Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
NRC FORM 195 U.S. NUCLEAR REGULATORY CO SSION OoclCET NUMBER I~I!l s L
NRC D!STRIBUTlON FoR PART 50 DOCKET MATERIAL TO FROM: OATS OF OOCUMENT, Florida Power & Light Company. -w Ri
'/7/78 No Co Miami, Florida OATE RECEIVEO Ai Di Schmidt 1/16/II8 I ETTER C3NOTOR! ZEO PROP INPUT FORM NUMBER OF COPIES RECEIVED
~ORIGINAL ~NCLASSIFIEO Q COPY DESCRIPTION ENCLOSURE LTR TRANS 'IHE P3L'I@WING: N3ÃQKY HEP(5Z PGKZ 6
~ 'December 1977 CGHPONEiVD'PERABILITY 6 AVAXI~ILZTY.
'ISIS'EPGBZ TO HE USE IN PREPPING 'GRAY BOCK HY PLANS 6c'OPEBATIC5S.
(1-P) . {10>>P)
PLANT ~c : Turkey Point Unit Nos 3&4 St, Lucie Unit No. 1 RJL 1/16/78 FOR ACTION/INFORMATION MEPG W INTERNAL DISTRI8UTION Il'~if%.
EXTERNAL 0 IS! R 18UTION CONTROL NUi'BRIBER TIC:
!%SIC 780i60007
J
~
1
FLORIDA POWER & LIGHT COMPANY January 7; 1978 Office of Management Information )gI ~fj ig
~
iQ and Program Controls U. S. Nuclear Regulatory Commission Nashington, D. C. 20555 Gentlemen:
Attached are the December, 1977, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit, No. l.
Very truly yours, Sc ddt Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire 7cOggoOO7 PEOPLE... SERVING PEOPLE
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 Turkey Point UNIT Unit No.
Januar 7 1978 COMPEL) BZ V. T. Chilson MONTH DECEMBER, 1977 DAY AVERAGE DAILY POWER (Ks~e-Net)
L~ DAY AVERAGE DAILY POWER LEVEL QKe-Net) 17 3.8 3 19 4 '20 I
21 4 2 24
~
9 25 10 26'7 12 28 29 14 30 31
OPERAT1NG DATA REPORT DOCKET NO.
COMPLETED BY V~T; hi son TELEPHONE ~>>>~ BBE4 OPERATING STATUS Notes
- 1. Unit Name: Turke Po1nt Unkt No. 3
- 2. Reporting per'Iod December 7
- 3. I.icensed Thermal Power (hIWt):
2200
- 4. Nameplate Rating (Gross MWe):
- 5. Design Hectrical Rating (Net MWe):
693
- 6. Maximum Dependable Capacity (Gross MWe):
700
- 7. Maximum Dependable Capacity (Net MWe):
666 8, IfChausses Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
s s IfAny (Net MWe): NONE
- 9. Power Level To Which Restricted,
- 10. Reasons For Restrictions, lf Any:
This Month Yr.-to-Date Cumulative
- 12. Number Of Hours Reactor Was Critical 7 185.8 35 22 Reactor Reserve Shutdown Hours 43;7 llew.
- 13. 1'4
- 14. Hours Generator On-Line 7 047.3 086 4
- 15. Unit Reserve Shutdown 1]ours
- 16. Gross Thecal'Energy Generated/MWH)
I i. Gross Electrical Energy Generated (hIWH)
- 18. Net Hectrical Energy Generated (MWH)
- 19. Unit Service Factor 80.4 6.6
- 20. Unit Availability Factor 80.4 76.6
- 21. Unit Capacity Factor (Using MDC Net) 76.6 73.6 65.4
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 2.4 2.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each}:
Jan. 31 1978
~
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (L}177 }
APPENDIX D DOCKET HO. 50 - 250 REASOH h: EQUIPMENT FAILURE (EXPLAIN)
Turkey Point UHIT SNUTDOWHS AHD POllER REDUCTIONS UNIT NAME Unit No. 3 B: llAIHT. OR TES'1':
REFUELING DATE Januar 7 1978 D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND COMPLETED BY V. T. Chilson LICENSE EXAMIHATIOH Ft ADllIHISTRATIVE 552-3824 Gi REPORT MOHTll DECEMBER 1977 TELEPHONE (305)
OPERATIOHhl ERROR (EXPLAIN) ll: OTllL'R (FJ(PLAIN)
METHOD 1: MANUAL METllOD OF 2o MANUhl. SCRAH TYPE SIIUTTIHG DOHN 3: AUTOMATIC SCRAM F: FORCED DURATIOH THE REACTOR OR 4l OTIIER (EXPLAIN) NO. DATE So SCIIEDULED (IlOURS) REASON(l) REDUCING POHER(2) CORRECTIVE ACTIONS/COMMENTS 28 77-11-23 744.0 Unit Ho. 3 was removed from service for scheduled refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and non-nuclear systems)
SUllHARY: Unit No. 3 scheduled refueling, maintenance and inspections continued.
APPENDIX 3 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50 - 251 Turkey Point EGT Unit No. 4 DATE Januar 7 1978 COMPL~ 3Y V. T. Chilson TELEPHONE '(305) 552-3824 MONTH DECEMBER 1977 DAY AVERAGE D~Y POWER LEVEL DAY AVERAGE DAILY POWaa. L"VEL (We-Net) QKe-Net) 387 17 478 665 665 3 672 676 675 20 678 674 21 680 674 '22 680 678 23 681 684 24 683 9 502 25 680 10 674 .26 248 672 27 413 12 676 28 675 13 674 29 679 670 30 676 15 671 31 675 16 667 NOTE- Average daily 'power greater than 666 Kate due to cooler condenser cooling water.
0 C
~
OPERATING DATA REPORT DOCKET NO:
DATE 2a~928 Chi son COMPLETED BY ~V.T.
TELEPHONE ~0 552-3824 OPERATING STATUS Notes Unit Name. Tutke Point Unit No. 4
- 2. Reporting penod: D<<e
- 3. Licensed Thermal Power (MWt):
760
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe): NONE
- 10. Reasons For Restrictions, IfAny:
This Month Yr.-to-Date Cumulative 7 4. 38'09.0
- 12. Number Of Hours Reactor Was Critical 735.5
- 13. Reactor Reserv~ Shutdown Hours
'138.8 718.1 5 579.8 26'121;8
- 14. Hours Generator On-Line I!'6.
1 533 214 12 026 298 55 085 668 Gross Thermal Energy Generated (MWH) 494 150 3 866 242 17 823 925
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 470 026 Unit Service Factor 96.5 63.7 68.4 19.
Unit Availability Factor 96.5 63.7 68.4 20.
Unit Capacity Factor (Using iVJDC Net) 94.9 62.8 21.
91.2 60.4 '63. 8
- 22. Unit Capacity Factor (Using DER Net) 3.5 2.4 3.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
N/A
- 25. If Shut Dowri At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Fo'recast Achieved INITIAL CRITICALITY INITIALELECTRICITY COh IMERCIAL OPERATION (o/77)
o APPENDIX D DOCKET HO. 50 251 REASOH A:. KQUIPHENT FAILURE (EXPLAIN) Turkey Point UNIT SHUTDOWHS AHD POWER REDUCTIONS UNIT HAHE U B: HAINT. OR TEST
. C: REFUELING DATE Januar 7 1978 D: REGULATORY RESTRICTIOH E: OPERATOR TRAIHlHC AHD COHPLETED BY V. T. Cbilson LICENSE EXAHIHATIOH Fs ADHINISTRATIVE TELEPHOHE (305) 552-3824 0: OPERATIONAL ERROR (EXPLAIN) REPORT HOHTll DECEHBER 1977 N: OTHER (EXPLAIN)
Page 1 of 2 NETHOD 1: HAHUAL HETHOD OF 2: -JlhlfUAL SCRAH TYPE SHUTTIHG DOWN 3a AUTOHATIC SCRAM Fs FORgED DURATIOH THE REACTOR OR 4; OTHER (EXPlAIH) NO. DATE Sc SCHEDULED (BOURS) REASON(1) REDUCINC POWER(2) CORRECTIVE ACTIONS/COHHEHTS 18 77-12-01 Load was reduced to locate and repair condenser tube leak. (Non-nuclear system) 19 77-12-09 4.2 Unit was tripped by steam generator Nos. 4A arid 4B level protection system caused by loss of a vital instrument bus power supply. Corrective actions in-cluded restoring the vital instrument bus power supply.
(Nuclear system) 20 77-12-17 1.9 Unit tripped by steam generator No. 4C level protection system caused by failed air supply line to the feedwater control valve. Corrective actions included repairing failed air supply line. (Non-nuclear system)
APPENDIX D DOCKET tiO. 50 - 251 REASOII A: EQUIPMEIIT FAILURE (EXPLAIN)
Turkey Point MAltll'. OR UHIT SUUTDOMHS AHD POMER REDUCTIONS UNIT NAME Uni Ho.
B. TES'I':
REFUEI.ItlG DATE Januar 7 1978 D: REGUIATORY RESTRICTION E: OPERATOR TRAINlNG ANI)
COHPI.ETED BY V. T. Chilson LICEHSE EXAMINATION F: ADMINISTRATIVE TEI.EPIIONE (305 552-3824 0: OPERATIONAL ERROR (EXPLAIN) REPORT MONTII DECEMBER 1977 ll: OTIIER (EXPLAIN)
Page 2 of 2 METIIOD 1: MAIIUAL METHOD OF 2: -MANUAL SCRAM TYPE SHUTTING DOMN 3 t AU'IOIIATIC SCRAtl Ft FORCED DURATION TIIE REACTOR OR 4: OlllER (EXPLAItl) NO. S: SCIIEDULED (llOURS) REASOtl(l) REDUCING POMER(2) CORRECTIVE ACTIOIIS/COtttIEHTS 21 77-12-17 F 3.0 Unit was tripped by steam generator Ho. 4A level pro-tection system due to a transient condition while increasing load after the unit was returned to service.
(Non-nuclear system) 22 77-12-26 16. 6 Unit was removed from service to locate and repair tube leak in condenser. Corrective actions included plugging leaking condenser tubes. (Non-nuclear system)
SUMMARY
- Unit No. 4 operated at approximately IOOX R.PE cxccpt for load reduction on Dec. 1 and outages of Dec. 17, and Dec. 26-27, 1977.
APPEK)IZ B AVERAGE DAILY WAIT POWER LEVEL DOCKET NO. 50 - 335 St. Lucie UNIT Unit No. 1 DATE Januar 7 1978 COHPLETED BY V. T. Chilson TELEPHONE 305 552-3824 MONTH DECEMBER, 1977 DAY AVERAGE DAILY POWER.LEAD (Mle-Net)
DAY AVERAGE DAILY (K<e-~le t)
PO~ I~
793 17 794 792 18 781 3 779 769 795 20 299 794 21 746 792 22 .
790 794 23 794 796 787 796 25 800 10 736 26 800 799 27 800 12 797 28 803 796 29 802 794 30 783 793 759 791 NOTE: Average daily power greater than 777 i%le due to cooler condenser cooling water.
OPERATING DATA REPORT DOCKET NO; DATE JW~1225 COMPLETED BY V~~~on
~~-3824 TELEPHONE OPERATING STATUS St. Lucie Unit No. 1
- 2. ReportingPeriod: December 1977
- 3. Licensed Thermal Power (MWt): 2560'.
Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 802'.
Maximum Dependable Capacity (Gross MWe):
822 777 7; Maximum Dependable Capacity (Net MWe):
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: .
- 9. Power Level To Which Restricted, lfAny (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
..024.0
'3. Reactor Reserve Shutdown Hours 101;5 '
-'01.5 "
~, -
733.5 7 417.8 7 "681;8
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown FJouzs 1 841 408 17 '501 611 17 849 214
- 16. Gross Thermal Energy Generated (MWH) 17.
18.
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH) 574 660'5 607 340 98.6 686 490 343 602 5 794 760
'5'442 577.
85.. 1
- 19. Unit Service Factor 85.1 Unit Availability Factor 98.6 84.7, 20.
6.3 5 '
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
~
Refuelin maintenance and ins ections March 15 - June 6, '1978 N/A
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved lNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION (o/77)
El
'E
APPENDIX D DOCKET NO. 50 335 REASOH h: EI}UIPMENT PAILURE (EXPLAIN)
St. Lucia B: MAINT. OR TEST UNIT SIIUTDOIINS AND PONER REDUCTIONS UNIT NAME Unit No.
C: REPUELING DATE Januar 7. 197B D: RECULATORY RESTRICTION E: OPERATOR TRAINIHG AND V. T. Chilson COHPLETED BY LICENSE EXAMIHATION P: ADMlNISTRATIVE TELEPIIONE (305 552-3824 Ge OPFRATIONAL ERROR (EXPLAIN) REPORT HOHTH DECEMBER 1977 II: OTIIER (EXPLAIN)
METIIOD 1: MANUAL METIIOD OP 2o JIANUAL SCRAM TYPE SHUTTIHG DOWN 3: AUTOMATIC SCRAII Pl PORCED DURATION TIIE REACTOR OR 4: OIIIL'R (EXPLAIN) NO+ DATE S: SCIIEDULED (IIOURS) REASON(l) REDUCING POIIER(2) CORRECTIVE ACTIONS/COHMENTS 36 77-12-20 10.5 Unit was tripped by actuation of loss of field relay caused by spurious operation of generator field breaker.
(Non-nuclear system)
SIDDIARYl Unit operated at approximately 1002 R.P. except for outage of Dec. 20, 1977.