U.S. NUCLEAR REGULATORY CO SSION L
FROM:
Florida Power
& Light Company.
Miami, Florida Ai Di Schmidt TO No Ri Co NRC FORM 195 I~I!ls NRC D!STRIBUTlON FoR PART 50 DOCKET MATERIAL OoclCET NUMBER OATS OF OOCUMENT,
'/7/78
-w OATE RECEIVEO 1/16/II8 I ETTER
~ORIGINAL Q COPY DESCRIPTION C3NOTOR! ZEO
~NCLASSIFIEO PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED LTR TRANS
'IHE P3L'I@WING:
N3ÃQKY HEP(5Z ~
'December 1977 PGKZ 6 CGHPONEiVD'PERABILITY6 AVAXI~ILZTY.
'ISIS'EPGBZ TO HE USE IN PREPPING 'GRAY BOCK HY PLANS 6c'OPEBATIC5S.
(1-P)
{10>>P)
PLANT
~c
- Turkey Point Unit Nos 3&4 St, Lucie Unit No.
1 RJL 1/16/78 MEPG W FOR ACTION/INFORMATION INTERNALDISTRI8UTION Il'~if%.
TIC:
!%SIC EXTERNAL0 IS! R 18UTION CONTROL NUi'BRIBER 780i60007
J 1
~
FLORIDA POWER & LIGHT COMPANY January 7;
1978 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Nashington, D. C.
20555
)gI
~fj ig
~iQ Gentlemen:
Attached are the December, 1977, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit, No. l.
Very truly yours, Sc ddt Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire 7cOggoOO7 PEOPLE... SERVING PEOPLE
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50 - 250 Turkey Point UNIT Unit No.
Januar 7
1978 COMPEL) BZ V. T. Chilson MONTH
- DECEMBER, 1977 DAY AVERAGE DAILY POWER L~
(Ks~e-Net)
DAY AVERAGE DAILY POWER LEVEL QKe-Net) 17 3.8 3
4 I
19
'20 21 4 2 24
~
9 25 10 26'7 12 28 29 14 30 31
OPERAT1NG DATAREPORT DOCKET NO.
COMPLETED BY V~T; hi son TELEPHONE ~>>>~ BBE4 OPERATING STATUS 693 700
- 1. Unit Name:
Turke Po1nt Unkt No.
3
- 2. Reporting per'Iod December 7
- 3. I.icensed Thermal Power (hIWt):
2200
- 4. Nameplate Rating (Gross MWe):
- 5. Design Hectrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
666 Notes 8, IfChausses Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, lfAny:
NONE s
s This Month Yr.-to-Date Cumulative 7 185.8 43;7 7 047.3 80.4 80.4 76.6 73.6 2.4
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown 1]ours 16. Gross Thecal'Energy Generated/MWH)
I i. Gross Electrical Energy Generated (hIWH)
- 18. Net Hectrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each}:
35 22 llew.
1'4 086 4
6.6 76.6 65.4 2.8
~
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Jan.
31 1978 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (L}177}
REASOH h:
EQUIPMENT FAILURE (EXPLAIN)
B:
llAIHT. OR TES'1':
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAMIHATIOH Ft ADllIHISTRATIVE Gi OPERATIOHhl ERROR (EXPLAIN) ll:
OTllL'R (FJ(PLAIN)
APPENDIX D UHIT SNUTDOWHS AHD POllER REDUCTIONS REPORT MOHTll DECEMBER 1977 DOCKET HO.
50 - 250 Turkey Point UNIT NAME Unit No. 3 DATE Januar 7
1978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 METHOD 1:
MANUAL 2o MANUhl. SCRAH 3:
AUTOMATIC SCRAM 4l OTIIER (EXPLAIN)
NO.
DATE TYPE F:
FORCED So SCIIEDULED DURATIOH (IlOURS)
REASON(l)
METllOD OF SIIUTTIHG DOHN THE REACTOR OR REDUCING POHER(2)
CORRECTIVE ACTIONS/COMMENTS 28 77-11-23 744.0 Unit Ho.
3 was removed from service for scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and non-nuclear systems)
SUllHARY:
Unit No.
3 scheduled refueling, maintenance and inspections continued.
APPENDIX 3 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50 - 251 Turkey Point EGT Unit No.
4 DATE Januar 7
1978 COMPL~ 3Y V. T. Chilson TELEPHONE
'(305) 552-3824 MONTH DECEMBER 1977 DAY AVERAGE D~Y POWER LEVEL (We-Net)
DAY AVERAGE DAILY POWaa. L"VEL QKe-Net) 3 9
10 12 13 15 16 387 665 672 675 674 674 678 684 502 674 672 676 674 670 671 667 17 20 21
'22 23 24 25
.26 27 28 29 30 31 NOTE-478 665 676 678 680 680 681 683 680 248 413 675 679 676 675 Average daily 'power greater than 666 Kate due to cooler condenser cooling water.
0
OPERATING DATAREPORT
~
C DOCKET NO:
DATE 2a~928 COMPLETED BY ~V.T. Chi son TELEPHONE ~0 552-3824 OPERATING STATUS 760 Unit Name.
Tutke Point Unit No.
4
- 2. Reporting penod:
D<<e
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
Notes 666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date Cumulative 7 4.
38'09.0
- 12. Number OfHours Reactor Was Critical
. 13. Reactor Reserv~ Shutdown Hours
- 14. Hours Generator On-Line I!'6.
Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using iVJDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.
735.5 718.1 '138.8 5 579.8 26'121;8 1 533 214 494 150 470 026 96.5 96.5 94.9 91.2 3.5 Date. and Duration of Each):
63.7 63.7 62.8 60.4 2.4 68.4 68.4
'63. 8 3.3 12 026 298 55 085 668 3 866 242 17 823 925
- 25. IfShut Dowri At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
N/A Fo'recast Achieved INITIAL CRITICALITY INITIALELECTRICITY COh IMERCIALOPERATION (o/77)
o
REASOH A:.
KQUIPHENT FAILURE (EXPLAIN)
B:
HAINT. OR TEST
. C:
REFUELING D:
REGULATORY RESTRICTIOH E:
OPERATOR TRAIHlHC AHD LICENSE EXAHIHATIOH Fs ADHINISTRATIVE 0:
OPERATIONAL ERROR (EXPLAIN)
N:
OTHER (EXPLAIN)
APPENDIX D UNIT SHUTDOWHS AHD POWER REDUCTIONS REPORT HOHTll DECEHBER 1977 Page 1 of 2 DOCKET HO.
50 251 Turkey Point UNIT HAHE U
DATE Januar 7
1978 COHPLETED BY V. T. Cbilson TELEPHOHE (305) 552-3824 NETHOD 1:
HAHUAL 2:
-JlhlfUAL SCRAH 3a AUTOHATIC SCRAM 4;
OTHER (EXPlAIH)
NO.
DATE TYPE Fs FORgED Sc SCHEDULED DURATIOH (BOURS)
REASON(1)
HETHOD OF SHUTTIHG DOWN THE REACTOR OR REDUCINC POWER(2)
CORRECTIVE ACTIONS/COHHEHTS 18 77-12-01 Load was reduced to locate and repair condenser tube leak.
(Non-nuclear system) 19 77-12-09 4.2 Unit was tripped by steam generator Nos.
4A arid 4B level protection system caused by loss of a vital instrument bus power supply.
Corrective actions in-cluded restoring the vital instrument bus power supply.
(Nuclear system) 20 77-12-17 1.9 Unit tripped by steam generator No.
4C level protection system caused by failed air supply line to the feedwater control valve.
Corrective actions included repairing failed air supply line.
(Non-nuclear system)
REASOII A:
EQUIPMEIIT FAILURE (EXPLAIN)
B.
MAltll'. OR TES'I':
REFUEI.ItlG D:
REGUIATORY RESTRICTION E:
OPERATOR TRAINlNG ANI)
LICEHSE EXAMINATION F:
ADMINISTRATIVE 0:
OPERATIONAL ERROR (EXPLAIN) ll:
OTIIER (EXPLAIN)
APPENDIX D UHIT SUUTDOMHS AHD POMER REDUCTIONS REPORT MONTII DECEMBER 1977 Page 2 of 2 DOCKET tiO.
50 - 251 Turkey Point UNIT NAME Uni Ho.
DATE Januar 7
1978 COHPI.ETED BY V. T. Chilson TEI.EPIIONE (305 552-3824 METIIOD 1:
MAIIUAL 2:
-MANUAL SCRAM 3 t AU'IOIIATIC SCRAtl 4:
OlllER (EXPLAItl)
NO.
TYPE Ft FORCED S:
SCIIEDULED DURATION (llOURS)
REASOtl(l)
METHOD OF SHUTTING DOMN TIIE REACTOR OR REDUCING POMER(2)
CORRECTIVE ACTIOIIS/COtttIEHTS 21 77-12-17 F
3.0 Unit was tripped by steam generator Ho. 4A level pro-tection system due to a transient condition while increasing load after the unit was returned to service.
(Non-nuclear system) 22 77-12-26
- 16. 6 Unit was removed from service to locate and repair tube leak in condenser.
Corrective actions included plugging leaking condenser tubes.
(Non-nuclear system)
SUMMARY
Unit No.
4 operated at approximately IOOX R.PE cxccpt for load reduction on Dec.
1 and outages of Dec. 17, and Dec.
26-27, 1977.
APPEK)IZ B AVERAGE DAILY WAIT POWER LEVEL DOCKET NO.
50 - 335 St. Lucie UNIT Unit No.
1 DATE Januar 7
1978 COHPLETED BY V. T. Chilson TELEPHONE 305 552-3824 MONTH DECEMBER, 1977 DAY AVERAGE DAILY POWER.LEAD (Mle-Net)
DAY AVERAGE DAILYPO~ I~
(K<e-~let) 3 10 12 793 792 779 795 794 792 794 796 796 736 799 797 796 794 793 791 17 18 20 21 22 23 25 26 27 28 29 30 NOTE:
794 781 769 299 746
. 790 794 787 800 800 800 803 802 783 759 Average daily power greater than 777 i%le due to cooler condenser cooling water.
OPERATING DATAREPORT OPERATING STATUS DOCKET NO; DATE JW~1225 COMPLETED BY V~~~on TELEPHONE ~~-3824 777 St. Lucie Unit No.
1
- 2. ReportingPeriod:
December 1977
- 3. Licensed Thermal Power (MWt):
2560'.
Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
802'.
Maximum Dependable Capacity (Gross MWe):
822 7; Maximum Dependable Capacity (Net MWe):
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, lfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date Cumulative
..024.0 101;5
-'01.5 7 417.8 7 "681;8 "
17 '501 611 17 849 214 607 340 686 490 5 794 760 574 660'5 343 602
'5'442 577.
98.6 85.. 1 98.6 85.1 6.3 5 '
'3. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
~,
733.5
- 15. Unit Reserve Shutdown FJouzs
- 16. Gross Thermal Energy Generated (MWH)
1 841 408
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor 84.7,
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
~
Refuelin maintenance and ins ections March 15 - June 6, '1978
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
N/A Forecast Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION (o/77)
El
'E
REASOH h:
EI}UIPMENT PAILURE (EXPLAIN)
B:
MAINT. OR TEST C:
REPUELING D:
RECULATORY RESTRICTION E:
OPERATOR TRAINIHG AND LICENSE EXAMIHATION P:
ADMlNISTRATIVE Ge OPFRATIONAL ERROR (EXPLAIN)
II:
OTIIER (EXPLAIN)
APPENDIX D UNIT SIIUTDOIINS AND PONER REDUCTIONS REPORT HOHTH DECEMBER 1977 DOCKET NO.
UNIT NAME 50 335 St. Lucia Unit No.
DATE Januar 7.
197B TELEPIIONE (305 552-3824 COHPLETED BY V. T. Chilson METIIOD 1:
MANUAL 2o JIANUAL SCRAM 3:
AUTOMATIC SCRAII 4:
OIIIL'R (EXPLAIN)
NO+
DATE TYPE Pl PORCED S:
SCIIEDULED DURATION (IIOURS)
REASON(l)
METIIOD OP SHUTTIHG DOWN TIIE REACTOR OR REDUCING POIIER(2)
CORRECTIVE ACTIONS/COHMENTS 36 77-12-20 10.5 Unit was tripped by actuation of loss of field relay caused by spurious operation of generator field breaker.
(Non-nuclear system)
SIDDIARYl Unit operated at approximately 1002 R.P. except for outage of Dec.
20, 1977.
A
~
~