MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles IR 05000250/20243012024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-112, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-057, 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications2024-04-11011 April 2024 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications ML24087A1992024-04-0505 April 2024 Achp Section 106 Letter Re Notice of Availability of the Final Environmental Impact Statement for Turkey Point Units 3 & 4 Subsequent License Renewal Application ML24096A2162024-04-0505 April 2024 Ltr. to Marcellus Osceola, Chairman, Seminole Tribe of Florida, Re., Section 106 Letters for Turkey Point ML24087A1982024-04-0505 April 2024 Notice of Availability of the Final Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML24096A2182024-04-0505 April 2024 Ltr. to Stephanie Bryan, Tribal Chair, Poarch Band of Creek Indians, Re., Section 106 Letters for Turkey Point ML24096A2152024-04-0505 April 2024 Ltr. to Lewis Johnson, Principal Chief, Seminole Nation of Oklahoma, Re., Section 106 Letters for Turkey Point ML24087A2012024-04-0505 April 2024 Letter to Talbert Cypress, Miccosukee Tribe of Indians of Florida; Re., Section 106 Letters for Turkey Point ML24087A2002024-04-0505 April 2024 Letter to Miami-Dade County Office of Historic Preservation Re Section 106 on Turkey Point Units 3 & 4 EIS ML24096A2142024-04-0505 April 2024 Ltr. to David Hill, Principal Chief, the Muscogee (Creek) Nation, Re., Section 106 Letters for Turkey Point ML24072A2832024-04-0101 April 2024 Ltr to Dianne Strand-Notice of Avail.-Final Site-Specific Supp. 5a, 2nd Renewal to the GEIS for License Renewal L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
I AEC DISTRIBUTIG 'OR PART 50 DOCK T felATERIAL tTEt'1?ORARY FORt',I)
COiNTROL NO: 1505 FILE- MONTHLY REPORT FILE FRO;),1 Florida Po~er & Light Co. DATE OF OOC DATE R EC'D LTR T N'X RPT OTHER Miami, Rla A.D. Schmidt 2-7-75 2-10-75 TO: ORIG CC OTHER SENT AEC POR Office of Management Info 1-signed SENT LOCAL PDR CLASS UNC LASS PROP INFO INPUT NO CYS RFC'D DOCK-"- T NO:
XXXX 1 50-250 nd 251 DESCR I? TIOi!: ENCLOSURES:
Ltr trans the follotring: Monthly Report for Januar Plant & Component Operability & Avai<lability This Report to be used in preparing Grey Kg Oping TEDGE. Book by Plans & Opdrations.
No. of Cys Rec'd 1 DO NOT 3"FrOVI(
PLANT NA11E: Turkey Point f/3 and 4 FOR ACTION/INFOR;.IATION
" 10" 75 JG B
'BUTLER (S) . SCHWENCER (S) ZIEMANN (S) REGAN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (S) STOLZ (S) DICER (E) "ZB (S)
W/ Copies W$ Copies W/ Copies / [ Copies PARR (S) VASSALLO (S) KNIGHTON (E} THOMPSON W/ Copies W/ Copies W/ Copies W/ 2 Copies KNIEL (S) PURPLE (S) YOUNGBLOOD (E)
~l W/ Copies W oie W/ Co ies INTERi~!AL DISTrtl:")UTIQN G FX1 TECH REVIEW DE NEON LIC ASST ~AT IND AEC PDR SCHROEDER GRI!KE DIGGS (S) BRAITMAN OGC) ROOM P-506-A MACCARRY GAMiILL GEARXN (S) SALTZMAN MUNTZING/STAFF KNXGHT KASTNER GOULBOURNE (S) B ~ HURT CASE PAWLXCKI BALLARD KREUTZER (E)
GIAMBUSSO SHAO SPANGLER LEE (S) LANS BOYD STELLO MAIGRET (S) CDONALD MOORE> (S) (BWR) HOUSTON ENFIRO REED (E) VtlHAP>iAN DEYOQNQ (S) (PWR) NOVAK PRtLLER SERVICE (S) DUBE v/input SKOVHOLT (S) ROSS DICKER, SHEPPARD (S) E. COUPE GOLLER= (S) IPPOLITO KNIGHTON SLAT R (E)
P. COLLINS TEDESCO YOUNGBLOOD S H (S) DE THOMPSON (2)
DENISE LONG REGAN ETS (S) KLECKER REG OPR LAXNAS PROJECT LDR WILLIAMS (E) EISENHUT FILE G REGION (2) BENAROYA WILSON (S)
T eR e WXLSON s(II~LE VOLIMER HARLESS XNGRAM (S)
EXTERNAL DIS'. 'TIOi"
-LOOAL FDR Homestead, Fla (1) (2) (10) -NATXONAL LABS 1-PDR SAN/1 NY Ni-TIG(ARE RNAIIII) 1 W. PENNINGTON) RM-E-201G.T. 1 "BROOKHAVEN NAT'AB Cfi-NSZC(BUCHANAN) 1-CONSULTANTS 1-G. ULRXKSON,ORNL 1-ASLB NEKfARK/BLUIE/AGBABXAN ~
1-AGMED RUTH GUSS~fAN
' 1-NEWTON ANDERSON i'.'3.6-ACRS HOLDXNG .- ."'1"J.
ROOM B"127 G,T.
RUNKLES RM"E-20 G.T.
r' I
'N
(
ii fg
. BOX 3100 MIAMI,SLORIDA 33IOI FLORIOA POWER BL LIGHT COMPANY Februar ~7~igID974,"', c Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the January, 1975 Operating Status Reports for Turkey Point Unit Nos. 3 and 4.
Very truly yours, P'ed A. D. Schmidt, Vice President VTC:df Attachment cc: Mr. Norman C. Moseley Jack R. Newman, Hsctuire 1505 HELPING BUILD FLORIDA
h
~ aa
ENCLOSURE A DOCKET NO., 50-250 urke Point Unit No. 3 DATE Januar 4 1975
'Oi~PLETED BY V. T. Chilson TELEP1iONE NO. OS 445-6211 Ext. 2177 DAILY UNIT POWER OUTPUT
~i~ Januar 197S
~ P
'AVPRAGE DAILY i4<e-net DAY AVHRA% DAILY N<e-net
66'1' '20 687'93 672 21' 22 692
- 23. 69'2
'688 24 702.
'98 683 25 .
- 7. 679 26 701
-696
'90 8 27 9 685 28 693 10 688 29 "689 690 30 685 691 687 631 609 NOTE: Daily average power level greater than 666 MWe, due 706 to cooler condenser cooling
..wat'er.
16 699 "689 693 414
4
)C J "P*-
Jl e
~ ~ '
~ g Il C 4
1 e4. Nio 50 250 Po~int Q +iig~
Dgl J" Januar 4 1975 ~~~~vv>v>vv>>HLtv
~
~
CO~JJ'J.li'I'JQO BY aaasw m vv> T.
~I. Chilsonv <<> w ~v v elvv~
TJ LEPJ'JOINJ -
305 445-6211 Ext. 2177 4
OPERATING STA'I'US
- 1. REPORTING I'ERIOD: 0001 75 01 01 'llJROUGJJ 2400 75 Ol 31 GROSS IJOUJ(S IN RJ";POKJ'lNG I'I!RLUl3: 744. 0
- 2. CURREh"fLY AU'JIJORIZED PONER LEVEJ, (hlliJt) 2200 hler%. DEPEND. CAPACI'JY (hllfe NL'T) 666 POWru LEVEL TO JeJICJJ RESTRICTED (IF ANY). (hue her) None
- 4. REASONS FOR RESTRICTIONS (IF NY):
'IBIS CUI~S LATIVE hSNTJ.J YR-'fO-DATE TO DATE
- 5. MMER OF HOURS TJK REACTOR WAS JXI IITrAT CIT IT'I>T/ AI ICPw ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ v ~ v 744. 0 ~
744. 0 6.. RFA,CTOR RESERVE SMJI'J30Wil I JOVIAL 7. HOURS GENERATOR ON LINE ...............
744. 0 744.0 ~4 62~ 5 8." UNIT RESERVE SJU130%l HOURS .....,..... 85.0
- 9. GROSS,'I'fJEJlhJAL ENERGY'GEiKJQTED(MQ).... 1 590 161- 1 590 161 24 270 185
-10. GROS! I',LECTRICAL ENERGY GENERATED (O'I'J.l).............................'..... 527 898 527 898 7 955 703 NET ELECLv,iCAL cixl;RGY ucivTRATED g~ii~n). 03 417 '03 417 7 484 582
- 12. RECTOR AVAILABILITYFACTOR +1 100.0 100.0 78.0
- 13. UNIT AVAILABILI'IYFACTOR g2,.......,... 100. 0 100.0 74. 8
- 14. UNIT CAPACI'JY FACTOR J3,............... 101.6 /5 101. 6+ 60.9
- 15. UNIT FORCED OUTAGE RATH g4 ............. 4.0
- 16. SJ.JVI'DOJNS SCJ.IEDULL'D OVER NEXT 6 laiVIHS ('IYPH, DATE AhJD DURATION OF EACH):
February 24 March 2, 1975 Seismic Restraint Inspection
- 17. IF SJJUTDONN AT BS OF REPORT PEJGOD, ESTIMATED DA'fE OF STAR'IUP:
= HOURS RFACI'OR 4'AS CRITlCAL X 100 2/ REAQ'OR AVAI~IIIIYPA&OR QRQ5$ iiQQR5 i>i [Qj>Qiii~gv, i>i,RIQQ I,ILIES 2
~
UiiJIT AVAIJABIJ I'IY FACTOR =
GROSS JJOlJRS 1N JKPOJ<'I'LIRIOD HEI'!J.L'(;Tl<ICAJ. POiijlilk GEh JiR.s'fED X 100 I IAX. 131!I'liihl3A!JJ,L'AJ'ACI'I'Y X Gl<OSS JJOURS IN'<EJ?OKf PERIOD UNIT OUTAGF M& = ORC JJOVRS
'l l l' U S Gl':NlilbVJ'Ol<
FOJ<CI!I') OVTAGL' JOV JiS" ON +
Q5 Note: Unit capacity factor greater than 100%, due to cooler condenser cooling water.
I*
>>44 I >>>>~Vnaeaa444>>44bI Al>>>> .'444>>>> e 'I -I 4 44t>>
I" 4' 4 p h
Docket No 50-250 No. 3 unit, operated entire UNIT NtQK TurksPoint Unit No. 3 month with po unit, outage%. Unit .
performance was satisfactory except DATE January 1975 for reduced load operation on January 1 1975 caused, by failed bearing on No. 3 PREPARED BY V. T. Chilson condensate pump motor. TELEPHONE 8053 445-6211 Ext. 2177 REPORT hoNIH Januar 1975 U N IT S H U T D O M N S 7I' E D U C T 1 O N T PE F- FORCED DURATION
"'ETHOD OF SHUTTING DOt4N S-SCHEDULED (HOURS) REASON THE REACTOR COh P XVI'S 01 75 01 19 N/A No. 3A condensate pump motor bearing failed. Unit power level reduced to capacity or one condensate until failed bearing was replaced. .(Non Nuclear system)-
x& h@THOD REASON:
A-EQVIPhlENI'AILURE (EXPLAIN) 1-hQVJAL B-MAINT. OR TEST 2-hiGM SCRAhf C-REFUELING 3-AUIOhIATIC SCPAhi a' D-REGULATORY RESTRICTIOiN E-OPERATOR TRAINING AND LICENSE EXAhHNATION
~
F-ADMINISTRATlVE G-OPERATIOi%G ERROR
'H-OTHER:(EXPLAIN)
~ g ' ~
4 4
~
p
~ .
ENCLOSURE A DOCKET NO. 50-251 UNIT NAME Turke Point Unit No. 4 DATE Januar 4, 1975 CO~PLHT:D BY V. T.'hilson TELEPHONE NO. 305 445-6211 Ext.
DAILY UNIT POWER OUTPUT KiVVi January, 1975 DAY AVFINGE 'DAILY Nfe-net DAY AVEBA(Z DAILY M('e-net 650 20 692 651 21 -.' .685
.3 657 22 687 661 23: 676 5 '574 24 687*
25 681 P
26., 689 27 690.
28 686 10 29
" 683 311
'" 6'81 30 631
685 13 676-680 NOTE: Daily average power level greater than 666 MWe, due 15'6
.693 to cooler condenser cooling-
~ water.
706 674
r J",i a+e p
~:
H TIE IE ~ ~ %
~ 4 ~
yrq + g t ~
lt Jl ~ ee P >
l% lC 4V WtV O'V
Docket No. 50-251 U'".'49lE Turke Point Un No. 4 DATf; January 4, 1975 CO~ll'l.L")'IID BY OA V. MPWT. Chilson
~[it 4\A1t%40 & 4W VXV ~VW AP44, ASC~10lt1VAMN4llW TEI.EI'I'iQih'E OPERATING STATUS
- 1. REPORTING PERIOD: 0001, 75 03. Ol IHROUGH 2400, 75 01 31 GROSS I.IOURS IN REPOI<'I'lib(i VERIOI): 744 ~ 0
- 2. =
CURRENTLY AUTHORIZED PONJ:R LEVEL (hII('t:) 2200 hIAX. DEPJ.:b'D. CAPACI'lY (hiffo NET) 666
- 3. PQ1'lER I,EVEI, TO NIICH RESTRICTED (IF ANY): (hme NET) None
- 4. REASONS FOR RESTRICTIONS (IF ANY):
THIS GFi IULATIVE MOiVIH YR-TO-DATE TQ DATE
- 5. NUMER 01 HOURS TIK REACfOR WAS CRT fI AT'PTDAT A7
~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 666. 6 666.6 10 000.4
- 6. REACfOR IKSERVE SISTDO"li4f- HOURS ........
a 97.3 97.3 97~
- 7. HOURS GENERATOR OiN LINE ............... 646. 7 646.7 9 704.5
- 8. " UNIT IKSERVE SI-UIDQI@f IIQUIS ........... 9. GROSS TIIEIbiQL EbfERGY GENE%TED(MQ).... 1 382 019 1 382 019 19 734 229
- 10. GROSS ELECTRICAL ENERGY GENERA'I'ED (hI!) H) ~ 't ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ 450 252 450 252 6 224 513 LL ~ x77 i i.ECiv.ICi'iL i:ixcRGY GElsi:icATED (in') ~ ~ 427 763 5 896 879
- 12. REACI'OR AVAILABILITYI'ACTOR +1 89. 6 89. 6 81. 4
- 13. UNIT AVAILABILI'1YFACTOR +2
- 86. 9 86. 9 73. 8 141. UNIT CAPACITY I'ACTOR ~31,............. ~ . 86.3 86'. 3 2
- 15. UNIT FORCED OUTAGE INTE J4............. 16. SIVfDQISS SCIKDULED OVER NEXT,6 hSNTIIS ('IYPE, DATE AND DURATION OF EACH):
March 24 May 18, 1975 Refueling, Maintenance and inspections
- 17. IF SIIUTDO1&f AT END OF REPORT. PERIOD, ESTIMATED DATE OF S'I'ARTUP:
HOURS IKACTOR WAS CRITICAL X 100 CTOR AVAILABILITYFACfOR = g(QSS I'IQURS IN gf'PQRJJ'IN(, PERJOD J2 UNIT AVAIIABILI'IYFACI'OR = (,I OS& IIQURS 1% IU"PORT PERIOD
. Nl:f Iil.l',CIRICAI. IO>i'ra (:I:,Ni:relr>> 'X X SOO im. 'DJ!I'JXDAOI'.I m'A(:J. I'Y GliOSS IIOURS IN I%POINT PL'RIOD UNIT QUTAGI: RAIT. =
FOIKL'I)
-".... 0!JTA(if!
IIQURS X 100 I JOUlwS GLiNEIVVI'Olw OiN I li fl' I'QRCIID OU'I'A(IL' li)l.ll(S
~ t )g1 I
L
Docket No. 50-251 Unit No. 4 was out or servic UNIT V~!~K Turkey Point Unit No. 4 for scheduled maintenance on secondary Janua system. After unit returned to servic. 4 1975 on January 9, 1975, unit performance has been satisfactory. PREPARED BY V. T. Chilson EHO: ~B REPORT M3iVHH January, 1975'NIT SHUTDONNS/REDUCT IONS T PE i~mETHOD OF F-FORCED DURATION SHUTTING DOWN/
KO. DATE S-SCHEDULED (HOURS) REASON " TfK REACTOR
- " CON'jENTS 01 75 01 05 97. 3 B N/A Unit was removed from service to perform scheduled maintenance including: repair turbine exhaust expansion joint leak; locate and repair hydrogen. leaks on electric generator; and repair misc. steam leaks. (Non Nuclear system)
REASON i~KLHOD'.-xiQÃUAL A EQJIPi~fENI'AILURE '(EXPLAIN B-SBM'. OR TEST 2-MQ;UAL SCRSf C-REFUFLIKG ~-AUTISTIC SCRA~1 D-REGULATORY RESTRICTION
'E-OPERATOR TRAINING M)
LICENSE EXVGMTION F-ADAINISTRATEVE G-OPERATI0%4I, ERROR H-OTHER (EXPLAIN)
fg ~
j t
- xi '(
6