, BWR Transient Analysis Model, for Review & Approval ML17285B3441990-06-20020 June 1990 Advises That Util Intends to Utilize R-value of 0.13% Delta K/K in Cycle 6 Implementing Procedures.Should R-value Change in Final Startup & Operations Rept,Changed Value Shall Be Used Instead ML17285B3451990-06-19019 June 1990 Forwards Rev 10 to EPIP 13.1.1, Classifying Emergency. Rev Includes New Format of Matrix Charts Intended to Improve Identification of Symptomatic & situation-based Emergency Conditions ML17285B3431990-06-18018 June 1990 Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601 ML17285B3461990-06-15015 June 1990 Responds to NRC Evaluation Findings of Licensed Operator Requalification Program.Quality of Written Exam & Job Performance Measure Question Bank Testing Matls Will Be Improved to Meet Std Prior to Next Program Evaluation Cycle ML17285B3301990-06-12012 June 1990 Forwards Warrant for $50,000 in Response to Order Imposing Civil Monetary Penalty Dtd 900521 ML17285B3251990-06-0707 June 1990 Advises That Calculated Max Control Room Temp Re Station Blackout Will Be Provided by 900701 ML17285B2931990-05-29029 May 1990 Responds to NRC 900426 Ltr Re Violations Noted in Insp Rept 50-397/90-09.Validity of Violation Challenged.Opposes Issuance of Severity Level IV Violation Based on Listed Reasons ML17285B2861990-05-22022 May 1990 Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991 ML17285B2881990-05-11011 May 1990 Forwards Engineering Std EES-4,Rev 0, Setpoint Methodology, as Committed in Util 900329 Ltr.W/O Encl ML17285B2471990-05-0101 May 1990 Advises That No Changes to Tech Specs Required as Stated in 891130 Ltr in Response to Generic Ltr 89-21 Requesting Plant Status on Implementation of USI Re ATWS ML17285B2741990-04-26026 April 1990 Advises That Util Has No Comments on Licensed Operator Annual Requalification Exam During Wks of 900226 & 0305.All Comments Resolved When Exams Administered ML17285B2321990-04-25025 April 1990 Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17 ML17285B2121990-04-19019 April 1990 Responds to Fire Protection Issues Identified in 900201 Notice of Violation.Corrective Actions:Major Hardware Changes Implemented & Independent Consultant Will Be Employed to Review Fire Protection Program ML17285B2221990-04-16016 April 1990 Forwards Status Rept for Commitments Made in 891130 Ltr Re commercial-grade Dedication Process.Resolution of 10 Samples Identified by NRC & 50 Samples Identified by Cynga Completed ML17285B1881990-04-11011 April 1990 Responds to NRC 900312 Ltr Re Violations Noted in Insp Rept 50-397/90-01.Corrective Actions:Complete Job & Task Analysis Completed for Health Physics Technician Training Program & New Program Will Include Training on Fundamentals ML17285B1821990-04-0505 April 1990 Requests Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii) & (IV) to Allow Delayed Submittal of NRC Form-474, Simulation Facility Certification & to Administer Simulation Test as Upgraded,Respectively ML17285B1741990-04-0505 April 1990 Advises That NRC Approved Use of Final Feedwater Temp Reduction in Amend 77 to License NPF-21 ML20012F6141990-04-0404 April 1990 Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML17285B2041990-03-29029 March 1990 Requests Review of Encl Topical Rept WPPSS-FTS-127,Rev 0, Qualification of Core Physics Methods for BWR Design & Analysis. Upon Rept Approval,Tech Spec Changes (Per Generic Ltr 88-16) Scheduled for Jan 1992 ML17285B1421990-03-29029 March 1990 Forwards Revised Schedule for Plant Equipment Setpoint Methodology Program Plan.Methodology Revised to Incorporate Latest ISA Std Draft.Setpoint Program Design Team for FY90 Onsite,Trained & Began Work on 900312 ML17285B1381990-03-29029 March 1990 Forwards Concluding Rept of Results Requested by Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment. Air Quality Testing Performed to Date Reveals Steadily Improving Results ML17285B1131990-03-28028 March 1990 Advises of Release of Subchannel Thermal Hydraulic Computer Code & Requests Review of VIPRE-01 Mod-02 & Issuance of SER for PWR & BWR Applications.Bwr Qualification Analyses Completed & Rept on BWR Applications Encl ML17285B1331990-03-23023 March 1990 Responds to NRC 900221 Ltr Re Violations Noted in Insp Rept 50-397/89-40.Corrective Actions:Plant Procedure 10.25.63, Emergency Lighting Insp in Process of Being Expanded to Provide Instructions & Check Sheets to Ensure Uniform Insps ML17285B1311990-03-21021 March 1990 Forwards Proposed Bases Change Re 891129 Request for Amend to Tech Spec Table 4.3.6.1, Srm/Irm Detector Not-Full-In Functional Test. Bases Change Describes Special Circumstances Re Test Exception ML17285B1291990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in LWRs & Generic Ltr 89-21 Re Status of Implementation of Usis.Tech Specs Adequate to Verify Operability of Overfill Protection Sys ML17285B1171990-03-19019 March 1990 Suppls 900102 Response Re Implementation of fitness-for-duty Program at Facility.All Items Identified as Incomplete as of 900103 Completed at End of Jan 1990 ML17285B1121990-03-15015 March 1990 Provides Level of Property & Liability Insurance Coverage for Facility,Per 10CFR50.54(w)(2) Annual Requirement ML17285B0931990-03-0202 March 1990 Forwards Supplementary Info Re 900214 Application for Amend to License NPF-21,revising Tech Spec 3.3.7.5 to Address Failed Safety/Relief Valve Position Indicators ML17285B0741990-03-0202 March 1990 Responds to NRC 900201 Ltr Re Violations Noted in Insp Rept 50-397/89-30.Corrective Action:Plant Personnel Currently in Process of Making Improvements to Plant Operations Procedure Writers Guide ML17285B0861990-03-0101 March 1990 Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01 ML17285B0581990-02-26026 February 1990 Forwards Washington Nuclear Plant-2 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989 & Amend 7 to Odcm. 1990-08-27
[Table view] |
Text
~
lr P,CCEIZMTED DISCI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8804280346 DOC.DATE: 87/12/15 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amend to License NPF-21,allowing slow starts.
DISTRIBUTION CODE A056D COPIES RECEIVED LTR ENCL SIZE:
TITLE: OR Submittal:Fast Cold Starts of Diesel Genera ors GL-83-41 (GL-84-15/
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 3 3 SAMWORTH,R 1 1 INTERNAL ACRS ARM/DAF/LFMB EGPp4 8D 6
1 6'
0 1
AEOD/DOA NRR/DEST/ADS 7E NRR/PMAS/ILRB12 1
1 1
1 1
G 01 1 1 RES SERKIZ,A 1 1 RES DE/EIB 1 1 RES/DRAA 1 1 RES/DRAA/PRAB 1 1 RES/DRPS/RPSIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 23
g ~
Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richiand, Washington 99352-0968 (509)372-5000 December 15, 1987 G02-87-285 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
NUCLEAR PLANT HO. 2 OPERATING LICENSE NPF-21, DIESEL GENERATOR LOCA RESPONSE MODIFICATION, REQUEST FOR NRC REVIEW PRIOR TO IMPLEMENTATION
References:
- 1) Generic Letter 84-15
- 2) NUREG/CR-4557, "Improving DG Reliability" The Supply System is modifying controls to Diesel Generators 1 and 2 to allow "slow" starts as contemplated in Generic Letter 84-15 and authorized in Amendment 19 to the WNP-2 Technical Specifications (Surveillance Require-ment 4.8.1. 1.2). The Supply System has evaluated the modification per 10CFR 50.59 and identified one feature of the modification as an unreviewed safety question, not previously reviewed by the staff. This feature is the ability to manually return to idle speed, given offsite power available, after fast starting in response to a LOCA start signal. In this condition the LOCA signal would still be present, offsite power would be utilized, and the diesel(s) would be at idle. On a loss of offsite power the idle signal would be automatically bypassed making diesel generator power available in less than 10 seconds. This design feature has not previously been reviewed by the staff and requested.
it is this feature for which staff prior review is being The following is provided as background to assist the staff's review of this new LOCA response design feature.
The modification implements proposals in NUREG/CR-4557 which encourage design improvements of Emergency Diesel Generator systems consistent with long-term industry diesel generator reliability goals. The new governor control system design will add the capability to operate each diesel engine set at idle speed. This will be used primarily to provide the warmup and cooldown intervals recommended by the engine manufacturer to reduce mechanical stress and wear due to routine monthly, manually initiated, surveillance testing required by Technical Specifications.
'g a(z<j~
oddly y~ g,ig~Se /ea A4
>It 8804280346 871215 PDR ADOCK 05000397 P DCD
I Page Two
. DIESEI GENERATOR LOCA RESPONSE MODIFICATION, REQUEST FOR NRC REVIEW PRIOR TO IMPLEMENTATION Current design dictates that the diesel generators are always "fast",
started, where the engines accelerate from rest to rated RPM and the gene-rator attains rated frequency'nd voltage all within 10 seconds.
The "fast" start sequence now consists of the following:
o Upon receipt of a signal to start, a separate control voltage is directly applied to the electrohydraulic governor actuators to adjust fuel rack position to full throttle. The same start signal also engages air-start motors and enables the generator excitation (" field flash" ) circuits.
o As the unit accelerates to rated RPM, the bias control voltage to the fuel actuators is removed and is replaced by the output of the elec-tronic governor.
o Speed signals that disengage the air start motors and provide other engine speed logic permissives during an engine start are derived from a single tach generator mounted on the engine skid. A separate fre--
quency sensor on the generator output produces the (feedback) speed signal to the electronic governor.
The new design provides the capability to "fast". start in either auto or standby mode and "slow" start when under manual control. A slow start is where the diesel accelerates from rest to idle speed within a prescribed interval. When running at idle speed, the DG remains separated from its load bus with the generator excitation circuits blocked. Attachment 1 is provided to indicate the Final Safety Analysis Report sections to be changed due to this modification.
In both the existing and new designs, loss of coolant accident (LOCA) signal will automatically fast star t, or accelerate the engine, to 900 RPM. The new design will allow the engine to be slowed to idle speed by use of a local switch during conditions when offsite power is provided to the bus.
This will allow the engine to be operated for extended periods unloaded.
The engine manufacturer does not recommend operating the engine at full speed-low load conditions for longer than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Continued operation at high speed unloaded can result in fuel carry over, high exhaust temperatures, mechanical damage and/or fire. If the respective 4.16 KV Class lE bus (SM-7, SM-8) primary undervoltage relay signal is received when an operating engine is at idle speed, manual control is automatically by-passed. The engines are accelerated to r ated speed and generator excitation (field flash) is initiated. The diesel generator is automatically brought to rated frequency and voltage attaining a ready-to-load condition within the prescribed 10 seconds.
I
- Page Three DIESEL GENERATOR LOCA RESPONSE MODIFICATION, REQUEST FOR NRC REVIEW PRIOR TO IMPLEMENTATION In the new design, the "fast" start sequence includes the following:
With a signal to start, the electronic governor controller adjusts the fuel rack to the start position, air start motors are engaged and the generator excitation cir cuits are enabled. The engines accelerate from rest to rated speed as the controller continues to monitor and adjust fuel rack position. The acceleration time interval (ramp time) is preset and is entirely controlled by the electronic governor.
Speed signals for control logic permissives to various auxiliaries (including air start motors), as well as the electronic governor, are now derived from magnetic pickup transducers (two per DG) mounted radially from each engine flywheel.
This modification will provide diesel engine control design improvements that are consistent with long-term diesel generator reliability goals. some of these improvements include:
The new governor system will allow slow starts for routine surveillance testing, thereby achieving a reduction in the number of fast start surveillance tests. This is in accordance with manufacturer's recommendations and NRC staff guidance as outlined in Generic Letter 84-15, "Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability" .
- 2) The new updated electronic governor was designed with a high degree of immunity to environment and operational influences and increased tolerance of human error. The manufacturer states that this new governor is much more reliable than the system presently used at WNP-2 based upon customer returns and field service.
- 3) The engine actuators which control fuel rack position will be changed from forward to reverse acting. Reverse acting actuators give full fuel rack position at minimum governor signal. Therefore, if the electronic governor fails due to loss of power or low output, the actuator will still control at a slightly higher speed using the mechanical backup flyball governors built into'he actuators. The engine will continue to function for most electronic governor failures.
DIESEL GENERATOR LOCA RESPONSE MODIFICATION, RE/VEST FOR NRC REVIEW PRIOR TO IMPLEMENTATION
- 4) The present design requires speed signal inputs from two sources: a tach generator connected to the auxiliary gearbox of the engine and a frequency transducer connected to the generator output. The tach generator provides a signal to a speed switch used to control startup of the engine. The frequency transducer provides a speed input to the old governor. Failure of either of these devices will disable the diesel. The new design derives both signals from a common source. The engine speed signal wi 11 be derived from a magnetic pickup located near the engine flywheel. For redundancy, and since these are tandem units, a magnetic pickup will be installed on each engine's flywheel. The signals from these magnetic pickups will be routed to a magnetic pickup selector module. This module automatically selects the pickup with the higher output and monitors for pickup failure. The output of the selector module then drives the speed switch and electronic governor.
All components are made by the same manufacturer to ensure compati-bility. This system will reduce the probability of failure of the engine.
- 5) The present design requires the engine to run at full speed unloaded when started by a LOCA, even with offsite power available. The engine manufacturer recommends operating for less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> in this condition. This is because unburned fuel will accumulate in the exhaust system and possibly cause a fire. The only way to stop the engine with a LOCA signal present is to manually utilize the emergency stop feature. This disables, the engine from being restarted until the emergency stop is locally reset. The new design will allow the engine to be brought to idle speed during a LOCA condition when offsite power is available to the associated bus. This feature of the new design will allow the diesel to be idled for extended periods.
The Supply System has reviewed this design modification per 10CFR50.92 and provides the following in support of a finding for no significant hazards.
No does significant not:
hazards will result relative to this modification because it Involve a significant increase in the probability or consequences of an accident previously evaluated since the new diesel engine governor control system is primarily a hardware upgrade. The LOCA response feature will allow the engine to be run at reduced speed for extended periods, unloaded during conditions with offsite power available and a LOCA signal present. When power is lost to the bus, the engine will automatically start if not already running or ramp to full speed idling and automatically provide power to the bus within the required if 10 second time frame. All other boundaries and functions of the diesel engine governor control system remain the same. Hence, no increase in the probability or consequences of an accident previously evaluated is possible. The. diesel(s) will still respond within the required: time frame.
\
4
~ (
Page Five DIESEL GENERATOR LOCA RESPONSE MODIFICATION, RE()UEST FOR NRC REVIEH PRIOR TO IMPLEMENTATION
- 2) Create the possibility for an accident or malfunction of a different type than any previously evaluated because the automatic response of the diesel engine controls to accident signals "to start" is similar to the previous design. The new governor control system design retains the same fast-start ability from ambient conditions as the previous design. The LOCA response feature has been added to allow the engine to be run at reduced speed during a LOCA and offsite power feeding the buses'his new design still ensures that the diesel will be capable of automatically providing power in 10 seconds or less if offsite power is lost during these conditions. That is, if an automatic fast start demand signal (i.e. primary undervoltage on 4.16KV Critical Bus SM-7 or SM-8) is received when operating the diesel engines at reduced RPM (idle speed), manual control of engine speed is automatically bypassed.
The governor control system automatically brings the diesel generator to rated frequency and voltage attaining a ready-to-load condition.
Since the diesel(s) in all cases will respond as originally intended, i.e. within 10 seconds, no new accidents or malfunctions are credible.
This design is similar to those previously approved on Clinton and San Onofre 82.
The idle speed feature of the new controller will be used for manually initiated surveillance testing or other maintenance startups that do not require proving the "10 second ready to load" response criteria of the Technical Specifications.
- 3) Involve a significant reduction in a margin of safety because the engine governor speed control system replacement and upgrade will not affect the Technical Specification bases or ability of the Diesel Engine System to meet Technical Specification requirements.
This review request has been reviewed and approved by the HNP-2 Plant Opera-tions Committee (POC) and the Supply. System Corporate Nuclear Safety, Review Board (CNSRB).
e(
Page Six DIESEL GENERATOR LOCA RESPONSE MODIFICATION, RE/VEST FOR NRC REVIEH PRIOR TO IMPLEMENTATION In accordance with 10CFR170.21, an application fee of One hundred fifty dollars ($ 150.00) accompanies this request.
The Supply System desires to install the new LOCA response design feature during the spring 1988 refueling outage. Accordingly, it is requested that the Staff's review be completed no later than March 1, 1988 to support this schedule. The remainder of the design modification will be implemented during the spring 1988 refueling outage.
Should you have any questions, please contact Mr. P. L. Powell, Manager, HNP-2 Licensing.
Very truly your s, g Q-G. C. Sorensen, Manager Regulatory Programs PLP/bI<
Attachments cc: JB Martin - NRC RY NS Reynolds - BCP8R RB Samworth - NRC DL Hilliams - BPA NRC Site Inspector - 901A