ML24135A094

From kanterella
Jump to navigation Jump to search
Periodic Update to the Updated Final Safety Analysis Report
ML24135A094
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/09/2024
From: Rasmus P
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML24135A107 List:
References
L-2024-080
Download: ML24135A094 (5)


Text

Security Related Information - Withhold from Public Disc losure Und e r 10 CFR 2.390

L-2 024 -0 80

May 9, 2024

U.S. Nu c lear Reg ula tory Co m m issio n ATTN : Doc um ent Co ntro l Desk Wash ingto n DC 20555-000 1

Re: T urk ey Po int Nuc lea r Ge n e ra tin g Sta tion, Un its 3 and 4 Do ck et Nos. 50-25 0 and 50-251 Re n ewed Lice n se Nos. DP R-3 1 an d DPR-41

Pe rio dic U pd ate to the U pd a te d Fin a l Sa fety Ana lys is Repo rt

Purs u a n t to Tec hnica l Spe cifica tion (TS) 10 CFR 50.7 1(e)(2), Flo rida Powe r & Light Co m pany (F PL) is sub m itting Tu rkey Po int Uni t 4 Cycle 33 U pdated Final Sa fety A n a lysis Report (U F SA R ). A n ew lice n see co n trolle d Tec hnica l Re quireme nts Man u a l (TRM) is a lso sub mitted as a n initial issu e in acco rda n ce w ith 10 C FR 50.59 a nd 10 C FR 50.71(e)(2). Ad ditio n a lly, the Lice n se R e n ewa l review is sub m itted in acco rda n ce w ith the req u ireme n ts o f 10 C FR 54.37(b) fo r the c u rre n t U FSA R update pe riod.

Up dated Fina l Sa fety Ana lys is Repo rt 10 CFR 50. 71(e)(2)

This letter subm its the T urk ey Point pe riodic u pdate of the UF SA R in its ent irety (U 4C33), const ituting a tota l replace m ent copy, a nd reflecting c ha n ges since the previou s up da te (U4 C32) sub mitted on Oc tobe r 2 0, 2022.

E ncl os ur e 1 to this letter inclu des a DVD con ta ining a n o n - public version of the T u rkey Po int UFSAR.

E nclo su re 1 con tains sec urity rela ted info rm atio n as defined b y 10 CFR 2.390( d) and shou ld be w ithhe ld from p ublic disc los ur e.

E ncl os ur e 2 to this lette r includ es a DVD co nta in ing a pu b lic version (redac ted) o f the Tu rkey Po int U FSAR.

Tec hnic a l Requirements Ma nu al 10 CFR 50. 71(e)(2)

Th e T R M is a n ew lice n sin g basis doc um e nt co nta ining T S inform atio n that w as p laced u n der licen see c o ntrol. A ltho u g h m ain ta ine d as a sepa rate licen se basis d oc um e nt, the TR M is co n sid ered part of the U FSAR a nd su b sequ e ntly, c han ges to the T R M are go ve rn ed by 10 CFR 50.59. NRC ap prov a l for the re loca tion of TS info rma tion was give n in "T ur key Po int Nu c lear Ge n eratin g U nits Nos. 3 an d 4 -

Issu a n ce o f Ame ndm ent Nos. 297 a nd 290 Rega rding Co nv e rsion to Im p roved Sta nd ar d Tec hn ical Spec ifica tio n s (M L23234 A 192)," da te d Septe mb e r 27, 2023.

E ncl os ur e 3 to this letter inc ludes a DVD co nta ining the initia l issue, T urk ey Po int, Re visio n 0.

Sec urity Re la ted Infor m a tio n - W ithhold Un der 10 CF R 2.390 E n c losure 1 Conta ine d Sec ur ity Re lated In fo rma tion,

Up o n Sepa ra tion of En clos u re 1 this Lette r is Non - Sec urity Re lated

Flmida Pow e, & Light Compaoy,AO s)


------- ~, ~n 9760 SW 344th Street, Hom e stead, F L 33035 I \\J IL I<-.

Security Related Information -Withhold from Public Disclosure Under 10 CFR 2.390

L-2024-080 Page 2 of 2

License Renewal Summary Report 10 CFR 54.37(b)

The license renewal review addressed the requirements of 10 CFR 54.37(b) for the current UFSAR update period. This review did not result in any newly identified systems, structures or components per the requirements of 10 CFR 54.37(b).

This letter contains no new regulatory commitments.

Should you have any questions regarding this submission, please contact Mr. Kenneth Mack, Fleet Licensing Manager, at (561) 904-3635.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

Executed on the 9th day of May 2024.

Sincerely,

Paul Rasmus ~

General Manager, Regulatory Affairs Florida Power & Light Company

Enclosures (3)

1. DVD of Updated Final Safety Analysis Report (4C33) (Non-Public Version)
2. DVD of Updated Final Safety Analysis Report (4C33) (Public Version - Redacted)
3. DVD of Technical Requirements Manual, Revision 0

cc: Regional Administrator, Region II, USNRC Project Manager, Turkey Point Nuclear Generating Station, USNRC Resident Inspector, Turkey Point Nuclear Generating Station, USNRC

Security Related Information - Withhold Under 1 0 CFR 2.390 Enclosure 1 Contained Security Related Information, Upon Separation of Enclosure 1 this Letter is Non-Security Related

Florida Power & Light Company

9760 SW 344th Street, Homestead, FL 33035

ENCLOSURE 2

FLORIDA POWER & LIGHT COMPANY TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4

UPDATED FINAL SAFETY ANALYSIS REPORT (4C33)

PUBLIC VERSION - REDACTED ENCLOSURE 3

FLORIDA POWER & LIGHT COMPANY TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4

TECHNICAL REQUIREMENTS MANUAL, REVISION 0 Security Related Information -Withhold from Public Disclosure Under 10 CFR 2.390

ENCLOSURE 1

FLORIDA POWER & LIGHT COMPANY TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4

UPDATED FINAL SAFETY ANALYSIS REPORT (4C33)

NON-PUBLIC VERSION

Security Related Information - Withhold Under 10 CFR 2.390 Enclosure 1 Contained Security Related Information, Upon Separation of Enclosure 1 this Letter is Non-Security Related